• 제목/요약/키워드: completion of work

검색결과 279건 처리시간 0.026초

THE COMPLETION OF SOME METRIC SPACE OF FUZZY NUMBERS

  • Choi, Hee-Chan
    • 한국수학교육학회지시리즈B:순수및응용수학
    • /
    • 제2권1호
    • /
    • pp.9-16
    • /
    • 1995
  • D. Dubois and H. Prade introduced the notions of fuzzy numbers and defined its basic operations [3]. R. Goetschel, W. Voxman, A. Kaufmann, M. Gupta and G. Zhang [4,5,6,9] have done much work about fuzzy numbers. Let $\mathbb{R}$ the set of all real numbers and $F^{*}(\mathbb{R})$ all fuzzy subsets defined on $\mathbb{R}$. G. Zhang [8] defined the fuzzy number $\tilde{a}\;\in\;F^{*}(\mathbb{R})$ as follows : (omitted)

  • PDF

자원제약하의 복수 프로젝트 일정계획을 위한 휴리스틱 알고리즘 (A Heuristic Algorithm for Resource-Constrained Multi - Project Scheduling)

  • 공명달;김정자
    • 산업공학
    • /
    • 제13권1호
    • /
    • pp.110-119
    • /
    • 2000
  • Resource-constrained project scheduling is to allocate limited resources to activities to optimize certain objective functions and to determine a start time for each activity in the project such that precedence constraints and resource requirements are satisfied. This study suggests a multi-project scheduling model which can level work loads, make the most of production capacity and restrain the delay of delivery by developing a heuristic algorithm which minimizes the project completion time and maximizes the load rate under resource constraints.

  • PDF

농촌지역 아파트 공사 설계VE의 공간별 적용방법 분석 연구 (A study of analysis about application of design value engineering in the rural apartment building)

  • 민경석
    • 한국농촌건축학회논문집
    • /
    • 제8권1호
    • /
    • pp.17-24
    • /
    • 2006
  • The purpose of this study is to provide the systematic report and analysis about Apartment VE application in Design Phase. In this study, the method of VE application is classified into foure groups-changing materials, changing a method of construction, acceptance of new technology, and use of new device. The facts found in this study can be summarized as follows. Application rate of VE is highest in building circumference parts. The main reason would be that there are many applicable factors according to locations, types of work, etc. Parking lots also show similar results with the same reason. It means there are a lot of possibility to adapt value engineering in these steps during the work. So far application of value engineering has been so limited that just small changes of process or method have been tried. One reason is the lack of challenging and the other is some characteristics of construction work which is very difficult to fix after completion. In the future, it would be more efficient to apply new technology and new device in construction work. Though these attempts have been ignored in Korea so far, there are still lots of possibilities to be developed in value engineering.

  • PDF

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • 한국건축시공학회지
    • /
    • 제12권2호
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

소방공무원 공개채용시험에서의 학점이수제 도입방안에 관한 연구 (The Research on the Introduction of Unit Completion System into the Opened Examination for the Fire Service)

  • 공하성
    • 한국화재소방학회논문지
    • /
    • 제21권4호
    • /
    • pp.88-98
    • /
    • 2007
  • 본 연구는 소방공무원 공개채용시험의 자격기준을 보완하여 소방공무원의 자질 및 전문성향상에 기여하고, 소방조직의 발전을 도모하는데 목적이 있다. 현행 소방공무원 공개채용시험에서는 일반직 공무원의 시험과 대부분 동일한 과목으로 이루어져 있어 무분별한 경쟁을 초래할 우려가 있다. 이는 결국 소방공무원의 전문성이 결여되어 대 국민 서비스 질 저하로 인한 사기저하의 원인으로 작용할 수 있다. 소방안전관리학과 학생과 소방공무원을 대상으로 설문을 작성 분석하고 각종 문헌 자료 등을 토대로, 소방공무원 공개채용시험에서의 소정학점을 이수한자에 한하여 시험자격을 부여하는 학점 이수제를 통하여 채용 후 발생되는 자질부족과 업무에서 오는 전문성결여 및 이로 인한 스트레스 등의 문제를 해결해야 할 것이다. 또한 소방조직의 전문성을 높여 우리나라가 선진소방에 한 층 더 가까워지는데 기여할 것이다.

상주 소방감리업무의 현실적 문제점에 대한 연구 -대전지역을 중심으로- (A Study on the Actual Problems of Field Fire Supervision System(Focus to Dajeon City))

  • 최만철;김병석
    • 대한안전경영과학회지
    • /
    • 제13권1호
    • /
    • pp.31-39
    • /
    • 2011
  • In this study, supervision resides fire mission against problems associated with case studies and surveys done through the side of the field work, technical personnel, fire management, including fire code aspects classified into three kinds of items dealt with the issue. Started at the scene of the problem in terms of performance, the issue of the construction process, mainly dealt with the issue at the time of completion. Fire management side, supervisor of technical personnel, human resources management issues, contract issues, fire code level, the frequent revisions of fire regulations, supervision, processing delays of the resulting report, the problem resides with the expansion of Fire Supervision target was mentioned. Finally, the target for each hierarchical supervision, and resident supervisor of the need for supervision of work performance test was carried out by the correlation.

Airtightness of Light-Frame Wood Houses built in Daejeon and Chungnam Area

  • Jang, Sang-sik;Ha, Been
    • Journal of the Korean Wood Science and Technology
    • /
    • 제45권2호
    • /
    • pp.147-158
    • /
    • 2017
  • Among the energy consumption in building, the heating energy takes the largest part. Therefore, it is important to minimize the heat energy loss in building for the reduction of overall energy use in construction. The most important points for the minimization of energy loss in building are insulation and airtightness. Especially, in wood houses, airtightness is very important for energy saving as well as increase of durability. However, the researches on airtightness of wood buildings have been started recently and are very deficient especially in Korea. In this study, air leakage properties and airtightness performance were evaluated for light-frame wood houses built in Daejeon and Chungnam area. Total 7 houses were evaluated, among which four houses (Case 1 to Case 4) were in the construction stage before interior finish and the other three houses (Case 5 to Case 7) were after completion of construction work. The tests for airtightness were conducted by pressurization-depressurization method, and the factors included in the measurements includes air leakage rate at 50 Pa (CMH50), air change rate at 50 Pa (ACH50), equivalent leakage area (EqLA) and EqLA per floor area. As a result of this study, key air leakage points in wood houses were found to be the gaps between floor and wall, the holes for wiring and plumbing, the double glasses windows and the entrance doors. The average value of ACH50 for the houses after completion of construction work was $3.5h^{-1}$ that was similar to Europe standard ($3.0h^{-1}$). ACH50 was proportional to EqLA per floor area but inversely proportional to the internal volume, the net floor area and the area of window.

말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계 (Design of the reinforced concrete lining in bakun diversion tunnels)

  • 지왕률;임태정
    • 터널과지하공간
    • /
    • 제9권1호
    • /
    • pp.20-26
    • /
    • 1999
  • 바쿤 수력발전 프로젝트에서 발전댐의 건설은 가배수로 터널의 완공에 따라 시작되믈 공사기간 측면에서 가배수로 터널의 완공시기는 전체 프로젝트에서 매우 중요한 요소이다. 바쿤 가배수로 터널의 내부단면은 물의 저항을 최대한 줄이기 위하여 원형으로 설계되었으며, 내부직경 12m 인 3개의 터널로 구성되어 있다. 일반적으로 터널 시공과정의 마무리 단계에서 수행되는 터널 라이닝 작업은 굴착 및 지반보강 공정과 더불어 시공비와 공사기간에 많은 영향을 끼치므로 적정한 수준의 라이닝 설계가 요구된다. 바쿤 가배수로 터널에 있어, 라이니으이 두께는현장여건에 따라 다소 차이가 있으나 500~700mm로 타설되었다. 가배수로 터널의 원설계안에 따르면 터널내 전체 라이닝에 필요한 보강콘크리트의 철근량은 5,985 ton 이었으나, 암반의 상태와 여러종류의 하중조건을 고려하여 5종류의 철근 보강 콘크리트 유형으로 구분한 후에 각각의 유형에 따른 상세설계를 통하여 최종적으로 소요 철근량을 2,178 ton으로 감소시킬 수 있었다. 감소된 양은 원설계에서 제시된 양의 절반에 해당되며, 이에 따라 공사기간 및 건설비용을 절감시킬 수 있었다.

  • PDF

건설기술진흥법 안전관리계획서의 실행방안에 관한 연구 (A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act)

  • 신성수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

지표침하판계측을 통한 연약지반 침하분석 사례연구 (A Case Study on the Analysis of Soft Ground Consolidation by the Measurement of Surface Settlement Plate)

  • 김준석
    • 도시과학
    • /
    • 제9권2호
    • /
    • pp.51-56
    • /
    • 2020
  • The installation of soft ground instruments and the performance of measurement and management of the measurement shall be carried out in order to ensure the safety of the construction work and to improve the quality of the construction work. The purpose of the pressure density deposition calculation is to determine the stability of the foundation ground and the formulation by measuring and calculating the density conditions generated on the soil through the period of neglect after completion of the soil at each stage. In practice, it is judged that the analysis by the hyperbolic method can be applied to the safety side.