• Title/Summary/Keyword: building management act

Search Result 174, Processing Time 0.023 seconds

A Study on the Factors Affecting Small-scale Construction Site Safety and Health Compliance (소규모 건설현장 안전보건규제 준수의지 요인 연구)

  • Lee, Byung-Kwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.2
    • /
    • pp.21-35
    • /
    • 2018
  • The purpose of this study is to reduce the accident rate by introducing a safety system for small construction sites belonging to local governments. In the case of a small construction site, permission is granted through the building permission department and the construction management of the building safety management of 1,000 square meters of floor area less than 3 stories is not properly performed in the Enforcement Decree of the Building Act of Korea. In the current state of industrial accidents in 2016, 81.8% of all accident victims are found to be vulnerable to accident such as those occurring at work places with less than 50 employees. Considering the fact that the construction work with less than 5 billion KRW of the construction cost in Korea generates the most deaths, it is time to introduce the safety and health system of local governments.

Analysis on Unsafe Act of Foreign Construction Laborers (외국인 건설근로자의 불안전한 행동에 관한 분석)

  • Shin, Dae-Woong;Yang, Gi-Nam;Han, In-Hye;Jung, Gyeong-Hwan;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.36-37
    • /
    • 2014
  • According to increase of foreign laborers in domestic, their safety accident is continuously increasing. The purpose of this paper is to draw improvement priority from factors of unsafe act of foreign laborers in domestic. Assessment on each data was performed by Importance-Performance Analysis(IPA) based on safety accident statistics of KOSHA. The result showed that there was required urgent improvement of five factors. The outcome of this study can be utilized in construction safety training and management.

  • PDF

An Approach to the Graph-based Representation and Analysis of Building Circulation using BIM - MRP Graph Structure as an Extension of UCN - (BIM과 그래프를 기반으로 한 건물 동선의 표현과 분석 접근방법 - UCN의 확장형인 MRP 그래프의 제안 -)

  • Kim, Jisoo;Lee, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.3-11
    • /
    • 2015
  • This paper aims to review and discuss a graph-based approach for the representation and analysis of building circulation using BIM models. To propose this approach, the authors survey diverse researches and developments which are related to building circulation issues such as circulation requirements in Korea Building Act, spatial network analysis, as well as BIM applications. As the basis of this paper, UCN (Universal Circulation Network) is the main reference of the research, and the major goal of this paper is to extend the coverage of UCN with additional features we examined in the survey. In this paper we restructured two major perspectives on top of UCN: 1) finding major factors of graph-based circulation analysis based on UCN and 2) restructuring the UCN approach and others for adjusting to Korean Building Act. As a result of the further studies in this paper, two major additions have demonstrated in the article: 1) the most remote point-based circulation representation, and 2) virtual space-based circulation analysis.

Institutional Improvement of Construction-Related Laws for Practical Application of 3D Printing (3D 프린팅 실무 적용을 위한 건설 관련법 제도적 개선 방향)

  • Lee, Sung-Min;Park, Sang-Hoon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.19 no.4
    • /
    • pp.85-94
    • /
    • 2019
  • Then 3D printing is used practically at construction sites, there is a serious lack of studies on the conflict with construction-related laws and expected operational problems. Accordingly, the purpose of this study is to present obstacles and directions for improvement in construction-related laws (Building Act, Construction Technology Promotion Act, Housing Act, Construction Machinery Management Act, etc.) for practical operation of 3D printing. The important results are as follows. Amending existing construction-related laws for 3D printing is irrational and inefficient in terms of structure and material. This study proposed a method of satisfying performance required by laws or standards based on the performance design method presented in existing laws and systems through structure and material performance certification procedure. In addition, inclusion of 3D printing equipment in the Construction Machinery Management Act results in various restrictions such as equipment inspection and certification of machine parts. As such restrictions can block vitalization of 3D printing, a long-term and step-wise approach was suggested.

A Study on the Selection of High-Risk Construction Types for Safety Management on Construction Projects (건설공사 안전관리를 위한 고위험 공종 선정에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.137-138
    • /
    • 2022
  • Construction work has potential risk factors in the process. Therefore, the safety management task is very important and requires continuous management. In particular, the importance of safety management in construction projects has been highlighted recently with the introduction of the act on punishment of serious disasters. In this perspective, this study intends to select and present high-risk construction types that requires safety management. The presented result is expected to present standards for systematically performing safety management of construction projects.

  • PDF

A Study on the Improvement of Inspection System for Building Maintenance (건축물 유지관리점검 체계화를 위한 제도 개선방안)

  • Yu, Kwang-Heum;Kim, Min-Ji
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.63-73
    • /
    • 2018
  • As the life cycle of buildings is expected to increase, new constructions will decrease and the proportion of remodeling and repair will increase. Therefore, there is an increasing need for overall performance management of old buildings. In 2020, the proportion of buildings over 30 years old is expected to reach a half. As a result, the demand for securing and improving the performance in the stage of using the building is increasing due to the change in the demand for the building, such as the decrease in the construction permit and the increase in the use of the existing building. From this perspective, the study sought to consider institutional measures to organize the preventive and conservative maintenance of buildings. For this purpose, the conceptual goals of inspection for building maintenance were set through a literature review, and the status and problems associated with building maintenance were analyzed to suggest ways to improve the inspection system for building maintenance.

A Research on the Development of Management Process System of Public Ordering Service Results and Estimation (건설기술용역 실적 관리 프로세스 시스템 개발에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.168-169
    • /
    • 2014
  • Construction Technology Service is currently hardly managed due to failure to offer standard management system of service performance, company performance, and business evaluation in every Ordering Agencies. After Construction Technology Promotion Act is enforced in May 2014, Ordering Agency obligates them to report to Minister of Land and Transportation within 10 days upon contract/ amendment/ completion. In 2013, in advance to enforcement of this law, performance management system for construction technology service was developed for a test run. However this system only applies to main contractors while management and operation of subcontractors are unavailable that causes problems on connection and integration with Experience Management Trustee. Therefore, this research will establish systematic foundation that enables real-time information of service performance and evaluation of subcontractors to result standardization of performance and evaluation for public ordered services.

  • PDF

A Study for Improving Quality Management System of Naval Ships to Enhance Safety (함정 안전성 향상을 위한 품질관리체계 개선 방안 연구)

  • Ki-chul, Hwang;Jong-ha, Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.59 no.6
    • /
    • pp.432-438
    • /
    • 2022
  • This study focuses on improving quality management system of naval ships to enhance safety. Recently, there were problems caused by the lack of quality management system when building Korea naval ships. Foreign naval ships are designed and built through certification by professional organizations in the commercial sector to reduce budget and enhance ship safety. Merchant ships are designed, built, operated and maintained by the organizations in accordance with the Ship Safety Act. When naval ships are exported, the ordering country requires the certification from the international classification to ensure the safety and reliability of ships. Through this study, as a method of improving the quality management system of naval ships, design verification, equipment certification and construction survey using expertise of the organizations are proposed when designing and building the naval ships.

A Proposal of Hazard/Risk Assessment Criteria and an Asbestos Management Method for Asbestos-containing Building Materials

  • Park, Wha-Me;Kim, Yoon-Shin
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.1
    • /
    • pp.66-72
    • /
    • 2012
  • Objectives: The AHERA method by the US EPA, ASTM E2356-04, and HSG264 by the UK HSE, all of which are hazard/risk assessment methods for asbestos-containing building materials, were reviewed and compared based on 231 homogeneous areas. In addition, the current Act on Asbestos Safety Management (enforcement: April 29, 2012) was reviewed and analyzed. This trial provided fundamental data for improving the current asbestos hazard/risk assessment method. Methods: For the hazard/risk assessment of 77 asbestos-containing public buildings including schools, 231 homogeneous areas were selected, each of which was assessed using AHERA, ASTM E2356-04, and HSG264. Results: The matching rate of the hazard/risk assessment stood at 20.4 percent between AHERA and ASTM, at 71.4 percent between AHERA and HSG264 and at 17.8 percent between ASTM and HSG264. The AHERA method includes a seven-category rating scale. There were three categories, two of which have three subcategories. ASTM provides two decision-making charts consisting of ten rating scales for current condition estimation and for potential for disturbance estimation. In addition, the HSG264 method has a total of 20 scores with four items, and then provides four grades. This HSG264 method cannot clearly separate current condition and potential for disturbance. Conclusions: In the Korean Act on Asbestos Safety Management, the hazard/risk assessment method for asbestos-containing building materials should consider balance between current condition estimation and the potential for disturbance estimation.

A Study on the Actual Conditions of Safety Manager's Work in Construction Projects (건설공사 안전관리자 업무 분장 실태조사 연구)

  • Kim, Han-Eol;Ahn, Jae-Hong;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.371-372
    • /
    • 2023
  • If the participants in construction site safety management perform their duties in accordance with the provisions of the Industrial Safety and Health Act, the burden on safety managers would be minimal. However, the lack of specific work guidelines for each participating entity and the greater responsibility of the safety and health general manager than the management supervisor have resulted in safety managers' workload being increased due to the problem of management supervisors' neglect of safety management. In this study, we conducted a survey of the safety manager's duties and related documents during the construction project initiation, early stages, ongoing work, and disaster occurrence/investigation, and conducted interviews to improve and enhance the division of duties.

  • PDF