Browse > Article
http://dx.doi.org/10.7781/kjoss.2012.24.5.559

The Characteristics of Structural Behavior of Temporary Bridge Using Continuous Cross Beam  

Joo, Hyung-Joong (ISIS ENC)
Lee, Young-Geun (Dept. of Civil Engineering, Hongik University)
Lee, Dong-Hyuk (Halla Engineering & Construction Corp.)
Yoon, Soon-Jong (Dept. of Civil Engineering, Hongik University)
Publication Information
Journal of Korean Society of Steel Construction / v.24, no.5, 2012 , pp. 559-569 More about this Journal
Abstract
Cross-beam in the existing temporary bridge system is usually installed to prevent the lateral-torsional buckling of girders and to promote the construction efficiency. However, most of this cross-beams are connected to the girder web by bolts, and therefore, gravitational load resisting capacity of the cross-beams are negligibly small. In recent years, new temporary bridge system, in which the cross-beams and girders are connected to resist the external loads as a unit, was developed. In this paper, we present the experimental and analytical study results pertaining to the structural behavior and load carrying capacity of new temporary bridge system. From the results of study, it was found that the continuous cross-beam increased the flexural rigidity and reduced the maximum flexural stress in the girder. In addition, it was also found that the new temporary bridge system developed is more appropriate for the application in the long-span temporary bridge.
Keywords
temporary bridge; continuous cross beam; load carrying capacity; lateral distribution; structural behavior;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 이강연, 최훈, 김의태, 이동혁, 윤순종(2011) 일체형 가로보를 이용한 가설교량의 구조적 거동, 2011년도 대한 토목학회 정기학술대회 논문집, 대한토목학회, pp.1072-1075. Lee, K.Y., Choi, H., Kim, E.T., Lee, D.H., and Yoon, S.J. (2011) Structural Behavior of Temporary Bridge Using Contitnuous Cross Beam, Proceedings of Korean Society of Civil Engineers Conference, KSCE, pp.1072-1075 (in Korean).
2 이강연, 이영근, 주형중, 윤순종(2012) 일체형 가로보를 이용한 가설교량에 대한 실험적 연구, 2012년도 한국강구조학회 학술대회 발표집, 한국강구조학회, pp.35-36. Lee, K.Y., Lee, Y.G., Joo, H.J., and Yoon, S.J. (2012) An Experimentsl Investigation on the Temporary Bridge System Using Continuous Cross Beam, Proceedings of Annual Conference of Korean Society of Steel Construction, KSSC, pp.35-36 (in Korean).
3 황일훈(2007) Tall-Beam 가설교량의 구조거동에 관한 연구, 석사학위논문, 충주대학교. Hwang, I.H. (2007) A Study on the Structural Behavior of Tall-Beam Temporary Bridge, Master Thesis, University of Chungju, Korea (in Korean).
4 강창구(2010) H-형강에 고강도 강판을 용접부착한 가설 교량용 프리스트레스 거더 제작 기술, 한국강구조학회지, 한국강구조학회, 제22권, 제3호, pp.27-31. Kang, C.K. (2010) High Prestressed Plate Girder, Journal of Korean Society of Steel Construction, KSSC, Vol. 22, No. 3, pp.27-31 (in Korean).
5 장지훈, 이승재, 이상우, 김준환(2010) 다단계 온도프리 스트레싱공법을 적용한 Heat 가설교량, 한국강구조학회지, 한국강구조학회, 제22권, 제3호, pp.9-14. Jang, J.H., Lee, S.J., Lee, S.W., and Kim. J.H.(2010) HEAT Temporary Bridge Using Multi-Stepwise Thermal Prestressing Method, Journal of Korean Society of Steel Construction, KSSC, Vol. 22, No. 3, pp.9-14 (in Korean).
6 ANSI (1995) Short Span Steep Bridge, American Iron and Steel Institute.
7 윤동용, 은성운(2006) 압연형강(H형강) 거더교의 가로보가 활하중 횡분배에 미치는 영향, 한국강구조학회논문집, 한국강구조학회, 제18권, 제5호, pp.535-541. Yoon, D.Y. and Eun, S.W. (2006) Effect of Cross Beams on Live Load Distribution in Rolled H-Beam Bridge, Journal of Korean Society of Steel Construction, KSSC, Vol. 18, No. 5, pp.535-541 (in Korean).   과학기술학회마을
8 윤순종(2012) CAP 장지간 가설교량 공법에 대한 구조적 거동평가 연구, 연구보고서, 홍익대학교 부설 과학기술연구소. Yoon, S.J. (2012) A Study of Evaluation on the Structural Behavior of CAP Long Span Temporary Bridge, Research Report, Hongik University, Research Institute of Science and Technology, Korea (in Korean).
9 강덕만(2001) 외부 후긴장 보강 공법의 적용에 따른 합성형교 횡분배 거동에 대한 연구, 석사학위논문, 서울산업대학교. Kang, D.M. (2001) A study on the transverse distribution behavior of composite girder bridge in the applying the external post-prestressing method, Master Thesis, Seoul National University of Technology, Korea (in Korean).