• Title/Summary/Keyword: building modeling

Search Result 1,992, Processing Time 0.031 seconds

Development of a Visual-Basic based Two-Dimensional Finite-Difference Density-Coupled Flow Numerical Code for Simulating Saltwater Intrusion (해수침투 모의를 위한 Visual Basic 기반 2차원 유한차분 밀도 결합 흐름 모델 개발)

  • Chang, Sun Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.973-980
    • /
    • 2017
  • The purpose of this study is to develop VDFT (Visual Basic based Density-coupled Flow and Transport), a numerical modeling code used to simulate density coupled flow equations used to simulate seawater intrusion in a two dimensional finite difference method. The VDFT code has the advantage of being intuitive and simple to use and has the advantage of utilizing the EXCEL Visual Basic platform, which is widely used for general business purposes. Generally, code developed for numerical simulation can be verified through representative example models called benchmark problem. In this study, we verified the VDFT code using benchmark problem called Henry Problem and Modified Henry Problem as well as two laboratory test data. The results of this study are analyzed the importance of each benchmark problems, validated VDFT code compared to those problems. In conclusion, the possibility of using VDFT code is diagnosed and the direction of future research is suggested.

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

Development of an Application to Generate 2D Drawings in Automation using Open BIM Technologies (개방형BIM기반 2D도면 자동 생성 프로그램 개발에 관한 연구)

  • Kim, Inhan;Lee, Minjae;Choi, Jungsik;Kim, Gutaek
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.417-425
    • /
    • 2016
  • Especially for resolving BIM data compatibility issue, as one of recently raised BIM technology issues, has also been improved by using open BIM, representatively using IFC (Industry Foundation Classes) format. As shown in many case studies, usefulness of BIM technology is increasing day by day, and the IFC-based open BIM technology is essential in recent AEC projects where the productive collaboration is of importance. One of current problems in actual projects is that there is a conflict between conventional ways and newly developed BIM ways. Using both conventional and new technologies leads construction workers to having more work loads, consequently the efficiency and productivity of on-site workers have been decreased. Thus, it is strongly necessary to facilitate 3D BIM models to extract and generate 2D precision drawings in automation, especially using open BIM technologies. Some native BIM authoring tools have limitations in there automatic generation of 2D drawings, and there is no standardized mechanism to generate 2D drawings from heterogeneous applications. For this reason, this paper aims to develop an automated stand-alone program to generate 2D drawings in automation using IFC file, totally independent from various BIM authoring tools. By using the application described in this paper, any type of general drawings such as plan, section and elevation can be extracted without additional efforts. The development approach described in this paper, based on the open BIM technologies, has a strong impact to the current process especially in the perspective of enhancing productivity when we need to find out a trade-off in-between conventional and new approaches.

Evaluation of International BIM Standard Contracts to establish BIM Copyrights and Operational Protocols in Korea (국제 BIM 표준계약서 분석을 통한 국내 BIM 저작권 보호 및 운용 체계 수립에 관한 연구)

  • Koo, Bonsang;Shin, Byungjin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.24-30
    • /
    • 2016
  • Building Information Modeling, and its associated work practices, requires project participants to share not only 3D geometric data, but also information in the model that may be considered proprietary and even trade secrets. Thus protection of intellectual property, or BIM copyrights, must be in place for participants to share proprietary information among project stakeholders. Currently Korea does not have adequate copyright laws or mechanisms to provide such protection. This research examined three BIM copyright legal documents, namely U.S.' ConsensusDOCS 301, AIA Document E203/G202, and U.K.'s CIC BIM Protocol to determine how copyright protection is realized, and to formulate appropriate stipulations within the Korean construction context. The resultant requirements include stipulating ownership at to the BIM originator, adopting a license-sublicense scheme, employing a federated model, and use of a formal model delivey table to allocate responsibilities. Given Korea's adoption stage, liability should be minimal, and license revocation should be allowed if payments are not met. The three BIM legal documents focus on practical measures that allow participants to customize requirements for individual projects, and such conventions should be emulated in Korea.

A Node Scheduling Control Scheme with Time Delay Requirement in Wireless Sensor Actuator Networks (무선 센서 엑츄에이터 네트워크에서의 시간지연을 고려한 노드 스케줄링 제어 기법)

  • Byun, Heejung
    • Journal of Internet Computing and Services
    • /
    • v.17 no.5
    • /
    • pp.17-23
    • /
    • 2016
  • Wireless sensor-actuator networks (WSANs) enhance the existing wireless sensor networks (WSNs) by equipping sensor nodes with an actuator. The actuators work with the sensor nodes and perform application-specific operations. The WSAN systems have several applications such as disaster relief, intelligent building, military surveillance, health monitoring, and infrastructure security. These applications require capability of reliable data transfer to act responsively and accurately. Biologically inspired modeling techniques have received considerable attention for achieving robustness, scalability, and adaptability, while retaining individual simplicity. In this paper, an epidemic-inspired algorithm for data dissemination with delay constraints while minimizing energy consumption in WSAN is proposed. The steady states and system stability are analyzed using control theory. Also, simulation results indicate that the proposed scheme provides desirable dissemination delay and energy saving.

Study Improvement of the Evacuation Performance in a Double-Skin Structure (이중외피 구조 건축물의 피난성능 개선에 관한 연구)

  • Gu, Seon-Hwan;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.31 no.1
    • /
    • pp.98-107
    • /
    • 2017
  • This study examined an effective way of measuring the evacuation performance in buildings, which are applied to a double skin facade through an evaluation of the escape safety. Buildings with a double skin facade appeared to have a faster combustion expansion speed for the upper floor if a fire occurs. Moreover, a double skin facade is more difficult to escape safely than a general building construction because of the limited design standards. Accordingly, this study suggested virtual modeling including single emergency stairs and alarm systems considering the risk in each structure of buildings. These results showed that box-type double skin, corridor access type, shaft-box type, and multistory facade systems showed a 26.4%, 29.1%, 23.4%, and 26.3% increase in evacuation performance, respectively, as well as securing the safety of occupants.

A Study on the Development of a Database for a Health Care System - Focusing on Health Care Management for Hypertensive Patients and Middle-aged Women - (보건소 건강증진사업을 위한 데이터베이스 시스템 구축 - 고혈압과 갱년기 여성건강관리를 중심으로 -)

  • Lee, Hae-Ja;Kim, Chun-Mi;Choi, Jeong-Myung
    • Research in Community and Public Health Nursing
    • /
    • v.15 no.3
    • /
    • pp.365-375
    • /
    • 2004
  • Purpose: This study intends to make a database for hypertensive patients and middle-aged women who are visiting the Yeojoo County Health Center. While building up the database, the study reviewed the current assessment tools used in the health center, developed appropriate health care programs, and designed a computerized health care system. Method: The modeling of a database for the system was constructed by MS-Access for DBMS (Database Management System) and Visual Basic. The system is to be used only in the health center by being designed as a client server method, making it possible for many public employees to be interconnected, and enables them to retrieve and search data from the database simultaneously. Results: The health management system systematically follows nursing processes including assessment, diagnosis, intervention and evaluation. Diagnosis. once it is done according to the self determined criteria, saves time and provides appropriate health information for the members. Also, the health education program was developed to follow up on the health status of the members on a continuous basis. Conclusion: Based on these results, it is required to evaluate health care programs provided for the members by using the database system and to develop more practical health care programs. It is also necessary to connect the system to other databases. which contain information about members.

  • PDF

FEM Numerical Formulation for Debris Flow (토석류 유동해석을 위한 유한요소 수식화)

  • Shin, Hosung
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.10
    • /
    • pp.55-65
    • /
    • 2014
  • Recent researches on debris flow is focused on understanding its movement mechanism and building a numerical simulator to predict its behavior. However, previous simulators emulating fluid-like debris flow have limitations in numerical stability, geometric modeling and application of various boundary conditions. In this study, depth integration is applied to continuity equation and force equilibrium for debris flow. Thickness of sediment, and average velocities in x and y flow direction are chosen for main variables in the analysis, which improve numerical stability in the area with zero thickness. Petrov-Galerkin formulation uses a discontinuous test function of the weighted matrix from DG scheme. Presented mechanical constitutive model combines fluid and granular behaviors for debris flow. Effects on slope angle, inducing debris height, and bottom friction resistance are investigated for a simple slope. Numerical results also show the effect of embankment at the bottom of the slope. Developed numerical simulator can assess various risk factors for the expected area of debris flow, and facilitate embankment design in order to minimize damage.

A Study on Prevention of Construction Opening Fall Accidents Introducing Image Processing (이미지 프로세싱을 활용한 개구부 추락 사고예방에 관한 연구)

  • Hong, Sung-Moon;Kim, Buyng-Chun;Kwon, Tae-Whan;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.39-46
    • /
    • 2016
  • While institutional matters such as improvement on Basic Guidelines for Construction Safety are greatly concerned to reduce falling accidents at construction sites, there are short of studies on how to practically predict accident signs at construction sites and to preemptively prevent them. As one of existing accident prevention methods, it was attempted to build the early warning system based on standardized accident scenarios to control the situations. However, the investment cost was too high depending on the site situation, and it did not help construction workers directly since it was developed to mainly provide support operational work support to safety managers. In the long run, it would be possible to develop the augmented reality based accident prevention method from the worker perspective by extracting product information from BIM, visually rendering it along with site installation materials term and comparing it with the site situation. However, to make this method effective, the BIM model should be implemented first and the technology that can promptly process site situations should be introduced. Accordingly, it is necessary to identify risk signs through lightweight image processing to promptly respond only with currently available resources. In this study, it was intended to propose the system concept that identified potential risk factors of falling accidents by histogram equalization, which was known as the fastest image processing method presently, used visual words, which could enhance model classification by wording image records, to determine the risk factors and notified them to the work manager.

Developing an Estimation Model for Safety Rating of Road Bridges Using Rule-based Classification Method (규칙 기반 분류 기법을 활용한 도로교량 안전등급 추정 모델 개발)

  • Chung, Sehwan;Lim, Soram;Chi, Seokho
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.29-38
    • /
    • 2016
  • Road bridges are deteriorating gradually, and it is forecasted that the number of road bridges aging over 30 years will increase by more than 3 times of the current number. To maintain road bridges in a safe condition, current safety conditions of the bridges must be estimated for repair or reinforcement. However, budget and professional manpower required to perform in-depth inspections of road bridges are limited. This study proposes an estimation model for safety rating of road bridges by analyzing the data from Facility Management System (FMS) and Yearbook of Road Bridges and Tunnel. These data include basic specifications, year of completion, traffic, safety rating, and others. The distribution of safety rating was imbalanced, indicating 91% of road bridges have safety ratings of A or B. To improve classification performance, five safety ratings were integrated into two classes of G (good, A and B) and P (poor ratings under C). This rearrangement was set because facilities with ratings under C are required to be repaired or reinforced to recover their original functionality. 70% of the original data were used as training data, while the other 30% were used for validation. Data of class P in the training data were oversampled by 3 times, and Repeated Incremental Pruning to Produce Error Reduction (RIPPER) algorithm was used to develop the estimation model. The results of estimation model showed overall accuracy of 84.8%, true positive rate of 67.3%, and 29 classification rule. Year of completion was identified as the most critical factor on affecting lower safety ratings of bridges.