A Benchmarking Tool to Assess the Role of the Construction Manager in terms of Project Teamwork Supports

  • Kim, Chan-Kyu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.200-207
    • /
    • 2011
  • Construction management services have been adopted for more than a decade and are continuously growing; however, the advantages of utilizing a construction management service are still not quite clear, regardless of many arguments can be made in their favor. The construction manager, as a coordinator, is supposed to smoothly facilitate the project teamwork in order to deliver a profitable and satisfactory project, not only for the owner's interests but also for the success of all project participants. This study has focused on the teamwork supports a construction manager can provide during project operations. This study developed a benchmarking tool to assess the construction manager's role in terms of its project teamwork supports, by utilizing the evaluation model and several case studies. In addition, this study also attempted to set the industry average and higher performance so that both the owner and the construction manager can self-assess, and more importantly, can improve project operation. The actual implementation of the benchmarking tool into on-going projects can allow the construction manager to understand the current operation and to make a better project process through teamwork.

Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - (국내·외 BIM 적용 프로젝트의 BIM 적용수준 비교분석 - BIM 저널 및 Awards 수상작 사례를 중심으로 -)

  • Koh, Sung-Hoon;Ham, Nam-Hyuk;Lee, Joo-Sung;Yoon, Su-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.25-35
    • /
    • 2017
  • Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression (머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구)

  • Kang, Yun-Ho;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF

Outline of Standard Classifications for International Power Plant Construction (해외 발전소 건설의 효율화를 위한 표준분류체계 상위구조)

  • Kang, Mi-Yeon;Ha, Jiwon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.184-185
    • /
    • 2014
  • International construction contracts to Korean construction companies have been dramatically increased over the 48 years (Contract received worth 65.2 billion dollars in 2013). Especially, the plant construction sector has achieved about 61% among the 65.2 billion dollars. Under this trend, in order to ensure plant construction's competitiveness, 'standard classification' is an important area for systematic management. However, these standards in the plant construction are not widely utilized yet, in comparison with civil and building sectors. Therefore, in this research, a higher level of standard classifications is proposed for various types of power plants from a PMO's (Project Management Office) perspective. This study also provides a comparative analysis outlining different features and common components based on various types of power plants.

  • PDF

A Study on the Control of the Floor Vibration in a Research Building (연구소(硏究所) 건물(建物)의 슬래브 진동(振動) 성능개선(性能改善) 연구(硏究))

  • Baik, In-Whee;Kang, Ho-Sub;Sohn, Young-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.75-82
    • /
    • 2007
  • A vibration in the building occurs by influences of the facility equipment and the structural system. As the building recently becomes higher and bigger, the vibration in the floor slab is issued. Specially, the vibration with $4{\sim}8Hz$ frequency is harder to control than any other range of frequency. This vibration easily affects human sensibility and often makes the resonance phenomenon by corresponding with the floor slab's natural frequency when people and heavy equipments move. Moreover, the permission regulations for the vibration of the building are established by building's purposes. However, it is not subdivided in detail and sometimes ambiguous to each client. Even though the vibration could cause negative influences in a research building, there is not the vibration criterion for a research building. Therefore, it is necessary to set up its own vibration criterion with the client before building and to keep checking this vibration criterion under the construction. This study proposes the reasonable control methods and the vibration criterion for floor slab's vibration which are adapted to the R4-project. The R4-project is a research building and a high-rise building also. Accordingly, this study could help to the next similar project in the design and the construction phase.

ANALYSIS OF ENVIRONMENT-FRIENDLY BUILDING MATERIALS FOR AGED HOUSING REMODELING

  • Ki-Hyon Kim;Kyung-Rai Kim;Hee-Sung Cha
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.311-317
    • /
    • 2007
  • "Environmentally Sound and Sustainable Development (ESSD)" is a key word in recent years. The construction industry, have put a great influence on ergonomic and sustainable environment. Recently, "green building certifications", such as Indoor Air Quality (IAQ) and eco-friendly material regulation have been established. With this regard, new construction and aged-housing remodeling projects are required to meet these certification criteria. Multi-housing residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Aged-housing remodeling project is very unique in that building residents are selected prior to design phase. Therefore, the analysis of resident's need for building materials in aged-housing remodeling is relatively easy compared to new building construction. As such, it is very important to analyze their preferences for eco-friendly materials prior to project execution. The purpose of this study is to find the needs of residents and priority of their needs. Based on their needs and priority, this paper provides a new strategy in using environment-friendly materials and maximizing their satisfaction level when aged housing remodeling is constructed. In addition, this paper provide new criteria in selecting new developed environmental materials in remodeling projects for the purpose of improving the safety and health level in construction industry.

  • PDF

Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System (모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안)

  • Lee, Jong-Ho;Eom, Shin-Jo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF

Prediction of Building Construction Project Costs Using Adaptive Neuro-Fuzzy Inference System(ANFIS) (적응형 뉴로-퍼지(ANFIS)를 이용한 건축공사비 예측)

  • Yun, Seok-Heon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.103-111
    • /
    • 2023
  • Accurate cost estimation in the early stages of a construction project is critical to the successful execution of the project. In this study, an ANFIS model was presented to predict construction costs in the early stages of a construction project. To increase the usability of the model, open construction cost data was used, and a model using limited information in the early stage of the project was presented. We analyzed existing studies related to ANFIS to identify recent trends, and after reviewing the basic structure of ANFIS, presented an ANFIS model for predicting conceptual construction costs. The variation in prediction performance depending on the type and number of membership functions of the ANFIS model was analyzed, the model with the best performance was presented, and the prediction accuracy of representative machine learning models was compared and analyzed. Through comparing the ANFIS model with other machine learning models, it was found to show equal or better performance, and it is concluded that it can be applied to predicting construction costs in the early stage of a project.