• Title/Summary/Keyword: bridge members

Search Result 343, Processing Time 0.03 seconds

An Extension Method of IFC Model for Representing Design Information of Steel Bridge Members (강교 부재의 설계정보 표현을 위한 IFC 모델의 확장 방안)

  • Yi, Jin-Hoon;Huang, Meng-Gang;Lee, Ji-Hoon;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.524-531
    • /
    • 2008
  • A method for representing detailed design information of steel bridge member is proposed on the basis of the IFC model. As a first step, bridge related entities in the IFC-BRIDGE V2 and their functions are analyzed. In addition, design documents of steel bridge members are analyzed to extract information items that are not handled in the IFC-BRIDGE V2. It is recommended that several entities in the IFC-BRIDGE V2, such as ifcBridgeFibre, IfcBridgeReferenceLine, and IfcBridgeSection, should be properly relocated. In addition, IfcBridgeStiffener, IfcBridgeJointSystem, IfcBridgeDiaphragm, and IfcBridgeShearConnector are added as subtypes of IfcBridgeElementComponent for representing the stiffener, joint system, diaphragm, and shear connector, respectively. The added new entities inherit all attributes of IfcProduct which is linked with other resources: geometric representation, placement, material information, and so on. Thus, it is considered that a proposed in-depth IFC-BRIDGE model can be used more widely.

  • PDF

Development of automatic system for evaluating the stress redistribution in structural members of a steel cable-stayed bridge due to cable stress relaxation

  • Hong, Tien-Thang;Kim, Jung J.;Thai, Duc-Kien;Kim, Seung-Eock
    • Steel and Composite Structures
    • /
    • v.44 no.6
    • /
    • pp.753-768
    • /
    • 2022
  • In this study, a graphical automatic system is developed in order to investigate the stress redistribution of structural members in a steel cable-stayed bridge. The generalized Maxwell model is selected for stress relaxation estimation, and it is carefully verified and applied to all the cable members of a steel cable-stayed bridge to investigate its stress relaxation. A set of stress relaxation parameters in all cables is determined using the fmincon optimization function. The stress redistribution of the steel cable-stayed bridge is then analyzed using ABAQUS. To shorten the investigation time, all the aforementioned phases are built up to be an automatic system. The automatic system is then employed to investigate the effect of cable cross-section areas and girder spans on stress redistribution. The findings from these studies show that the initial tension in the cables of a steel cable-stayed bridge should be kept to less than 55% of the cable's ultimate strength to reduce the effect of cable stress relaxation. The cable space in a steel cable-stayed bridge should be limited to 15,000 mm to minimize the effect of cable stress relaxation. In comparison to other structural members of a steel cable-stayed bridge, the girders experience a significant stress redistribution.

Stochastic modelling and optimum inspection and maintenance strategy for fatigue affected steel bridge members

  • Huang, Tian-Li;Zhou, Hao;Chen, Hua-Peng;Ren, Wei-Xin
    • Smart Structures and Systems
    • /
    • v.18 no.3
    • /
    • pp.569-584
    • /
    • 2016
  • This paper presents a method for stochastic modelling of fatigue crack growth and optimising inspection and maintenance strategy for the structural members of steel bridges. The fatigue crack evolution is considered as a stochastic process with uncertainties, and the Gamma process is adopted to simulate the propagation of fatigue crack in steel bridge members. From the stochastic modelling for fatigue crack growth, the probability of failure caused by fatigue is predicted over the service life of steel bridge members. The remaining fatigue life of steel bridge members is determined by comparing the fatigue crack length with its predetermined threshold. Furthermore, the probability of detection is adopted to consider the uncertainties in detecting fatigue crack by using existing damage detection techniques. A multi-objective optimisation problem is proposed and solved by a genetic algorithm to determine the optimised inspection and maintenance strategy for the fatigue affected steel bridge members. The optimised strategy is achieved by minimizing the life-cycle cost, including the inspection, maintenance and failure costs, and maximizing the service life after necessary intervention. The number of intervention during the service life is also taken into account to investigate the relationship between the service life and the cost for maintenance. The results from numerical examples show that the proposed method can provide a useful approach for cost-effective inspection and maintenance strategy for fatigue affected steel bridges.

Effects of local structural damage in a steel truss bridge on internal dynamic coupling and modal damping

  • Yamaguchi, Hiroki;Matsumoto, Yasunao;Yoshioka, Tsutomu
    • Smart Structures and Systems
    • /
    • v.15 no.3
    • /
    • pp.523-541
    • /
    • 2015
  • Structural health monitoring of steel truss bridge based on changes in modal properties was investigated in this study. Vibration measurements with five sensors were conducted at an existing Warren truss bridge with partial fractures in diagonal members before and after an emergency repair work. Modal properties identified by the Eigensystem Realization Algorithm showed evidences of increases in modal damping due to the damage in diagonal member. In order to understand the dynamic behavior of the bridge and possible mechanism of those increases in modal damping, theoretical modal analysis was conducted with three dimensional frame models. It was found that vibrations of the main truss could be coupled internally with local vibrations of diagonal members and the degree of coupling could change with structural changes in diagonal members. Additional vibration measurements with fifteen sensors were then conducted so as to understand the consistency of those theoretical findings with the actual dynamic behavior. Modal properties experimentally identified showed that the damping change caused by the damage in diagonal member described above could have occurred in a diagonal-coupled mode. The results in this study imply that damages in diagonal members could be detected from changes in modal damping of diagonal-coupled modes.

Ultimate Flexural Strength Evaluation of Construction Joints in PSC Bridge Girders (PSC 교량 부재의 시공이음부의 극한 휨강도 평가)

  • 채성태;오병환;김병석;이상희
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.279-284
    • /
    • 2002
  • Prestressed concrete(PSC) bridge structures with a number of continuous spans has been segmentally built in many countries. These methods include incremental launching method, movable scaffolding method, full staging method and balanced cantilever method. In these segmentally constructed prestressed concrete bridges, many construction joints exist and these construction joints are weak points in PSC bridges. The prestress force can be introduced prestress force continuously through the construction joints of PSC bridge superstructure using tendon couplers. The main objective of this study is to evaluate the structural behavior and ultimate flexural strength of construction joints in PSC girder bridge members. To this end, a comprehensive experimental program has been set up and a series of full-scale tests have been performed. Ultimate flexural strength of construction joint in PSC members with tendon couplers is decreased by approximately 10% for non-coupled members.

  • PDF

Fatigue Assessment of Steel Railway Bridge by Service Loading about 65 Years

  • Hong, Sung-Wook;Chai, Won-Kyu;Lee, Myeong-Gu
    • International Journal of Safety
    • /
    • v.9 no.1
    • /
    • pp.12-20
    • /
    • 2010
  • In this study, a series of random field test and dynamic analysis in the time domain were carried out in order to find in the reason of fatigue damage of the main and the secondary members in the 3-span continuous steel plate girder railway bridge being under in service over 60 years. From the measured and the analyzed results, the stress distribution patterns were investigated for the members with fatigue damage. In addition, global and local numerical stress analysis was performed for the members damaged severely by corrosion, to estimate variation of the distribution by corrosion. Finally, a reasonable cut-off ratio in the steel plate railway bridge will be proposed by analyzing the equivalent stress ranges according the ratio.

Mechanical Properties of the High Flowing Self-Compacting Concrete for Members of Bridge Overcrowded Arrangement of Bar (과밀 배근된 교량 부재용 초유동 자기충전 콘크리트의 역학적 특성)

  • Choi, Yun-Wang;Kim, Yong-Jic;Kang, Hyun-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.2
    • /
    • pp.175-183
    • /
    • 2008
  • Domestically, application of High Flowing Self-Compacting Concrete (HSCC) is limited to building structures and it is difficult to find examples of application in civil infrastructural constructions. However, in the case of North America and Europe, by introducing precast and prestressed system, HSCC is being used for high-density reinforced bridge members. Hence it is assessed that broadening the utilization of HSCC into areas such as bridges and civil construction is required. Therefore in this research, to apply HSCC to high-density reinforced bridge members, ground granulated blast-furnace slag and fly ash were mixed in binary and ternary systems. Also the dynamical characteristics of HSCC, following 1st class regulations of Japan Society of Civil Engineers (JSCE), were assessed to enable application on high-density reinforced structures. The test results revealed ternary system mixture showed better mechanical characteristics than binary system mixture and the application on high-density reinforced precast bridge members seems possible.

The Optimal Shape Design for the Compression Joint of Thermal Bridge Breaker using FEM (유한요소 해석을 통한 열교 차단장치의 압축판 최적형상 설계)

  • Shin, Dong-Hyeon;Kim, Young-Ho;Kim, Hyung-Joon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.2
    • /
    • pp.17-25
    • /
    • 2013
  • It is important to eliminate thermal bridge for achieving passive and environmental-friendly buildings. Structural members may frequently act as thermal bridges that become a conduit of energy. it is emphasized that thermal bridge breaker (TBB) system is necessary for blocking thermal bridge of the structural members. This TBB system has to maintain a performance to tensile and compressive stress which arises in member section in order to being realized structurally. Thus, it is composed with anchorage devices which obtain continuity with structural members inside building and rebar of cantilever balcony, and compression joint which resist compression stress occurring to TBB. Applying method of TBB's compression joint is designed to have high strength with comparatively small element section which can cover external load. This study carried out finite elements method based on compression experiment. Throughout the FEM analysis, this study provides information on finding optimal shape for compression joint of TBB which can suitably apply to current building balcony of Korea.

Effect of Bracket and H-beam Members on the Sungsoo Grand Bridge (브라켓 및 H-빔 부재가 성수대교 붕괴에 미친 영향)

  • 조효남;임종권;안중산
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.04a
    • /
    • pp.422-430
    • /
    • 1998
  • This paper presents the results of a major parametric study on the collapse cause of the Sungsoo Grand Bridge, a Gerber-type continuous truss bridge, which had collapsed just at the 15th year since opening to traffic. Among the various collapse causes such as poor design, poor welding, poor maintenance, and heavy traffic loads, this study focuses on the collapse cause assessment incorporating the effects of braket and H-beam members right below the expansion joint of the suspended truss. A local FEM analysis using fine shell elements is carrided out for the more precise estimation of stress range of the vertical pin-connected hanger whose fatigue fracture triggered the collapse of the bridge. Both the conventional S-N approach and the Ang-Munse's fatigue reliability method are used for the evaluation of the fatigue life and fatigue failure probability for the assessment based on all the available results of various field and labolatory tests. From these observations, It may be affirmatively stated that the effects of bracket and H-beam members accelerated the fatigue failure, and thus should be regarded as one of major causes that triggered the bridge collapse

  • PDF

Initial Equilibrium State Analysis of Cable Members for Preliminary Analysis of Multi-span Suspension Bridge under Dead Load (고정하중을 받는 다경간 현수교의 예비해석을 위한 케이블 부재의 초기평형상태 해석)

  • Choi, Dong-Ho;Na, Ho-Sung;Gwon, Sun-Gil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.1
    • /
    • pp.21-29
    • /
    • 2016
  • This paper proposes a method to determine the initial equilibrium state of cable members for preliminary analysis of multi-span suspension bridge under dead load. The proposed method is simpler and more practical than the previous methods used in other studies. The proposed method can be applied to three-span or multi-span suspension bridges. To verify the proposed method, an three-span model as well as four-span models such as New Millenium Bridge in Korea and Yingwuzhou Bridge in China are analyzed. In the verification results, the initial coordinates and tensions of the members calculated by the proposed method are good agreement with those in the previous study for the three-span model and those in the design data of New Millenium Bridge. In addition, the proposed method gives the initial values to keep the initial configuration of Yingwuzhou Bridge.