기획단계 발주자 요구사항 기반 Requiremental Function Method VE 적용 (Requiremental Function Method based Owner's Requirement in VE Process Application at Planning Stage)

  • 박인지;손명진;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.123-125
    • /
    • 2012
  • It is the important accurately to identify the needs of our customers in order to success the project. Requirements in the early stages of business is very abstract or not quantitative, and that will cause problems such as cost or schedule changes. Particularly many people are likely to prefer the early stages of the project, because the time of applying VE related cost savings is important. Owner's requirement analysis for project success in the VE process does not easy, and specific ongoing management of the requirement is difficult. Therefore, the analysis and the application of owner's requirements is limited in project process. The purpose of this study is proposed to the RFM technique to supplement the functional analysis on the basis owner's requirements analysis in planning a building project.

  • PDF

Method to Use the Augmented Reality for Construction Planning and Management

  • Nam, Keong-Woo;Kang, Chulung;Jang, Myunghoun
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1067-1074
    • /
    • 2022
  • An architect creates his/her design to meet owner's requirements. Floor plans, perspective drawings, and scale models are used in order for the owner to choose the design. The tools are a little helpful for communication between the architect and the owner in case the owner does not know architecture. The scale models are good, but it is hard to make scale models while design is in progress. 3D CAD is a good tool for communication, but it is time-consuming and requires high-performance computer hardware. Augmented reality is able to show 3D virtual models that are updated by the architect with smart devices such as a smart phone and a tablet PC. The owner frequently reviews the updated design anytime anywhere. This study proposes a method to use augmented reality for architectural design and construction management. The method supports the communication between the owner, the architect and the contractor to review updated designs, and to complete the building project. 3D models expressed in augmented reality are created using SketchUp with 2D drawings for building construction. An Android application implementing augmented reality is developed by Qualcomm Vuforia and Unity on smart devices. Drawings as markers and 3D models are connected in Unity. And functions that temporarily hide unnecessary parts can be implemented in C# programming language. If an owner, an architect, or a contractor looks at a smart phone on a 2D drawing, he/she can identify building elements such as 3D buildings or columns on a screen. This can help communication between them.

  • PDF

건축주-CM 방식의 소규모 건축공사에서 공정관리 성공 요인 (Success Factors of Scheduling in Small-Scale Building Construction with Owner-CM Delivery Method)

  • 김선규;김준영
    • 한국건설관리학회논문집
    • /
    • 제20권1호
    • /
    • pp.96-104
    • /
    • 2019
  • 최근 대도시 주변 중심으로 새로운 택지지구를 개발하거나, 오래전에 개발된 주거지를 새로운 택지로 재개발하는 사업들이 활발하게 진행되고 있다. 이러한 택지지구의 대지에는 건축주가 직접 건물을 지을 수 있는데, 건축주가 직접 집을 짓는 방식을 건축주 직영공사라고 한다. 건축주 직영공사에서 건축주가 건설사업관리(Construction Management, CM) 능력을 보유하고 있다면, 직영공사를 CM방식으로 수행할 수 있는데, 이러한 공사수행방식을 건축주(Owner)-CM방식이라 한다. 그러나 국내에서 소규모 건축공사의 수행방식이 건축주-CM방식인 경우는 매우 드물다. 이는 건축주가 CM에 대한 지식과 경험이 부족하기 때문일 것이다. 본 연구에서는 수도권 인근에 개발된 단독주택단지내에 거의 동일한 시기에 직영공사로 지어진 유사한 규모의 상가주택들을 대상으로 공정관리 실제 사례를 조사하였다. 그리고 본 연구는 건축주-CM방식으로 수행된 소규모 건축공사의 공정관리 사례로부터 소규모 건축공사에서의 공정관리 성공요인들을 도출하는 것을 목적으로 하고 있다. 이러한 공정관리 성공요인들은 향후 자신의 집을 직접 짓고자 하는 건축주들에게 의미 있는 참고자료로 활용될 수 있을 것이다.

Bayesian Theorem-based Prediction of Success in Building Commissioning

  • Park, Borinara
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.523-526
    • /
    • 2015
  • In recent years, building commissioning has often been part of a standard delivery practice in construction, particularly in the high-performance green building market, to ensure the building is designed and constructed per owner's requirements. Commissioning, therefore, intends to provide quality assurance that buildings perform as intended by the design and often helps achieve energy savings. Commissioning, however, is not as widely adopted as its potential benefits are perceived. Owners are still skeptical of the cost-effectiveness claims by energy management and commissioning professionals. One of the issues in the current commissioning practice is that not every project is guaranteed to benefit from the commissioning services. This, coupled with its added cost, the commissioning service is not acquired with great acceptance and confidence by building owners. To overcome this issue, this paper presents a unique methodology to enhance owner's predicting capability of the degree of success of commissioning service using the Bayesian theorem. The paper analyzes a situation where a future building owner wants to use a pre-commissioning in an attempt to refine the success rate of the future commissioned building performance. The author proposes the Bayesian theorem based framework to improve the current commissioning practice where building owners are not given accurate information how much successful their projects are going to be in terms of energy savings from the commissioning service. What should be provided to the building owners who consider their buildings to be commissioned is that they need some indicators how likely their projects benefit from the commissioning process. Based on this, the owners can make better informed decisions whether or not they acquire a commissioning service.

  • PDF

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

설계변경에 의한 공사비의 증감에 관한 연구 (The Research about Increase and Decrease of the Construction Cost by the Alteration of Design)

  • 임칠순;이규철
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

발주자 참여 확대를 위한 BIM 적용요소에 관한 연구 (Application of BIM Elements for Owner's Decision - Making Support)

  • 이경하;박재현;조성;조용;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

건물 리모델링 경제성 평가 요소에 관한 연구 (A Study on Evaluation Element of Economic Efficiency in Building Remodeling)

  • 차준석
    • 한국실내디자인학회논문집
    • /
    • 제32호
    • /
    • pp.113-120
    • /
    • 2002
  • In greeting the 21st century, the Importance of Building Remodeling has increased more than ever. And it has become necessary to consider Economic efficiency in Building Remodeling. This Study is intended to investigate needing of Remodeling sections for the Building Owner and Remodeling Constructor. And it has become necessary to consider Economic Efficiency in Building Remodeling for Needer and Supplier. In this context, this study is focused on the "Evaluation element of Economic Efficiency in Building Remodeling". The Survey of office Building Constructor and Building owner shows that importance of Remodeling. Through this study, the flow of construction information is elevated reaching the level in advanced nation.

농촌 한옥 표준설계도 연구 (A Study on Standard Hanok Design for Rural)

  • 김재웅
    • 한국농촌건축학회논문집
    • /
    • 제18권1호
    • /
    • pp.19-28
    • /
    • 2016
  • This research aimed to suggest a standard design that reflects Hanok design tendency, and present a selective design that can fulfill a building owner's intention beyond the simple function of building permit or report. In addition, this research attempted to become a standard by establishing a criterion in calculating the measurements of section design or primary framework members, in order to be a guideline for designing Hanok in different sizes and forms. The results are as follows. The building area of Hanok standard design was set to be below $85m^2$, with a straight type of $83.16m^2$ and an L-shape of $84.24m^2$. By dividing the plane into a straight type and L-shape, two straight types were suggested: 'general type' and 'large living room type.' The upper floor space, along with the main room and small room, was proposed as an option to be changed into a room where an underfloor heating is installed depending on the building owner's intention. In addition, a criterion for side design and calculation of framework measurements was suggested and applied, while a five-girder design without high pillars was suggested for material-assembling structure. Two types of pillars-circumference and square cylinder-were proposed for the building owner to choose from, and a pointed beam house and ikgong(orthogonally-projected bracket) house were suggested for pojak bracket structure so either of them could be chosen according to the building owner's taste and economic condition. Finally, the sectional size of main materials were divided according to the form of pojak bracket structure to be proposed.