Reinforced Earth Retaining Wall of The Collapsed-A Case Study. (보강토옹벽의 사고사례에 관한 연구)

  • Yoo, Chung-Sik;Jung, Hyuk-Sang;Lee, Soung-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.958-967
    • /
    • 2004
  • This paper deal with cause and analysis about case of collapsed reinforced-soil retaining wall. The analysis of the cause was carried through experimentation, slop stability analysis and literature study. The experimentation treated the large direct shear test, the hydraulic conductivity test and the other basic test through backfill extracted from collapsed reinforced-soil retaining wall. The ultimate tensile strength was established by rib tensile strength test of geogrid. The analysis of internal and external stability of reinforced-soil retaining wall was performed on the basis of parameters. The result of analysis, reinforced-soil retaining wall and the slope at the dry season are stable. However, the factors that fine-grained soil at hydrometer test exceed the standard of the design, rainfall duration is too long at the time of collapse and monthly pricipitation is heavy are cause of the collapse.

  • PDF

A Case Study on the Restoration of Collapsed Geosynthetics Reinforced Soil Wall Using Limit Equilibrium and Numerical Analyses (한계평형해석과 수치해석에 의한 붕괴된 보강토 옹벽 복구 사례에 관한 연구)

  • Won, Myoung-Soo;Kim, Hyeong-Joo;Kim, Young-Shin;Choi, Jeong-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.11
    • /
    • pp.107-118
    • /
    • 2013
  • Geosynthetic reinforced soil (GRS) walls have been increasingly applied recently due to its numerous geotechnical engineering applications. However failure occurs in some cases of constructed GRS walls. These GRS wall failures are mostly due to the unpredictable characteristics of intensive rainfall. Hence, the need for new and innovative ideas for rehabilitation methods has been getting attention. This paper introduces a case study for the design and restoration method of collapsed GRS wall using Limit equilibrium and Numerical Analyses. Restoration method includes: (1) soil nailing without backfill excavation and (2) reconstruction with GRS wall after collapsed backfill excavation. Analyses results show minimal horizontal displacements and shear strain on the reinforced concrete facing for the restoration case with soil nailing. On the other hand, horizontal displacements are developed in the middle of the mortar block facing and shear strains are developed at the bottom facing with spiral curves for the reconstructed GRS wall after collapsed backfill excavation. Therefore, the collapsed GRS wall was restored with the soil nailing without backfill excavation and its construction procedures are discussed in this paper.

A Case Study of The Collapsed Reinforced-Soil Retaining Wall (보강토옹벽의 사고사례에 관한 연구)

  • Yoo, Chung-Sik;Jung, Hyuk-Sang;Lee, Soung-Woo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.3 no.2
    • /
    • pp.13-21
    • /
    • 2004
  • This paper deal with the analysis of the causes about case of collapsed reinforced-soil retaining wall. The analysis of the cause was carried through experimentation, slop stability analysis and literature study. The experimentation treated the large direct shear test, the hydraulic conductivity test and the other basic test through backfill extraction from collapsed reinforced-soil retaining wall. The ultimate tensile strength was established by rib tensile strength test of geogrid. The analysis of internal and external stability of reinforced-soil retaining wall was performed on the basis of parameters. The result of analysis, reinforced-soil retaining wall and the slope at the dry season are stable. However, the factors that fine-grained soil at hydrometer test exceed the standard of the design, rainfall duration is too long at the time of collapse and monthly pricipitation is heavy, which are causes of the collapse.

  • PDF

Case Study on the Countermeasure Methods and Collapsed Sources of Segmental Retaining Wall Considering Site Conditions (시공환경을 고려한 블록식 보강토옹벽의 붕괴요인 분석 및 대책방안 사례연구)

  • Han, Jung-Geun;Cho, Sam-Deok;Jeong, Sang-Seom;Lee, Kwang-Wo;Kim, Ji-Sun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.3
    • /
    • pp.35-43
    • /
    • 2005
  • The geosynthetic reinforced segmental retaining walls(SRW) are improved that the disadvantage of existed retaining wall and the workability in field. Recently, the segmental retaining wall is replacing the exited wall because it is quickly advanced to using by the block in-situ. The use, therefore, is increasing. But, the trends of the large scaled construction was developed that the problems likely to crack and collapse, those are caused of careless in design and construction of SRW not considering about various surrounding conditions. In this study, the cause analysis on destructed SRW was carried out that based on the datum of measured displacement of walls, rainfall features and ground sounding conditions. Also, the analysis of the global slope stability was carried out on collapsed section and non-collapsed section using critical equilibrium method. For the rational stability and analysis of slope including SRW structure, the site conditions including situations of topography, ground and histories of construction and collapse etc should be considered. The rational countermeasure methods for non-collapsed and collapsed areas may be sustained as much as possible current state.

  • PDF

Damage Proxy Map over Collapsed Structure in Ansan Using COSMO-SkyMed Data

  • Nur, Arip Syaripudin;Fadhillah, Muhammad Fulki;Jung, Young-Hoon;Nam, Boo Hyun;Kim, Yong Je;Park, Yu-Chul;Lee, Chang-Wook
    • The Journal of Engineering Geology
    • /
    • v.32 no.3
    • /
    • pp.363-376
    • /
    • 2022
  • An area under construction for a living facility collapsed around 12:48 KST on 13 January 2021 in Sa-dong, Ansan-si, Gyeonggi-do. There were no casualties due to the rapid evacuation measure, but part of the temporary retaining facility collapsed, and several cracks occurred in the adjacent road on the south side. This study used the potential of synthetic aperture radar (SAR) satellite for surface property changes that lies in backscattering characteristic to map the collapsed structure. The interferometric SAR technique can make a direct measurement of the decorrelation among different acquisition dates by integrating both amplitude and phase information. The damage proxy map (DPM) technique has been employed using four high-resolution Constellation of Small Satellites for Mediterranean basin Observation (COSMO-SkyMed) data spanning from 2020 to 2021 during ascending observation to analyze the collapse of the construction. DPM relies on the difference of pre- and co-event interferometric coherences to depict anomalous changes that indicate collapsed structure in the study area. The DPMs were displayed in a color scale that indicates an increasingly more significant ground surface change in the area covered by the pixels, depicting the collapsed structure. Therefore, the DPM technique with SAR data can be used for damage assessment with accurate and comprehensive detection after an event. In addition, we classify the amplitude information using support vector machine (SVM) and maximum likelihood classification algorithms. An investigation committee was formed to determine the cause of the collapse of the retaining wall and to suggest technical and institutional measures and alternatives to prevent similar incidents from reoccurring. The report from the committee revealed that the incident was caused by a combination of factors that were not carried out properly.

A case Study on Collapse Causes and Restoration of Retaining Wall with Vegetated Concrete Block (식생블록 옹벽의 붕괴원인 및 복구방안에 관한 사례 연구)

  • Hong, Gigwon;You, Seung-Kyong;Yun, Jung-Mann;Park, Jong-Beom;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.105-115
    • /
    • 2016
  • This paper describes a restoration of retaining wall, which was collapsed by rainfall. The failure causes was analyzed by field case, and then the countermeasure was suggested. The failure causes confirmed that observance of design and construction criteria was insufficient. It also was the climate condition like a rainfall and inappropriate construction management. The stability analysis for retaining wall, soil improvement and reinforced earth wall was conducted to confirm validity of the countermeasure. The analysis results showed that the suggested construction method satisfied in required safety factors. Therefore, it should be secured the stability of the structure based on the application of appropriate design method and construction management, when structure was constructed.

Analysis on Failure Causes and Stability of Reinforced Earth Wall Based on a Field Case (현장사례를 이용한 보강토옹벽의 파괴원인 및 안정성 분석)

  • Hong, Kikwon;Han, Jung-Geun;Lee, Jong-Young;Park, Jai-Seok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.1
    • /
    • pp.109-114
    • /
    • 2013
  • This paper describes the global stability of the reinforced earth wall, which was collapsed by heavy rainfall. The seepage analysis was conducted to confirm the change effect of groundwater level on slope with reinforced earth wall. The seepage analysis result confirmed that the change of groundwater level is greatly influenced by rainfall. According to the change of groundwater level, the global stability analysis with reinforced earth wall was conducted based on the results of seepage analysis. The safety factor of the slope was 0.476 when the wall is collapsed firstly. The collapse cause analyzed that soil strength was weaken because the ground was saturated by continuous rainfall. Therefore, the global stability, which is considered heavy rainfall, should be conducted at design and construction of reinforced earth wall.

A Study of Analysis and Countermeasure of the Collapsed inclined shaft by a Heavy Rain (집중호우로 인한 OO터널 사갱 붕괴 원인 분석 및 대책에 관한 연구)

  • Yoon, Tae-Gook;Lee, You-Suk;Oh, Hyuk-Hee;Kim, Dong-Soo;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.241-248
    • /
    • 2003
  • In August 2002, side wall of OO tunnel, at the Bonghwa, Kungbuk province, Korea, was collapsed by abruptly applied heavy soil and water pressure to side wall from a inclined shaft when there was a heavy rain. These days, Inclined shaft is used for the purpose of reducing construction time, using ventilation system, using the out of carrying equipment and mucking when we construct tunnel in the world. Recently constructed tunnel has the source of inclined shafts, but the more time elapse, we lose the source of the inclined shaft such as exact position, condition, and the fact that whether inclined shaft is exist or not. Therefore, this study inspected the interior's appearance, analyzed structure to evaluate the reason of collapsing side wall and this study also performed the repairing work. Finally, we show improving maintenance method to prevent that similar accident that might be happened.

  • PDF

Analysis of Triggering Events of a Geosynthetic Wall Slope Failure within Slope Stability Perspective (사면안정측면에서의 보강토 옹벽 붕괴 요인 분석)

  • Yoo, Chung-Sik;Jung, Hye-Young;Jung, Hyuk-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.207-215
    • /
    • 2005
  • This paper presents a case history of a geosynthetics-reinforced segmental retaining wall, which collapsed during a sever rainfall immediately after the completion of the wall construction. In an attempt to identify possible causes for the collapse, a comprehensive investigation was carried out including physical and strength tests on the backfill, stability analyses on the as-built design based on the current design approaches, and slope stability analyses with pore pressure consideration. The investigation revealed that the inappropriate as-built design and the bad-quality backfill were mainly responsible for the collapse. This paper describes the site condition including wall design, details of the results of investigation and finally, lessons learned. Practical significance of the findings from this study is also discussed.

  • PDF

Grounded electrical-source airborne transient electromagnetic (GREATEM) survey of Mount Bandai, north-eastern Japan (접지된 전기 송신원을 이용한 일본 북동부 만다이 산에서의 시간영역 항공 전자탐사)

  • Mogi, Toru;Kusunoki, Ken'ichirou;Kaieda, Hideshi;Ito, Hisatoshi;Jomori, Akira;Jomori, Nobuhide;Yuuki, Youichi
    • Geophysics and Geophysical Exploration
    • /
    • v.12 no.1
    • /
    • pp.1-7
    • /
    • 2009
  • Airborne electromagnetics (AEM) is a useful tool for investigating volcanic structures because it can survey large and inaccessible areas. Disadvantages include lower accuracy and limited depth of investigation. The Grounded Electrical Source Airborne Transient Electromagnetic(GREATEM)survey system was developed to increase the depth of investigation possible using AEM. The method was tested in a survey at Mount Bandai in north-eastern Japan. Mount Bandai is an andesitic stratovolcano that rises 1819m above sea level. An eruption in July 1888 left a hoof-shaped collapsed wall in its northern crater and avalanche debris at its base. Previous surveys of Mount Bandai allow for comparisons of data on its structure and collapse mechanism as obtained by GREATEM and other geophysical methods. The results show resistive structures in recent volcanic cones and conductive structures in the collapsed-crater area. Conductive areas around the collapsed wall correspond to an alteration zone resulting from hydrothermal activity, supporting the contention that a major cause of the collapse associated with the 1888 eruption was hydrothermal alteration that structurally weakened the interior of the volcanic edifice.