Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

A Analysis of the Noise Reduction Measures Efficiency in the Downtown Construction the Remodeling (도심지 공사에서의 소음방지 효과에 관한 연구 - 실시공 사례를 위주로 -)

  • Cho, Hyun-Woo;Park, Jeong-Hun;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.123-128
    • /
    • 2003
  • The purpose of this study is to analyze the efficiency of the noise reduction measure in the downtown construction. For decades, the life level rise in Korea makes the environmental issues developed the important issues. Specially the noise problems have become the hot issue in the building construction. This study covers the efficiency of the measures, which is used in the construction field to reduce the noise. The case was obtained by Korean E&C company in 2003. It is used as important sources. The results of this study are as follows; the reduction efficiency is higher than that of the old measure. But more efforts are needed to comfort nearby residents.

Basic Research for Construction Indoor Digital Twin Construction (건설공사 실내 Digital Twin 구축을 위한 기초연구)

  • Kim, Young Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.349-350
    • /
    • 2023
  • In the field of domestic construction, 3D modeling mainly targets outdoor construction sites, and acquires outdoor spatial information by operating UAVs and UGVs equipped with cameras. 3D modeling of construction sites tends to expand its scope to indoors along with the increasing demand for site monitoring and management through indoor spatial information. In the case of indoors, it is impossible to shoot with a drone after the framework and outer walls of the building are completed, so it is necessary to collect indoor spatial information and 3D modeling using a 360 camera. The purpose of this study is limited to basic research to establish a process that can obtain simple and high-quality indoor 3D modeling results using indoor data collected from 360 cameras.

  • PDF

Prediction of Time-dependent Lateral Movement Induced by Differential Shortening in Tall Buildings Using Construction Stage Analysis

  • Ha, Taehun;Kim, Sangdae;Lee, Sungho
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2017
  • High-rise buildings move during construction due to time-dependent material properties of concrete (creep and shrinkage), construction sequences, and structural shapes. The building movements, including vertical and horizontal displacements, result from the sum of axial and lateral deformation of vertical members at each level. In addition to the vertical shortenings, the lateral movement induced by differential shortening can have adverse effects on the construction tolerance and serviceability of non-structural elements such as elevators and curtain walls. In this study a construction stage analysis method is developed to predict lateral movement induced by shortening, including the effect of creep and shrinkage. The algorithm of construction stage analysis is combined with the FE analysis program. It is then applied to predict lateral movement of a 58-story reinforced concrete building that was constructed in Kuala Lumpur, Malaysia. Gravity induced lateral movement of this building is predicted by the construction stage analysis. A field three-dimensional laser scanning survey is carried out to verify the prediction results, and satisfactory agreement is obtained.

Visualization Based Building Anatomy Model for Construction Safety Education

  • Pham, Hai Chien;Le, Quang Tuan;Pedro, Akeem;Park, Chan Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.430-434
    • /
    • 2015
  • Safety education at the tertiary level prepares students to enter construction industry with adequate safety knowledge; then accidents can be prevented proactively. However, safety subject has not been paid adequate attention in universities and most institutional safety programs consider safety matters in isolation. Meanwhile, anatomical theory in the medicine field has been successfully adopted and proved potential advantageous in various scientific disciplines. With this regard, this study proposes a visualization based Building Anatomy Model (BAM) for construction safety education, which utilizes the anatomical theory in order to improve student's safety knowledge and practical skill. This BAM consists of two modules: 1) Knowledge Acquisition Module (KAM) aims to deliver safety knowledge to students through building anatomy models; 2) Practical Experience Module (PEM) where students safely perform construction activities by using the system to improve safety skill. The system trial is validated with virtual scenarios derived from real accidents cases. This study emphasizes the visualization based building anatomy model would be a powerful pedagogical method to provide effectively safety knowledge and practical skill for students, as a result, safety competence of students would be enhanced.

  • PDF

Field Investigation Work Modeling on Defect Inspecting Step of Defect Consulting in Apartment Building of Korea (공동주택 하자감정을 위한 하자조사단계의 현장조사 업무 모델링)

  • Park, Jun-Mo;Seo, Deok-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.87-88
    • /
    • 2015
  • A defect dispute surrounding an apartment building is in constant trouble, a defect consulting is necessary that objective and impartial for solving a defect. The defect dispute about a defect lawsuit is conducted in the order that filling of lawsuit, consulting order, defect inspecting, estimating a repairing cost, writing a consulting report, submitting a consulting report, and decision by court. Of these, a step of defect inspecting is extensively investigated an occurred defect that each defect index and type from each part and place. At this time, it is collected of many data and created many information. For this, it need to organize and manage. The study is a modeling of field investigation work process that second phase of defect inspecting step. A literature study is defined a work until level 2. This study is defined the work until level 3 to 4. In addition, the modeling can do for using a job name, a place to job, a job to do, and a person concerned about defect consulting case. The modeling is expected a contribution of improving a defect consulting process and systematizing a judgment standard.

  • PDF

Field Applicability Of Emergency Road Repair Material Using the CAC (CAC를 이용한 긴급도로 보수재의 현장 적용성)

  • Hyun, Ji-Soo;Kim, Jin-Man;Choi, Hong-Beom;Lee, Ha-Na;Koo, Ja-Sul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.154-155
    • /
    • 2015
  • This study was to review the basic characteristics in order to evaluate field application of the emergency road repair materials for development of CAC(Calcium Aluminate Composite) usage. The experiment was conducted with two phases of field and laboratory conditions and the laboratory experiment consisted indoor and outdoor tests for compressive and flexural strength. In the result of an experiment, for the compressive strength test, the specimens that cured in the laboratory conditions were not satisfied the requirement of standards, while the specimens that cured in the field conditions were well satisfied with those. For flexural strength test, the result value was satisfied with the requirement on the standards only in outdoor curing condition of laboratory experiment. Based on these results, it is expected that the CAC can be used as an emergency road repair material for field conditions.

  • PDF

Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field (건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석)

  • Choi, Jaehyun;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.115-121
    • /
    • 2015
  • As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.