• Title/Summary/Keyword: completion of work

Search Result 277, Processing Time 0.037 seconds

A Study on Applying 3D Automatic Displacement Measurement System for Safety Monitoring of Building Demolition Works (건축물 해체공사 안전 모니터링을 위한 3차원 자동변위계측 시스템 활용 방안 연구)

  • Park, Han-Bin;Han, Hye-Rim;Kim, Taehoon;Cho, Kyuman;Cho, Chang-Geun;Kim, Hyeong-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.229-230
    • /
    • 2022
  • According to the national building status, there are a total of 2.89 million buildings that are over 30 years old after completion, and the number is increasing by more than 70,000 to 80,000 buildings every year. As a result, the demand for demolition works is also increasing, and more than 3 to 4 collapse accidents occur steadily every year during demolition work. Major causes of accidents include non-compliance with plans, negligence of on-site supervisors, and failure to secure structural safety. Due to the strengthening of the Severe Disaster Punishment Act, there is growing interest in the demand for secure management of collapse detection during demolition works. Therefore, this study aims to investigate the applicability of real-time safety monitoring systems using a total station capable of 3D automatic displacement measurement in building demolition work for securing structural safety by the load changes during the demolition process.

  • PDF

Survey for Patient Satisfaction Rate & Patient Leading System Development through RFID and OCS Worklist Program Connection (RFID와 Worklist 중심의 OCS 프로그램 접목을 통한 환자유도시스템 개발과 환자만족도 조사)

  • Ji, Yeon-Sang;Dong, Kyung-Rae;Kim, Chang-Bok
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.5
    • /
    • pp.197-205
    • /
    • 2009
  • With the introduction of the computer, convenience at work may have increased but flexibility decreased along with a tendency for humans to become secondary to computers with regards to work schedules. As it exists, from entering the department of radiology to completion of imaging requires a great deal of time and difficulties in understanding the imaging process adds to patient dissatisfaction. Since clinics use RFID bars to track patient locations at comprehensive medical testing centers, departments of radiology may apply RFID and Worklist at the core of the OCS system in order to increase work efficiency and improve work flow. As a result of developing an RFID and Worklist centered OCS program, there was a vast improvement in patient satisfaction and work flow. Theses results are the basis of an RFID system that in the future may be connected to PACS and other systems with an intergrated Worklist. There is a need to realize a plan the can offer ubiquity to hospital work.

A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers (건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su;Yi, Dong-Ryul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.12
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

P2P-based Regional Matchmaking Techniques for Distributing Redundant-works in Volunteer Computing Environments (자발적 컴퓨팅 환경에서 중복작업 분배를 위한 P2P 기반 지역적 매치메이킹 기법)

  • Cheon, Eun-Young;Kim, Mi-Kyoung;Kuk, Seung-Hak;Kim, Hyeon-Soo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.11
    • /
    • pp.831-835
    • /
    • 2009
  • Volunteer computing is a computing paradigm in which the operations of a large-scale application are processed using idle resources of Internet-connected computers. The redundant-work distribution techniques used in the volunteer computing environment cause some problems like delay of the work completion time or inefficiency of the work execution due to continuous requests of the work redistribution because the techniques do not consider the characteristics of works and dynamic resources. To cope with such problems this paper suggests a P2P based regional matchmaking technique which can redistribute works in consideration of the characteristics of the works and the participant resources. The techniques consist of the profiles for works/resources, the module for monitoring the available resources spaces, the protocols for the matching request/reply, the module for match-ratio calculation, and so on.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

Development of Firefighting Performance Test Drills while Wearing Personal Protective Equipment (소방방화복을 착용했을 때의 소방진압 업무 적합도 평가 프로토콜의 개발)

  • Kim, Siyeon;Lee, Joo-Young
    • Fire Science and Engineering
    • /
    • v.30 no.1
    • /
    • pp.138-148
    • /
    • 2016
  • A firefighting simulation was developed in order to assess the physical work capacity of firefighters. The simulation consisted of eight common firefighting tasks, including walking with radiant heat for 3 min while wearing full personal protective equipment (PPE). Nine professional firefighters performed the test a total of three times with a 5 min rest interval between each session. The entire series of tests took approximately 30 min to complete ($381{\pm}30s$). Rectal temperatures were found to increase from $37.4{\pm}0.3^{\circ}C$ to $38.5{\pm}0.4^{\circ}C$, while heart rates were found to increase from $92{\pm}18bpm$ to $185{\pm}13bpm$ during testing. Time to completion of the test drills and non-modified physical fitness values showed a significantly negative correlation (r = -0.728, p < 0.05). Firefighters who had longer periods of firefighting service had longer duration time and also recorded higher scores using an integrated scoring system of time to completion (TTC) and physiological strain index (PhSI). The results indicated that the determination of TTC alone can be a misrepresentation of capability, as it neglects to account for accumulated heat strain. The simulated firefighting test provided a useful insight into physical fitness level, but also the comprehensive work capacity of the firefighters when assessed based on TTC and PhSI.

Basic Research on Evaluation of Defect Repair Period of Finishing Works in Apartment Houses according to Performance Data (실적자료에 의한 공동주택 마감공사의 하자보수기간의 적절성 평가 기초연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.245-246
    • /
    • 2015
  • Cases of lawsuit and conflict are increasing because of defects in apartments in use after the completion of construction. Further, with changes in the consciousness of residents and in the social environment, many residents are showing interest in defect-related lawsuits. However, the term of warranty liability defined in the current law is not practically appropriate, and the verification of the determination of the term of warranty liability is insufficient. Against this background, this research aims to evaluate the appropriateness of defect repair periods by examining the actual defect condition of the finishing work among the various defects related to apartments. Collected performance data are analyzed by statistical techniques by considering the defect occurrence rate per construction type and the construction year of the finishing work in apartment construction. The analysis results will be used as basic data for evaluating the appropriateness of the standards for the term finishing works warranty liability.

  • PDF

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.