• 제목/요약/키워드: building owner

Search Result 181, Processing Time 0.093 seconds

Guideline of Building Information Modeling(BIM) Service Application Level using Service Level Agreement(SLA) in the Procurement Phase (발주단계에서 SLA를 활용한 BIM 서비스 적용 수준에 관한 연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.83-90
    • /
    • 2017
  • Recently, BIM has been actively adopted in construction projects and industries, and also integrated with Information and Communications Technology(ICT) such as cloud computing technology, sensor technology, 3D scanning and printing technology etc. However, it is very difficult to efficiently utilize BIM services, technologies and collaborate with each other because of differences of usage and requirements of technologies. Every participant in the same construction project has their own needs, requirements and details of the model in each phase. In order to enhance utilization BIM model, BIM services and technologies required in their project have to be clearly defined in the initial stage of the project. In order to support the owner to define the BIM level, BIM service level and application technologies are identified and guidelines how to define the level and technologies for their project purpose are suggested in this study.

A study on reliability analysis model of the repair and replacement cycle of a building which utilizes Monte Carlo Simulation (몬테카를로 시뮬레이션을 활용한 건축물 수선교체주기 신뢰성 분석 모델에 관한 연구)

  • Kim, Jong-Rok;Jung, Young-Han;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.41-50
    • /
    • 2010
  • This study presented a model that can enable a reliability analysis for the repair and replacement cycle of a building by using background repair and replacement data and expert opinion as foundation data and applying Monte Carlo Simulation. The presented model offers the time of the repair and replacement of building elements for the period of a year, and supports the prediction of repair and replacement and expenses demand in advance while planning the maintenance of a building. In addition, the model will significantly reduce the risks to the building owner with regard to maintenance decisions. In addition, when a person in charge of the maintenance of large-scale building assets is having difficulties making decisions regarding the repair and replacement of existing building elements due to a lack of background data to support a long-term policy on the repair and replacement requirements, an engineering solution that can ensure the adequacy of this is provided. In summary, it can be largely divided into three study results. First, a method of estimating the repair and replacement cycle that can deal with the development of a construction system was developed. Second, a probabilistic methodology that can quantify the risk of the repair and replacement cycle was proposed. Third, the proposed model can be used as a means of supporting designer and constructor in making decisions for the life cycle plan of a building during a construction project.

Identification of Business Process in the Closure Phase of Construction Programs (건설프로그램 종결단계의 업무프로세스 도출)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Cha, Yongwoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.70-78
    • /
    • 2020
  • Construction program management requires more systematic management than traditional management methods due to the complexity of the project and various stakeholders. In particular, the systematization of closure phase of the process is in urgent need as there is a difference between the owner's expectations and the contractor's deliverables, resulting in delayed handovers, conflicts, frictions, and increased legal disputes. This study identified the process and activities of closure phase through domestic and international literature and case studies for the successful closure of the construction program. Further, the proposed processes and activities were verified through expert verification for appropriateness and the possibility of application to the site. By utilizing the processes and activities proposed in this study, the project aims to overcome the limits of closure phase and improve the satisfaction of the owner, as well as to enhance the global competitiveness of domestic construction companies.

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

Lease management in the wireless industry through analysis of factors influencing cell site leases (이동통신회사의 임차료에 영향을 미치는 요인 분석을 통한 임차비용 관리방안 연구)

  • Lee, Jangho;Kwak, Choonjong
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.143-150
    • /
    • 2013
  • A cell site lease is a legal agreement by which the owner of a building or a piece of land allows a wireless carrier to use part of it for a cell tower for a period of time in return for money. Wireless carriers spend significant money for cell site leases. This paper tries to find factors affecting cell site leases and management solutions to save lease costs. In other words, this research identifies any factor influencing cell site leases among age, gender, and geographical area in the first problem and determines management priorities using an importance-satisfaction model in the second problem. This paper can provide wireless carriers with effective decision making tools and a basis for negotiation of cell site leases, as they do not have enough bases for negotiation.

The Study on Indoor Localization for Robots following Human using Vision Applications (비전을 활용한 사람을 따라다니는 로봇의 실내측위에 관한 연구)

  • Jun, Bong-Gi
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.6
    • /
    • pp.1370-1374
    • /
    • 2013
  • The suitcase can follow its owner all on its own via the Bluetooth connectivity in your phone. A robotic vacuum cleaner than can understand voice commands and even follow homeowner. Robots are used in a variety of applications such as a robot wheelchair. In this paper, I focus the problem of automatic return to the base in the process of developing the moving robot for loading things. In this paper, I propose the indoor localization method which is able to determine the position of the robot in the building by using image processing techniques.

The Development of Real-Time Wireless Remote Corrosion Monitoring System Using TRS(II) (TRS를 이용한 실시간 무선 원격 부식감시시스템 개발(II))

  • Bae, Jeong-Hyo;Kim, Dae-Kyeong;Ha, Tae-Hyun;Lee, Hyun-Goo;Choi, Sang-Bong;Jeong, Seong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 1999.11c
    • /
    • pp.618-620
    • /
    • 1999
  • The owner of metallic structures has a burden of responsibility for the protection of corrosion and the prevention against big accident such as gas explosion or collapse of bridge and building and so on. So, he has been spent the money and the time for corrosion monitoring and analysis of measuring data. Therefore, KERI(Korea Electrotechnology Research Institute) has developed the real-time wireless remote corrosion monitoring system using by TRS(Trunked Radio System). The results of development for corrosion monitoring system are described briefly. Especially, the interfacing technology between the server and rectifier introduced in this paper.

  • PDF

A Study on the Trial Results and Performance Trend of Diesel Main Engine (디젤 주기관의 시운전 결과 및 성능 변화 추이에 관한 연구)

  • Cho, Kwon-Hae;Lee, Dong-Hoon;Son, Min-Su
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.73-74
    • /
    • 2005
  • Shipping company and operators have to manage well to keep shipping schedules without problems in main engine. Specially operators have to operate main engine within the limit of operation point, and adjust related parameters to be operated safely and continuously. Also operators have ability to analyze fouling condition of hull through comparing data gotten from P-V curve and performance results of new building ships in trial with service ships. In this study, not only compared main engine performance results in shop trial and sea trial, but also investigated performance trend in accordance with the time elapsed for the service ship's diesel engine. They were confirmed as follows. First, shop trial load is higher than sea trial load but ship's speed is satisfied with owner's contract speed. Second as time goes by, load of service ship increases steadily and other parameters related with main engine shows variable change depend on main engine load increasing.

  • PDF

A Study on Fire Profection and Egress Countermeasure of the High Buildings in the Large City (대도시 고층건물의 방재 및 피난대책에 관한 연구)

  • 김동준
    • Journal of the Korean Society of Safety
    • /
    • v.5 no.1
    • /
    • pp.77-81
    • /
    • 1990
  • In the event of fire, the tendency of over­buildings and high­building resulted from the concentration in population in cities causes great losses of human lives and property. Man is able to prevent fire itself from taking place on his own efforts. One of fire preventions at high­buildings is to Survey the environmental situations around the constructions from the beginning, and when the construction is going on, it is indispensable to install appropriate water­proof dampers with all sorts of equipments. Hence, lots of the owner's investment of the buildings in fire prevention facilities is necessary and, so is constructions in agreement with every regulations.

  • PDF

A design of the Artwork for the Atrium (아트리움을 위한 조형물 디자인)

  • Lee, Ran-Pyo
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2005.05a
    • /
    • pp.263-266
    • /
    • 2005
  • This work aims at the design of the artwork for the atrium of a furniture department store. In complying with the request of the building owner I have established the basic concept, 'silence in movement - movement in silence', to design a artwork, which not only can make the various atmospheres in the store to the unique one, but also arrange an emotional stability for the visitors. Most exhibited furnitures are those that demand particular interests from the visitors, and the exhibition scale is enormous. So it is difficult to sustain the continuous inspiration and the emotional stability, and also it is hard to make the store have the consequent image. This problem can be resolved through the installation of the artwork that can evoke the visitor to the abundant sensitive receivability. The materials, which are used tp express the basic concept, are water, concrete, light and aluminium that represent a unified harmony in a contrast each other.

  • PDF