• Title/Summary/Keyword: building scope

Search Result 403, Processing Time 0.03 seconds

Analysis of the working environment of male and female engineers in the design office and improvement plan (설계사무소 남성 및 여성기술인력의 업무환경 실태분석 및 개선방안)

  • Yoon, Jung-In;Ko, Chan-Yeong;Jeong, Hyun-Young;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.35-36
    • /
    • 2022
  • Recently, as the characteristics and production methods of the construction industry are changing, and women are actively entering the society, the view of women in the construction industry is also gradually changing. Although the government is currently improving the system to expand women's participation, nevertheless, women's participation in the construction industry is very low compared to other industries. The scope of this study was limited to presenting the actual working environment and improvement plans for male and female engineers in the design office. As a result of the survey on the insufficient part of the work environment, the item 'rest space such as lounge, bathroom, and conference room was narrow' was highly surveyed for men, and 'there was no rest space that required gender discrimination' was highly surveyed for women. As for the improvement measures, both men and women were surveyed highly in the category of 'My place for personal work'. In this study, the scope of the study has a limitation in that it only presents the actual situation and improvement measures for the working environment for male and female engineers in the design office.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

BUILDING INFORMATION MODELING (BIM)-BASED DESIGN OF ENERGY EFFICIENT BUILDINGS

  • Cho, Chung-Suk;Chen, Don;Woo, Sungkwon
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • With the increased awareness of energy consumption as well as the environmental impact of building operations, architects, designers and planners are required to place more consideration on sustainability and energy performance of the building. To ensure most of those considerations are reflected in the building performance, critical design decisions should be made by key stakeholders early during the design development stage. The application of BIM during building energy simulations has profoundly improved the energy analysis process and thus this approach has gained momentum. However, despite rapid advances in BIM-based processes, the question still remains how ordinary building stakeholders can perform energy performance analysis, which has previously been conducted predominantly by professionals, to maximize energy efficient building performance. To address this issue, we identified two leading building performance analysis software programs, Energy Plus and IES (IES ), and compared their effectiveness and suitability as BIM-based energy simulation tools. To facilitate this study, we examined a case study on Building Performance Model (BPM) of a single story building with one door, multiple windows on each wall, a slab and a roof. We focused particularly on building energy performance by differing building orientation and window sizes and compared how effectively these two software programs analyzed the performance. We also looked at typical decision-making processes implementing building energy simulation program during the early design stages in the U.S. Finally, conclusions were drawn as to how to conduct BIM-based building energy performance evaluations more efficiently. Suggestions for further avenues of research are also made.

A Study on the Deterioration Patterns of Building Components in the Rental Apartment Housing (임대공동주택 구성재의 열화도 패턴에 관한 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.65-72
    • /
    • 2006
  • Most of buildings have been deteriorated with time-elapse by reflection of the building location, material, environmental circumstances and so on. The performance would go down and be demolished if anything could not be done after constructed. The maintenance should be required to preserve a decent living condition or improve a inferior condition by various plans and practices. The maintenance plan needs various data such as a repair scope, a repair time, a forecasted cost, a plan of management and so forth. Among the above required data for planning the maintenance, the deterioration characteristics of the building components would be first analyzed. The deterioration pattern would be a key role to affect and make a maintenance plan. In this paper, it aimed at classifying the deterioration patterns of building components. A deterioration pattern would be analyzed between the cumulative repair cost and time-elapse and modeled with these relations. A deterioration patterns are classified into 4 types-a accelerated type, a straight type, a temporary type and a slowly type. As a result of this research, a accelerated type includes window, window frame, general paintings, general water proofing in building components. A straight type includes the lacquer paintings, furnishings in building components and water supply pipe, boiler, sanitaries in mechanical facilities and lighting in electric facilities. Based on these research results, further study should be conducted to include any other components and an estimating model.

Building Integrated Vegetation Systems into the New Sainsbury's Building Based on BIM

  • Lee, Dong-Kyu
    • Journal of KIBIM
    • /
    • v.4 no.2
    • /
    • pp.25-32
    • /
    • 2014
  • Today, there is a growing need of environment-friendly buildings, so-called 'green', facilities, and energy saving buildings to decrease environmental pollutants released into cities by construction activities. Green-Building Information Modeling (Green-BIM) is a purpose-built solution which supports to forecast energy consumption of 3-D model of a building by augmenting its primary 3-D measurements (width, height and depth) with many more dimensions (e.g. time, costs, social impacts and environmental consequences) throughout a series of sequential phases in the lifecycle of a building. The current study was carried out in order to integrate vegetation systems (particularly green roof and green wall systems) and investigate thermal performance of the new Sainsbury's building which will be built on Melton road, Leicester, United Kingdom. Within this scope, a 3-D building model of the news Sainsbury's building was first developed in $Autodesk^{(R)}$ $Revit^{(R)}$ and this model was then simulated in $Autodesk^{(R)}$ $Ecotect^{(R)}$once weather data of the construction site was obtained from $Autodesk^{(R)}$ Green Building $Studio^{(R)}$. This study primarily analyzed data from (1) solar radiation, (2) heat gains and losses, and (3) heating and cooling loads simulation to evaluate thermal performance of the building integrated with vegetation system or conventionally available envelops. The results showed that building integrated vegetation system can potentially reduce internal solar gains on the building rooftops by creating a 'bioshade'. Heat gains and losses through roofs and walls were markedly diminished by offering greater insulation on the building. Annual energy loads for heating and cooling were significantly reduced by vegetation more significantly through the green roof system in comparison to green wall system.

A Study on the Multi-purpose Uses of Special Classrooms and Supporting Facilities At medium and Small Size Elementary schools (중소규모 초등학교에서 특별교실 및 지원시설의 다목적화에 관한 연구)

  • Lee, Ho-Chin;Park, Ik-Sun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.2 no.1
    • /
    • pp.49-67
    • /
    • 2002
  • The purpose of this study is to be able to accept various educational processes with a few classrooms by multi-purpose uses special classrooms and supporting facilities of medium and small sized elementary school. For this purpose, I had divided into three parts by analyzing correlation of each classrooms according to the types of lessons, necessary equipment, building equipment environment, the need of users. The types of lessons and necessary facilities make the scope of each classrooms throughout Correspondence Analysis, and the need of users that is the recognized similarity between each rooms by teachers, make the scope by using Multi-Dimensional Scaling(MDS). Establish the final scope by combining and analyzing the already classified rooms by each factor. Lastly, calculate the numbers of rooms by applying the usage rate of each classified classroom and examine the standard of planning and the example of composition for the multi-purpose uses of combined room.

  • PDF

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

Modelling the Estimation Process of Greenhouse Gas Emission in the Construction of Buildings

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.266-274
    • /
    • 2012
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. To meet the government's greenhouse gas reduction targets, the construction sector has until 2020 to cut its emissions by 7.1%. Unlike other high-tech industrial sectors, the construction sector has a fairly limited scope for technological improvements, which hampers its capacity to achieve the reduction target. To reduce emissions, it is necessary to establish an energy and emissions strategy at the project planning stage, and energy use and the resulting emissions must be estimated. This research aims to establish an estimation methodology for greenhouse gas emissions at the planning stage of construction projects. To estimate the project-related emissions, this research indentified the relationship among the types of emissions in a cross-sectional matrix form, and then provided a set of calculation methods for total project related emissions.

A Basic Study on Influential Factors of Building Damages According to Hurricane by Using Correlation Analysis (상관분석을 통한 태풍에 따른 건축물 피해액의 영향인자 도출)

  • Kim, Boo-Young;Yang, Seongpil;Kim, Sangho;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.164-165
    • /
    • 2014
  • In the case of U.S, various damage prediction models of buildings from natural disasters have been used widely in many organizations such as insurance companies and governments. In South Korea, although studies regarding damage prediction model of hurricane have been conducted, the scope has been only limited to consider the property of hurricane. However, it is necessary to consider various factors such as socio-economic, physical, geographical, and built environmental factors to predict the damages. Therefore, as a basic study on a damage prediction model development of buildings, this study is to analyze the correlation between various factors related to hurricane. The findings of study can be utilized to develop for predicting the damage of hurricane on buildings.

  • PDF

Comparative Analysis on the Defect Evaluation System in Apartment Buildings (공동주택 하자감정 평가체계의 비교 분석)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Seo, Deok-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.111-112
    • /
    • 2012
  • The purpose of this study is to evaluate a defect in apartment buildings as review a safety investigation and consult a defect. As a result to compare a safety investigation to consult a defect, they are almost similar in spite of the purpose and the scope of evaluation are different. Therefore, it needs to establish a special and systemic system, and follow an organized effort about raising a consultant and improving an ability.

  • PDF