• Title/Summary/Keyword: building-up construction

Search Result 960, Processing Time 0.03 seconds

Development of a Large Capacity Hybrid-Type Linear Motor Damper for the vibration Control of Building Structures (건축 구조물의 진동 제어용 하이브리드형 대용량 리니어 모터 댐퍼의 개발)

  • Jeong, Sang-Seop;Jang, Seok-Myeong;Lee, Seong-Ho;Yun, In-Gi
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.51 no.11
    • /
    • pp.601-611
    • /
    • 2002
  • As resent trends in structural construction have been to build taller and larger structures than any time in the past, they have had high flexibility and low damping that can cause large vibration response under severe environmental loading such as earthquakes, winds, and mechanical excitations. The damper with mass and sqring is one aproach to safeguarding the structure against excessive vibrations. In this paper, a large capacity hybrid-type linear motor damper(LMD) was designed and fabricated for the application to the vibration control of a large building structure model. It has been designed to be able to move the damper mass, 1,500 kg up to ${\pm}250mm$ strokes at the first mode natural frequency of the building structure model, ${\pm}0.51Hz$. Linear motor is consisted of the fixed coil and the movable NdFeB permanent magnets field part. The PM field part composed magnet modules and iron yoke, is the damper mass itself, 1500kg. LMD therefore has a simplified structure and requires a few elements in the driving system, being compared with a rotary motor damper and a hydraulic damper. However, the manufacture of large PM linear actuator is difficult because of the limit of PM size and the attraction and repulsion at the assembly of PM. Therefore, large damper system is manufactured and tested for dynamic characteristics and frequency response.

Effect of Waste Transfer Stations on Collection Efficiency in Seoul (생활폐기물 적환장의 운영에 따른 수거효율성 분석)

  • Yoo, Kee-Young
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.26 no.1
    • /
    • pp.13-19
    • /
    • 2018
  • 25 local districts in Seoul have been running Waste Transfer Stations(WTSs) to secure regional collection bases, to connect between collection systems and waste treatment systems, and to commit various pre-screening of mixed wastes. There were, however, few previous researches to define how much WTSs are beneficial to waste collection system at least in Korea. So this study analyzed costs of waste collection systems with varied haul distances from waste sources(WSs) to WTS or building types of WTSs. Major results showed that the closer WTS is to WS or the cheaper the construction cost of WTS is, the lower the cost of waste collection system is. There was an additional result that WTS system with more than 15 km of total haul distance might be useful in Seoul and encapsulation of WTS in building or underground will make effective total haul distances longer up to 35km.

Application of Data Dictionary to BIM for Small and Medium Project (중소규모 사업용 BIM을 위한 데이터 사전의 활용)

  • Lee, Hwan Woo;Lee, Kyung Sub;Kim, Kwang Yang
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.431-438
    • /
    • 2013
  • The systemization of construction information is required over whole life cycle of facilities to improve productivity of construction industry. BIM(Building Information Modeling) is a technology to manage information based on 3D information model. It has been actively suggested as one of the alternatives. However, it may be currently concentrated on the large project while the small and medium project based on BIM are slightly treated in indifference. In the case of small and medium project, the loss of information has been occurred more seriously than large project. However, it is hard to introduce BIM to the small and medium companies due to the lack of investment resources. This study has been performed to set up information management system based on BIM considering characteristics of small and medium project without excessive investment. In this study, pseudo BIM is defined as BIM for small and medium project. The concept of pseudo BIM has been suggested. The PLIB of ISO and construction information classification system of MOLIT in Korea are used to construct data dictionary for pseudo BIM. A pilot test is performed to verify the effectiveness of pseudo BIM.

Tensile Resistance and Field Application of Hang-type PC Beam (걸이형 PC보의 인장저항성 및 현장적용)

  • Ha, Sang-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.449-457
    • /
    • 2020
  • Due to the improvement of living standards and avoidance of the 3D industry, it is difficult to find young and competent domestic workers at construction sites, and most foreign workers are contributing to the replacement, but the quality is still deteriorating due to lack of skilled workers and aging. Precast method is a method that make members in factory and assembles them on site, which can be expected to improve labor force and quality. This study is intended to provide basic data for the development of hang-type PC beams that can be applied to the determination of the field application of developed PC beams. The U-type connecting material is installed on both ends of the hang-up PC beam, and the role of the U-type connecting material is very important because it is a simple construction method through the U-type connecting material. In addition, the performance of the U-type connecting material will determine the performance of the hang-type PC beam as the final destruction occurs in the hang-type PC beam. The material properties of U-type connecting material were identified through structural experiments, and the end test corresponding to the partial experiment was conducted based on the material test results identified. Finally, the final design value of PC beams was proposed through structural experiments for application to the site.

Comparison of Void Content between Cyldrical Concrete Specimen and Concrete Core Specimen Using ASTM C 642 Test Procedure (ASTM C 642 시험방법을 이용한 구조체 코어공시체와 원주형 공시체의 공극률 비교 평가)

  • Son, Joeng Jin;Kim, Ji-Hyun;Chung, Chul-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.631-640
    • /
    • 2022
  • Recently, construction accidents have occurred due to illegal water addition and insufficient quality control at domestic construction sites. In this study, the void content test method proposed in ASTM C 642 was used to provide a reference guideline for evaluation on the quality control status of cast-in-place structural concrete. For this purpose, simulated structural concrete for coring purpose was prepared in addition to the concrete cylindrical specimens with the same formulation, and the changes in compressive strength, elastic modulus, and void content related to coring were evaluated. According to experimental results, the compressive strength and modulus of elasticity were reduced by coring, which was associated with the generation of microcracks during coring. With respect to void content, the difference in void content between the cylindrical specimen and the cored specimen was up to 1.69%. If this value is used as a correction factor, it is possible to estimate the real void content of the cast-in-place structural concrete. By comparing this with the void content obtained from cylindrical concrete specimens, it is possible to evaluate the quality control status and amount of illegal water addition on the structural concrete.

Evaluation of Forming Performance of Cold Rolled Steel Pipes & Tubes for Building Structure (건축구조용 냉간성형 강관의 가공성능 평가)

  • Im, Sung Woo;Choi, Kwang;Chang, In Hwa
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.1 s.68
    • /
    • pp.33-42
    • /
    • 2004
  • Making use of SN steel in the building structure should be a prerequisite to adopt the design strength of said steel. As a preceding study, the material properties of STKN400B/490B tubes and SPAP235/325 and SPAR295 square pipes manufactured using SN400B/490B plates were evaluated. Compared with the yield and ultimate strengths of SN400B/490B plates, those of STKN400B/490B tubes increase. Nonetheless, the yield and ultimate strengths of STKN400B/490B tubes satisfied the design codes of STKN400B/490B tubes even though the tubes were fabricated via roll bending or press forming. On the other hand, the yield and ultimate strengths at the edges of SPAP235/325 square pipes did not satisfy the design codes based on the values at the sides. The maximum tensile and compressive residual stresses at the SN490B tube were equal to and 40% of the yield strength of the SN490B plate, respectively, In the case of the SPAP325 square pipe, both the maximum tensile and compressive residual stresses were 80% of the yield strength of the SN490B plate. The axial compressive loaded column test results snowed that the buckling strengths were not very different regardless of the mode of fabrication of STKN490B tunes. i.e., through roll bending or press forming. On the other hand, the buckling strength of the SPAP325 square pipe was higher than that of the built-up square pipe.

A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment (국내 협업 설계 환경에서의 IFC기반 정보 교환 프레임워크 구축에 관한 연구)

  • Shin, Joonghwan;Kwon, Soonwook;Lee, Kyuhyup;Choi, Sangduck;Kim, Jinman
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.24-34
    • /
    • 2015
  • As recent multilateral collaboration design system has been advanced, BIM based data exchange is a key factor for successful next generation building project. Even though many studies have been trying to set up a data compatibility system for collaboration, There are still a lot of problem in data exchange between design and engineering phase. Therefore, In this study, we analysis causes of problem for information exchange and suggest a IFC based Information exchange framework for improving BIM based design collaboration environment. In order to find out problems that hinder establishment of advanced open BIM information exchange, proper analysis about transition of process from current and to-be BIM based design collaboration process is important, at first. From analysis of main obstacles to information exchange, this research suggests solution plan using open API and IFC based BIM collaboration supporting system. The suggested open API solution named Integrity feedback system perform a role making up for weak point derived from IFC based data exchange. And main system suggestion about framework for IFC based information exchange reflect technological system support, requirement of function for collaboration including API/BCF plug-in.

Constructability Evaluation of Seismic Mechanical Splice for Slurry Wall Joint Consisting of Steel Tube and Headed Bars (슬러리월의 내진설계를 위한 강재각관과 확대머리 철근으로 구성된 기계적 이음의 시공성 평가)

  • Park, Soon-Jeon;Kim, Dae-Young;Lim, In-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.295-303
    • /
    • 2023
  • South Korea has recently witnessed an increasing number of seismic events, leading to a surge in studies focusing on seismic earth pressures, as well as the attributes of geological layers and ground where foundations are established. Consequently, earthquake-resistant design has become imperative to ensure the safety of subterranean structures. The slurry wall method, due to its superior wall rigidity, excellent water resistance, and minimal noise and vibration, is often employed in constructing high-rise buildings in urban areas. However, given the separation between panels that constitute the wall, slurry walls possess limited resistance to seismic loads in the longitudinal direction. As a solution, several studies have probed into the possibility of interconnecting slurry wall panels to augment their seismic performance. In this research, we developed and evaluated a method for linking slurry wall panels using mechanical joints, including concrete-confined steel pipes and headed bars, through mock-up tests. We also assessed the constructability of the suggested method and compared it with other analogous methods. Any challenges identified during the mock-up test were discussed to guide future research in resolving them. The results of this study aid in enhancing the seismic performance of slurry walls through the development of an interconnected panel method. Further research can build on these findings to address the identified issues and improve the efficacy and reliability of the proposed method.

An Analysis of Vertical Position Accuracy for the Three-Dimensional Spatial Data Object Utilizing the Public Information (공공데이터를 활용한 3차원 공간정보 객체의 수직위치 정확도 분석)

  • Kim, Jeong Taek;Yi, Su Hyun;Kim, Jong Il;Bae, Sang Won
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.3
    • /
    • pp.137-143
    • /
    • 2014
  • Recently, as new paradigm for government operation called government 3.0, government is actively operating policy opening and sharing public data. In addition, the Ministry of Land are operating an open platform integrated map service (the VWorld) which provides a variety of video contents such as the country's national spatial information, traffic information and three-dimensional building for the public. According to W3C Foundation's Open Data Status Report(2013), our country has the evaluated results that the part of the government's policy support and planning is good while the part of the data management is vulnerable. So our country needs the quality improvement for the data management. In addition, a digital aerial photograph image data is required to be up-to-date for the three-dimensional spatial object data. In this paper, we present the method for enhancement of the accuracy of vertical position and for maintainment of up-to-date vertical position. Our methods evaluate the data quality and analyze the cause of error of measurement utilizing the national standard quality assessment method. The result of research shows that the accuracy of vertical position is improved if the height of the building captain is adjusted by the quality assessment values and a three-dimensional model has up-to-date data if reconstruction and extension information of construction register is utilized.

A Study on the Materials and Technique of Lime Plaster Work in Government Constructions in the Late of Joseon Dynasty(17~19c) - Focused on the Lime Plaster Materials in 'Yeonggeon-Uigwe'(Construction Reports) - (조선후기 관영건축공사의 회(灰)미장재와 공법에 관한 연구 - 영건의궤(營建儀軌)의 유회(油灰), 수회(水灰), 양상도회(樑上塗灰)를 중심으로)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.18 no.4
    • /
    • pp.63-79
    • /
    • 2009
  • Since the 1970's, UNESCO and ICOMOS have adopted or emphasized on the principles of historic preservation. One of them is what to require a repair have not to be repaired beyond the limits of the features and techniques to have been born in those days of establishment. On the premise, this paper is to examine the materials and technique of lime plaster work in order for roof ridge, and for bond paste of stones and bricks in government constructions in the late of Joseon dynasty(17~19c). The result of this examination will come up with a basic conformity in the case of repairing the building established in the late of Joseon dynasty. This paper is carried out for the proper repair and restoration of architectural cultural properties. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. The components of old plaster mixtures which agglutinate stones each other were quicklime, perilla oil, and paper fiber. The components of old plaster mixtures which point joint of black bricks consisted of slaked lime, perilla oil, paper fiber, and cereal starch. These components were the same as coat surface of roof ridges. In the case of times, one of the following sand, white clay, sap of boiled elm bark was added to these components for the purpose of high efficiency. These materials and techniques which applied to plaster work of those buildings had developed in the process of making royal tombs. But these materials and techniques were quite different from the present.

  • PDF