• Title/Summary/Keyword: bridges

Search Result 4,196, Processing Time 0.026 seconds

Experimental Study on Pull Out Characteristics of Adhesive Anchor (부착식 앵커의 인발 특성에 관한 실험적 연구)

  • Yoo, Sung Won;Jung, Sang-Hwa;Kwak, Ki-Suk;Lee, Ju-Hyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3A
    • /
    • pp.555-563
    • /
    • 2006
  • Recently, many bridges become not only functionally obsolete of bridge deck due to inadequate width but also structurally deficient of substructure due to erosion. In these cases, widening is almost always more economical than complete replacement, and therefore there is a need to make available the results of research and field experience pertaining to the widening of bridge substructure. But, an experimental study for the guarantee of unification between existing and new substructure with adhesive anchor is so insufficient that the development of adhesive anchor system for the unification should be settled promptly. The purpose of the present study is to explore pull out and shear characteristics of adhesive anchor system. For this purpose, several series of concrete specimens have been tested. Major test variables were the bonded length, anchor diameter and anchor slope. The pull out strength, bond stress and shear strength of adhesive faces were measured for the specimens. The present study indicates that the pull out strength increased with more bonded length and more anchor diameter, and that the bond stress decreased with more bonded length and more anchor diameter. The pull out strength and the bond stress increases with more anchor slope and it is considered that the slope of $5^{\circ}$ was more efficient. From the shear tests, it is supposed that anchor diameters more than D19 was proper to the adhesive anchor. Finally, it is expected that both experimental data in these tests and further study including mock-up tests will contribute to the establishment of the unification between existing and new substructure with adhesive anchor.

Mixing Characteristics of Nonconservative Pollutants in Paldang Lake (팔당호에 유입된 비보존성 오염물질의 혼합거동)

  • Seo, Il Won;Choi, Nam Jeong;Jun, In Ok;Song, Chang Geun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3B
    • /
    • pp.221-230
    • /
    • 2009
  • In Korea, many water intake plants are easily affected by effluents of sewage treatment plants because sewage treatment plants are usually located upstream or nearby the plants of the same riverine area. Furthermore, the inflow of harmful contaminants owing to pollutant spills or transportation accidents of vehicles using the roads and bridges intersecting the river causes significant impact on the management of water intake plants. Paldang lake, the main water intake plants in Korea, is especially exposed to various water pollution accidents, because the drainage basin area is significantly large compared to the water surface area of the lake. Therefore it is necessary to predict the possible pollutant spill in advance and consider measurements in case of water pollution. In this study, water quality prediction was performed in Paldang Lake in Korea durig the dry season using two-dimensional numerical models. In order to represent the cases of pollutant accidents, the difference of pollutant transport patterns with varying injection points was analyzed. Numerical simulations for hydrodynamics of water flow and water quality predictions were performed using RMA-2 and RAM4 respectively. As a result of simulation, the difference of pollutant transport with the injection points was analyzed. As a countermeasure against the pollutant accident, the augmentation of the flow rate is proposed. In comparison with the present state, the rapid dilution and flushing effects on the pollutant cloud could be expected with increase of flow rate. Thus, increase of flow rate can be used for operation of water intake plants in case of pollutant spill accidents.

A Method for the Effective Implementation of a Consignment Contract in Road Constructions (도로 수탁공사의 효과적 수행을 위한 방법론)

  • Bak, Gwon-June;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.153-161
    • /
    • 2010
  • The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.

Evaluation of Flexural Ductility of Negative Moment Region of I-Girder with High Strength Steel (고강도 강재 적용 I-거더의 부모멘트부 휨연성 평가)

  • Joo, Hyunsung;Moon, Jiho;Choi, Byung-Ho;Lee, Hak-Eun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6A
    • /
    • pp.513-523
    • /
    • 2010
  • For continuous I-girder bridges, a large negative bending moment is generated near pier region so that plastic hinge is first formed at this point. Then, the bending moment is redistributed when the I-girder has enough flexural ductility (or rotational capacity). However, for I-girder with high strength steel, it is known that the flexural ductility is considerably decreased by increasing the yield strength of material. Thus, it is necessary to conduct a study for guaranteeing proper flexural ductility of I-girder with high-strength steel. In this study, the evaluation of flexural ductility of negative moment region of I-girder with high strength steel where yield stress of steel is 680 MPa is presented based on the results of finite element analysis and experiment. From the results, it is found that the flexural ductility of the I-girder is significantly reduced due to the increase of elastic deformation and the decrease of plastic deformation ability of the material when the yield strength increases. In this study, the method to improve the flexural ductility of I-girder with high strength steel is proposed by an unequal installation of cross beam and an optimal position of cross beam is also suggested. Finally, the effects of the unequal installation of cross beam on the flexural ductility are discussed based on the experimental results.

A Experimental Study on the Stiffness Characteristics of Elastomeric Bearings (탄성받침의 강성특성에 대한 실험연구)

  • Yoon, Hyejin;Cho, Changbeck;Kim, Youngjin;Kwahk, Imjong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.475-485
    • /
    • 2008
  • This paper intends to enhance the reliability and performance of domestic elastomeric bearings through the proposal of directions for the improvement of their stiffness regard to the Korean industrial standard KS F 4420 relative to the evaluation of design/fabrication/quality. Therefore, comparative analysis of the compressive elastic modulus, stiffness measurement method and performance evaluation method of KS F 4420 with those of Eurocode, Japanese bearing manual, and ISO code was performed, and measurement tests on the compressive stiffness and shear stiffness of common elastomeric bearings produced in Korea were conducted. The experimental results reveal that differences of about 20% and 13% occurred respectively for the compressive stiffness and shear stiffness according to the definition adopted for the stiffness. The measured values for the stiffness of the domestic elastomeric bearings were also verified to exhibit large deviation from the formula proposed by KS F 4420. Elastomeric bearings that does not have appropriate compressive stiffness required at the design can result in uneven deflection at supports of bridges and excessive stress in girders. Accordingly, the establishment of compressive elastic modulus formula and performance evaluation criteria fitted to the domestic circumstances through the execution of performance evaluation of bearings presenting diversified shapes and shape factors appears to be necessary for the domestic bearings to meet the performance required in design.

Distribution Status and Extinction Threat Evaluation of the Short Ninespine Stickleback Pungitius kaibarae (Gasterosteidae) in Korea (잔가시고기 Pungitius kaibarae (큰가시고기과)의 분포 현황 및 멸종위협평가)

  • Myeong-Hun Ko;Mee-Sook Han;Hyeong-Su Kim
    • Korean Journal of Ichthyology
    • /
    • v.34 no.4
    • /
    • pp.262-269
    • /
    • 2022
  • A distribution survey was conducted from 2018 to 2020 to evaluate the distribution status, habitat characteristics, and extinction threat of the short ninespine stickleback Pungitius kaibarae (Gasterosteidae). Literature reports of P. kaibarae distribution have been sorted by each period, 1980~1996, 1997~2005, and 2007~2017, and the samples were collected in 32, 43, and 64 stations for each period. Among the 75 streams and 193 sampling sites investigated during the study period, 1,400 P. kaibarae individuals were collected from 26 streams at 39 sites. The main habitat of P. kaibarae was downstream or brackish water zones with a low altitude, slow water velocity, and many aquatic plants. The main reasons for the decline in population size were assumed to be drought and flood, river work for flood restoration and river maintenance, bridges construction, and predation by the exotic fish species Micropterus salmoides. Previous evidence reported a 42.6% reduction in occupancy within 10 years, a decline in habitat quality, and the spread and impact of the exotic fish species Micropterus salmoides. Therefore, P. kaibarae is now considered a Vulnerable (VU A2ace) species based on the IUCN Red List categories and criteria. Therefore, P. kaibarae should be redesignated as an endangered species by the Ministry of Environment and systematically managed.

Closing Analysis of Symmetric Steel Cable-stayed Bridges and Estimation of Construction Error (대칭형 강 사장교의 폐합해석과 시공오차의 예측)

  • Lee, Min Kwon;Lee, Hae Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.55-65
    • /
    • 2006
  • This paper presents the closing analysis of a symmetric steel cable-stayed bridge erected by a free cantilever method. Two independent structural systems are formed before the closing procedure of a bridge is performed, and thus the compatibility conditions for vertical displacement and rotational angle are not satisfied at the closing section without the application of proper sectional forces. Since, however, it is usually impossible to apply sectional forces at the closing section, the compatibility conditions should be satisfied by proper external forces that can be actually applicable to a bridge. Unstrained lengths of selected cables and the pull-up force of a derrick crane are adjusted to satisfy nonlinear compatibility conditions, which are solved iteratively by the Newton-Raphson method. Cable members are modeled by the elastic catenary cable elements, and towers and main girders are discretized by linear 3-D frame elements. The sensitivities of displacement with respect to the unstrained lengths of selected cables and the pull-up force of the derrick crane are evaluated by the direct differentiation of the equilibrium equation. A Monte-Carlo simulation approach is proposed to estimate expected construction errors for a given confidence level. The proposed method is applied to the second Jindo Grand Bridge to demonstrate its validity and effectiveness.

A Study on Rational Design and Construction of High-Tension-Bolt Friction Joints (고장력볼트 마찰이음의 합리적 설계 및 시공에 관한 연구)

  • Lee, Seung Yong;Kyung, Kab Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3A
    • /
    • pp.513-521
    • /
    • 2006
  • Many studies have been conducted on the high tension bolt friction connection in the view of the field practice. Those effort, however, unfortunately have not been appropriately applied in the design specifications. Recently, particularly for steel bridges, rationalization of design takes greater attention from designers and hence, demand on rationalization of high tension connection becomes more significant. The purpose of this study is to suggest direction for the rationalization of high tension bolt connection and to also provide fundamental information for the improvement of the design specifications. In order to accomplish the purposes, the design specifications in Korea was analyzed and compared with other specification from abroad, and was studied one of the most important factors including slip coefficient, and the specifications on the size of bolt holes. The effect of over-sized bolt hole and the reduction of axial force on bolt was evaluated through the experimental studies on the slippage of the high tension bolt connections. Other research topics included herein includes the difference of slip coefficients, the effect of over-sized bolt holes and the gap distance of members, and the application of filler plate and corrosion protected bolts. From the research results, it is known that the specifications in Korea apply a constant slip coefficient with respect to the contacted surface conditions while various coefficients are available depending on the contacted surface conditions. Therefore, it is recommended that the specifications in Korea also develop and detail the slip coefficient which can appropriately take account of the variation of the contacted surface conditions. It is also suggested that the limitation abroad on the over-sized bolt hole may be applied for enhancing the effectiveness of construction.

Ship Collision Risk Assessment for Bridges (교량의 선박충돌위험도 평가)

  • Lee, Seong Lo;Bae, Yong Gwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.1-9
    • /
    • 2006
  • An analysis of the annual frequency of collapse(AF) is performed for each bridge pier exposed to ship collision. From this analysis, the impact lateral resistance can be determined for each pier. The bridge pier impact resistance is selected using a probability-based analysis procedure in which the predicted annual frequency of bridge collapse, AF, from the ship collision risk assessment is compared to an acceptance criterion. The analysis procedure is an iterative process in which a trial impact resistance is selected for a bridge component and a computed AF is compared to the acceptance criterion, and revisions to the analysis variables are made as necessary to achieve compliance. The distribution of the AF acceptance criterion among the exposed piers is generally based on the designer's judgment. In this study, the acceptance criterion is allocated to each pier using allocation weights based on the previous predictions. To determine the design impact lateral resistance of bridge components such pylon and pier, the numerical analysis is performed iteratively with the analysis variable of impact resistance ratio of pylon to pier. The design impact lateral resistance can vary greatly among the components of the same bridge, depending upon the waterway geometry, available water depth, bridge geometry, and vessel traffic characteristics. More researches on the allocation model of AF and the determination of impact resistance are required.

Comparison of Measured Natural Frequencies of a Railway Bridge Specimen Between Different Excitation Methods (철도교량 시험체의 가진방법에 따른 고유진동수 측정치 변동에 대한 비교 분석)

  • Kim, Sung-Il;Lee, Jungwhee;Lee, Pil-Goo;Kim, Choong-Eon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6A
    • /
    • pp.535-542
    • /
    • 2010
  • Precise estimation of a structure's dynamic characteristics is indispensable for ensuring stable dynamic responses during lifetime especially for the structures which can experience resonance such as railway bridges. In this paper, the results of forced vibration tests of different excitation methods (vibration exciter and impact hammer) are compared to examine the differences and the cause of differences of extracted natural frequencies. Consequently a natural frequency modification method is suggested to eliminate effects of non-structural disturbance factors. Also, sequential forced vibration tests are performed before and after track construction according to the construction stage of a railway bridge, and the variation of natural frequencies are examined. Effect of added mass of vibration exciter and variation of support condition due to the level of excitation force are concluded as the major cause of natural frequency differences. Thus eliminating these effects can enhance the reliability of the extracted natural frequencies. Construction of track affects not only the mass of structure but also the stiffness of the structure. Also, the amount of increase in stiffness varies according to the level of structural deflection. Therefore, reasonable estimation of the level of structural response during operation is important for precise natural frequency calculation at design phase.