• Title/Summary/Keyword: complex building

Search Result 1,595, Processing Time 0.028 seconds

Short term unsteady wind loading on a low-rise building

  • Sterling, M.;Baker, C.J.;Hoxey, R.P.
    • Wind and Structures
    • /
    • v.6 no.5
    • /
    • pp.403-418
    • /
    • 2003
  • This paper presents an extensive analysis of the short term, unsteady wind loading on a low-rise building. The building is located in a rural environment and only the specific situation of wind flow orthogonal to the long face of the structure is considered. The data is analysed using conventional analysis and less traditional methods such as conditional sampling and wavelet analysis. The nature of the flow field over the building is found to be highly unsteady and complex. Fluctuating pressures on the windward wall are shown to a large extent to be caused by the fluctuations in the upstream flow, whereas extreme pressures on the roof are as a result of high intensity small scale flow structures. On the roof of the building a significant amount of energy is shown to exist at frequencies above 1 Hz.

A Correction System of Odometry Error for Map Building of Mobile Robot Based on Sensor fusion

  • Hyun, Woong-Keun
    • Journal of information and communication convergence engineering
    • /
    • v.8 no.6
    • /
    • pp.709-715
    • /
    • 2010
  • This paper represents a map building and localization system for mobile robot. Map building and navigation is a complex problem because map integrity cannot be sustained by odometry alone due to errors introduced by wheel slippage, distortion and simple linealized odometry equation. For accurate localization, we propose sensor fusion system using encoder sensor and indoor GPS module as relative sensor and absolute sensor, respectively. To build a map, we developed a sensor based navigation algorithm and grid based map building algorithm based on Embedded Linux O.S. A wall following decision engine like an expert system was proposed for map building navigation. We proved this system's validity through field test.

Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.3
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work (마감공사 생산성 향상을 위한 리프트 카 최적배치 모델)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

A Development of Agent-Based IEDs for Integration Control of Building Microgrid in Smart Green Building (그린빌딩에서의 빌딩마이크로그리드 통합제어를 위한 에이전트용 IED 개발)

  • Hong, Won-Pyo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.35-43
    • /
    • 2012
  • In this paper, a development of agent-based IEDs(Intelligent electronic devices) for integration control of building microgrid in smart green building are proposed. To manage and control this complex energy system of smart green buildings, multi-agent system based networks is needed. Thus, several IEDs for utilizing multi-agent system are developed and modified for the their verification of performance as agent modules functions in the integrated experimental equipment. The good performance of these IED agents are verified from experimental results obtained from seamless bi-directional communication by SOAP/XML protocol between PC agent and IED agent.

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

Structural Design of High-Rise Concrete Condominium with Wall Dampers for Vibration Control

  • Tsushi, Takumi;Ogura, Fumitaka;Uekusa, Masahiro;Kake, Satoshi;Tsuchihashi, Toru;Yasuda, Masaharu;Furuta, Takuya
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.201-209
    • /
    • 2019
  • This paper presents a structural design of the "(Tentative Name) Toranomon Hills Residential Tower" which is currently under construction in Tokyo. The building is a reinforced concrete high-rise residential complex building with 54 stories above ground, 4 basement levels, and a building height of about 220 m. It is a requirement to provide the highest grade of residence in Japan, and in terms of the structural design, it is required to provide wide and comfortable spaces with high seismic performance. These requirements are satisfied by providing a total of 774 vibration control walls of two types. Also, to further improve the structural performance, steel fibers at the rate of 1.0vol% are provided in the ultra-high strength concrete used in the column members.

An Analysis on the Factors Affecting the Level of Resident's Satisfaction in Certified Environment Friendly Apartment (친환경 공동주택 인증단지의 주거 만족도 영향요인 분석)

  • Lee, Geun-Hee;Park, Hee-Seog;Jo, Yong-Sung
    • Journal of the Korean housing association
    • /
    • v.21 no.4
    • /
    • pp.121-128
    • /
    • 2010
  • Many business enterprises in domestic housing industry are focusing on the development of environment friendly apartment complex to strengthen the competitiveness by upgrading their company's image through differentiation of the qualities and satisfying the customer's needs. Many apartment complex have achieved temporary or real certification by green building certification system, but there weren't enough studies on how much residents are satisfied by their certified complex. In this study, we want to clarify the factors of resident's satisfaction level in certified environment friendly complex by comparing the social and economical characteristics of resident. For this study, we chose and compare 4 environment friendly apartment complex considered to be built by the best environmental way in metropolitan area, and 4 other apartment complex which are also considered to be similar in terms of the condition of location and period of stay.

Foundation Design the 151 story Incheon Tower in Reclamation Area

  • Abdelrazaq, Ahmad;Badelow, Frances;Kim, Sung-Ho;Park, Yung-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.157-171
    • /
    • 2009
  • A 151 storey super high-rise building located in an area of reclaimed land constructed over soft marine clay in Songdo, Korea is currently under design. This paper describes the design process of the foundation system of the supertall tower, which is required to support the large building vertical and lateral loads and to restrain the horizontal displacement due to wind and seismic forces. The behaviour of the foundation system due to these loads and foundation stiffness influence the design of the building super structure, displacement of the tower, as well as the raft foundation design. Therefore, the design takes in account the interactions between soil, foundation and super structure, so as to achieve a safe and efficient building performance. The site lies entirely within an area of reclamation underlain by up to 20m of soft to firm marine silty clay, which overlies residual soil and a profile of weathered rock. The nature of the foundation rock materials are highly complex and are interpreted as possible roof pendant metamorphic rocks, which within about 50m from the surface have been affected by weathering which has reduced their strength. The presence of closely spaced joints, sheared and crushed zones within the rock has resulted in deeper areas of weathering of over 80m present within the building footprint. The foundation design process described includes the initial stages of geotechnical site characterization using the results of investigation boreholes and geotechnical parameter selection, and a series of detailed two- and three-dimensional numerical analysis for the Tower foundation comprising over 172 bored piles of varying length. The effect of the overall foundation stiffness and rotation under wind and seismic load is also discussed since the foundation rotation has a direct impact on the overall displacement of the tower.

  • PDF

A Case Study on Explosive Demolition of Turbine Building of Steel Frame Structure (터빈동 철골구조물 발파해체 시공사례)

  • Hoon, Park;Sung-Woo, Nam;You-Song, Noh;Chul-Gi, Suk
    • Explosives and Blasting
    • /
    • v.40 no.4
    • /
    • pp.35-46
    • /
    • 2022
  • While the construction of dismantling the old industrial complex and restoring the dismantled industrial site to its original natural environment the is underway. In this paper, we introduce a case of dismantling a turbine building which one of the a large steel frame structures in an old industrial complex by applying the progressive collapse method among the blasting demolition methods. We used a charge container that generates a metal jet to cut dismantling the turbine building. The thickness of the steel structure was adjusted to 30 mm or less by applying gouging, which was a method of digging deep grooves by gas and oxygen flames or arc thermal, in the part where the cutting thickness was thick in the blasting section. The total amount of charge used for the blasting of turbine building was 175 kg, 165 electronic detonators and 124 charge containers. As a result of the blasting demolition, the turbine building was collapsed precisely according to the estimated direction. The blasting demolition was completed without causing any damage to the surrounding facilities.