With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.
최근에는 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화로 건설공사의 성공적 수행에 중대한 영향을 미치는 공사기간에 대한 관심이 증대되고 있다. 또한 건설시장의 축소와 최저가 입찰제도하에서 건설수주 경쟁은 더욱 치열해짐에 따라 적정 공사기간의 산정과 예측은 매우 중요하다. 이러한 공사기간에 대한 중요성을 인지하고 공사기간을 비교 분석하거나 예측하고자 하는 연구들이 진행되었다. 국내에서 공사기간의 비교연구는 공동주택과 사무소 건축에 국한되었고 국외에서는 통계적 분석과 시뮬레이션을 통한 공사기간의 예측에 대한 연구가 많이 수행된 반면, 건물에 대한 수요의 변화로 발생된 주상복합건물과 오피스텔건물에 대한 공사기간의 실제 사례비교에 대한 연구는 거의 없다. 이에 본 연구는 국내 건설사들의 주상복합 및 오피스텔 건물의 실적공기와 가상사례를 활용하여 공사기간을 비교 분석한 후 공기 경쟁력 확보를 위한 공사단계 별 대응현황을 분석하는 것을 목적으로 한다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.664-664
/
2015
Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.
Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.
The 5th International Conference on Construction Engineering and Project Management
/
pp.558-565
/
2013
The process and efficiency of monitoring building and construction violations is a concern of the construction industry. The detection of violations requires appropriate and sufficiently accurate spatial information to manage and support a comprehensive inspection process and monitor compliance. A building inspection workflow must extract appropriate spatial and measurement in-formation from a variety of sources, identify potential violations across a range of compliance criteria and determine the quality of resulting inspection reports. This paper presents a framework for supporting building inspections using spatial information and methods to detect construction violations and compliance. Current inspection processes involve issues around the identification of building violations, access to building regulations and existing spatial information, integration of a range of spatial and non-spatial information, and the quality of decisions within the inspection workflows. A survey of building inspectors was conducted and used together with the issues identified to establish the requirements for a spatial inspection framework. The results demonstrate how such a framework can support improved decision-making and reduced fieldwork effort in detecting and measuring the accuracy of building violations involving building placements, street offsets and footprint areas.
건축프로젝트의 성공적인 수행을 위해서는 현장 조직의 커뮤니케이션 수준을 높여서 조직 구성원의 협업 능력을 향상시켜야 한다. 따라서 본 연구의 목적은 건축프로젝트 현장 조직을 대상으로 현장 조직 커뮤니케이션이 프로젝트 성과에 어떤 영향을 미치는지 파악하는 것이다. 연구 결과 커뮤니케이션 품질은 프로젝트 성과에 긍정적인 영향을 미치며, 정보공유는 프로젝트 성과에 부정적인 영향을 미치는 것으로 나타났다. 따라서 건축프로젝트 성과를 향상시키기 위해서는 현장 조직에서 정보공유를 일정수준 이상 달성해야 하고, 커뮤니케이션 품질을 향상시켜야 한다. 본 연구 결과는 건축프로젝트 현장 조직의 수행관리 체계를 구축하는데 기여할 수 있을 것이다.
This study aims to monitor the variation of modal frequencies of steel buildings during their construction sequence. In this respect, construction of a steel building is followed by vibration based measurements. The monitored building is a three-story educational building within a building group whose structural system consists of steel moment resisting steel frames and eccentric braces. Five different acceleration measurements in two perpendicular directions are taken on five different construction stages, starting from the erection of the columns and beams ending with the completion of the construction. The recorded measurements are transferred into frequency domain and the dominant frequencies for each case have been determined. The change in the dominant frequencies is evaluated with the existing construction stages and performed constructional works between the stages. The last measurement, performed on the building in service, revealed the first two dominant frequencies as mutual in X and Y direction, showing that these dynamic modes are torsional modes. This result is investigated by numerical analysis performed with finite element model of the building constructed for design purpose. Lower frequencies and different mode shapes are determined from numerical analysis. The reason of lower frequencies is discussed and the vibration survey is extended to determine the effects of an adjacent building. The results showed that the building is in strong relation with an adjoining building in spite of a designed construction joint.
There is a limit to preventing various types of safety accidents in advance at construction sites. Even for buildings of the same total floor area, it is expected that the more complex the building shape or the higher the number of floors, the higher the probability of a safety accident. Therefore, it is necessary to analyze the effect of the shape of a building on safety accidents using safety accident data generated during actual construction. The purpose of this study is to analyze the impact of building shape on safety accidents. As a result, the R2 value of shape factor and safety accident was 0.901, and the R2 value of construction difficulty and safety accident was 0.944. In the future, the results of this study will be used as basic data for improving safety management related systems.
The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.
The 3th International Conference on Construction Engineering and Project Management
/
pp.153-160
/
2009
The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.