• Title/Summary/Keyword: bridge information modeling

Search Result 111, Processing Time 0.023 seconds

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Indexing Sectioned BIM Models for Mapping Crack with BIM 3D Model

  • Young-Soo Kim;Gyeong Chan Mun;Janghwan Kim;Sam-Hyun Chun;R. Young Chul Kim
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.16 no.1
    • /
    • pp.140-147
    • /
    • 2024
  • In Current artificial structures, we must periodically make their safety inspections. In this process, we should consider the safety of workers and the accuracy of safety checks and also consider time and cost savings for safety inspections. Additionally, in the fields of architecture and civil engineering, we are unavoidable the use of foreign commercialized BIM model tools. To address these challenges, we propose mapping crack areas and BIM 3D design drawings based on augmented reality (AR) for the safety inspection of Huge Bridges. For this purpose, we define indexing of 2D/3D drawing models, create the tabulation of all 2D/3D drawings into a database, analyze QR codes, and finally integrate with augmented reality devices. we may expect our method to improve the efficiency of safety inspections on bridge sites. Moreover, we will enable the domestics of our pure technology.

Development of IFC Standard for Securing Interoperability of BIM Data for Port Facilities (항만 BIM 데이터의 상호운용성 확보를 위한 IFC 표준 개발)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.10 no.1
    • /
    • pp.9-22
    • /
    • 2020
  • Recently, BIM has been extended to infrastructures such as roads and bridges, and the demand for BIM standard development for ports is increasing internationally. Due to the low level of utilization of classification system and drawing standards compared to other infrastructures, and the closed nature of national security facilities, ports have insufficient level of connection and sharing environment among external systems or users. In addition, since the standardization of data for port facilities is not made, it is still necessary to establish an independent DB for each system and to ensure interoperability of data between these systems since it does not have a shared environment among similar data. Therefore, the purpose of this study is to develop and verify IFC, the international standard for BIM, in order to cope with the BIM environment and to be commonly used in the design, construction, and maintenance of port facilities. To this end, we build a standard schema with port-specific Express Notation according to buildingSMART International's standard development methodology. First, domestic and international reference model standards were analyzed to derive components such as space and facilities of port facilities. Based on this, the components of the port facility were derived through the codification, categorization, and normalization process developed by the research team. This was extended based on the port BIM object classification system developed by the research team. Normalization results were verified by designers and associations. Then, IFC schema construction was based on Express-G data modeling based on IFC 4 * 2 Candidate, which is a bridge candidate standard based on IFC4 (ISO16739), and IFC 4 * 3 Draft, which is developed by buildingSMART International. The final schema was validated using the commercialized validation tool. In addition, in order to verify the structural verification of the port IFC schema, the transformation process was verified by converting the caisson model into a Part21 file. In the future, this result will not only be used as a delivery standard for port BIM products, but will also be applied as a linkage standard between systems and a common data format for port BIM platforms when BIM is used in the maintenance phase. In particular, it is expected to be used as a core standard for data exchange in the port maintenance stage.

A Road Surface Temperature Prediction Modeling for Road Weather Information System (도로기상정보체계 활성화를 위한 노면온도예측 모형 개발)

  • Yang, Chung-Heon;Park, Mun-Su;Yun, Deok-Geun
    • Journal of Korean Society of Transportation
    • /
    • v.29 no.2
    • /
    • pp.123-131
    • /
    • 2011
  • This study proposes a model for road surface temperature prediction on basis of the heat-energy balance equation between atmosphere and road surface. The overall model is consisted of two types of modules: 1) Canopy 1 is used to describe heat transfer between soil surface and atmosphere; and 2) Canopy 2 can reflect the characteristics of pavement type. Input data used in the model run is obtained from the Korea Meteorological For model validation, the observed and predicted surface temperature data are compared using data collected on MoonEui Bridge along CheongWon-Sangju Expressway, and the comparison is made on winter and other seasons separately. Analysis results show that average difference between two temperatures lies within ${\pm}2^{\circ}C$ which is considered as appropriate from a micrometeorology point of view. The model proposed in this paper can be adopted as a useful tool in practical applications for winter maintenance. This study being a fundamental research is anticipated to be a starting point for further development of robust surface road temperature prediction algorithms.

Effective Decision of the Route Alignment with Digital Terrain (수치지형모형을 이용한 효율적인 노선결정)

  • Kang, Joon-Mook;Yoon, Hee-Cheon;Lee, Hyung-Seok;Lee, Sung-Soong
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.4 no.2 s.8
    • /
    • pp.195-203
    • /
    • 1996
  • The 3-D analysis of terrain for route design and selection is being used as important basic data for effective judgement of political draft. This study is to decide efficient alignment of the entry route and design bridge by modeling, analyzing and displaying surface with digital terrain data. In this study we analyze slope, aspect, shaded-relief, line of sight and watershed on the base of DTM such as contour, TIN and grid. And we can not only esti mate end-area volume for road construction by calculating cut and fill and displaying mass-curve but also recognize the scene after execution with simulation of road and terrain. The result of this study reveals that visual effects of the 3-D terrain data are very effective for designer and decisionmaker to select and review alternative route with regard to terrain characteristics.

  • PDF

A Feasibility Study to Adopt BIM-based Infrastructure Management System (BIM기반 사회기반 시설물 유지관리 도입을 위한 경제적 타당성 분석)

  • Kim, Jeonghwan;Ji, Seung-Gu;Jeong, Taehyung;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.285-292
    • /
    • 2014
  • BIM (Building Information Modeling) is a new paradigm that includes construction life-cycle, and BIM has become mandatory regulation according to the Public Procurement Service since 2016, which accelerates its application. BIM is now expand from architectural field to infrastructure industry. Through pilot projects, BIM has been challenged with verification process. This trend has affected to maintenance and operation (M&O) phase of construction life-cycle. Advanced country has already published their research and result with feasibility study and guidelines. In this paper, we conduct the feasibility study to adopt BIM-based infrastructure management system. Bridges and tunnels were selected as application target, and benefit/cost ratio were used. The result shows that BIM-based infrastructure management system is feasible when the level of detail is more than "Medium" in bridge, and "High" in tunnel.

A study on influencing factors and revitalization of the adoption of off-site construction - Case study on the construction market of the United Kingdom - (현장외 시공 공법 채택의 영향 인자 및 활성화 방안 연구 - 영국 건설 시장 사례 연구 -)

  • Kim, Min-Koo;Brilakis, Ioannis;An, Yun-Kyu
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.33-40
    • /
    • 2015
  • Over a few decades, off-site construction (OSC) has been widely used for building and bridge constructions. OSC is a construction method that build structures at a different location than the location of use, and normally it occurs in a manufacturing plant. There are many studies on the perceived benefits of OSC, yet relatively few studies which quantitatively assess the benefits and factors affecting the decision of the use of OSC have been investigated. This study investigates the influencing factors of the use of OSC system and its revitalization solutions in the construction industry. As the research method, interview and questionnaire survey are conducted by visiting industry experts of OSC and sending a questionnaire to the OSC stakeholders including engineers, manufacturers, contractors and clients in the United Kingdom (UK). The construction industry of the UK is targeted for the study since it has a number of commons with the Korean construction industry in terms of the structure of the construction industry and current low take-up of the OSC. The survey provides the results that the reluctance of clients to use OSC is the key factor of the slow use of OSC despite of the perceived benefits of OSC. In addition, in order to revitalize OSC in the construction market, three revival recommendations are suggested based on the survey results.

Investigation of the effect of Erythrosine B on a β-amyloid (1-40) peptide using molecular modeling method

  • Lee, Juho;Kwon, Inchan;Cho, Art E.;Jang, Seung Soon
    • Proceeding of EDISON Challenge
    • /
    • 2015.03a
    • /
    • pp.14-23
    • /
    • 2015
  • Alzheimer's disease is one of the most common types of degenerative dementia. As a considerable cause of Alzheimer's disease, neurotoxic plaques composed of 39 to 42 residue-long amyloid beta($A{\beta}$) fibrils have been found in the patient's brain in large quantity. A previous study found that erythrosine B (ER), a red color food dye approved by FDA, inhibits the formation of amyloid beta fibril structures. Here, in an attempt to elucidate the inhibition mechanism, we performed molecular dynamics simulations to demonstrate the conformational change of $A{\beta}40$ induced by 2 ERs in atomistic detail. During the simulation, the ERs bound to the surfaces of both N-terminus and C-terminus regions of $A{\beta}40$ rapidly. The observed stacking of the ERs and the aromatic side chains near the N-terminus region suggests a possible inhibition mechanism in which disturbing the inter-chain stacking of PHEs destabilizes beta-sheet enriched in amyloid beta fibrils. The bound ERs block water molecules and thereby help stabilizing alpha helical structure at the main chain of C-terminus and interrupt the formation of the salt-bridge ASP23-LYS28 at the same time. Our findings can help better understanding of the current and upcoming treatment studies for Alzheimer's disease by suggesting inhibition mechanism of ER on the conformational transition of $A{\beta}40$ at the molecular level.

  • PDF

Orientation Analysis between UAV Video and Photos for 3D Measurement of Bridges (교량의 3차원 측정을 위한 UAV 비디오와 사진의 표정 분석)

  • Han, Dongyeob;Park, Jae Bong;Huh, Jungwon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.451-456
    • /
    • 2018
  • UAVs (Unmanned Aerial Vehicles) are widely used for maintenance and monitoring of facilities. It is necessary to acquire a high-resolution image for evaluating the appearance state of the facility in safety inspection. In addition, it is essential to acquire the video data in order to acquire data over a wide area rapidly. In general, since video data does not include position information, it is difficult to analyze the actual size of the inspection object quantitatively. In this study, we evaluated the utilization of 3D point cloud data of bridges using a matching between video frames and reference photos. The drones were used to acquire video and photographs. And exterior orientations of the video frames were generated through feature point matching with reference photos. Experimental results showed that the accuracy of the video frame data is similar to that of the reference photos. Furthermore, the point cloud data generated by using video frames represented the shape and size of bridges with usable accuracy. If the stability of the product is verified through the matching test of various conditions in the future, it is expected that the video-based facility modeling and inspection will be effectively conducted.

Calculation of Deflection Using the Acceleration Data for Concrete Bridges (가속도 계측 자료를 이용한 콘크리트 교량의 처짐 산정)

  • Yun, Young Koun;Ryu, Hee Joong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.92-100
    • /
    • 2011
  • This paper describes a numerical modeling for deflection calculation using the natural frequency response that is measured acceleration response for concrete bridges. In the formulation of the dynamic deflection, the change amounts and the transformed responses about six kinds of free vibration responses are defined totally. The predicted response can be obtained from the measured acceleration data without requiring the knowledge of the initial velocity and displacement information. The relationship between the predicted response and the actual deflection is derived using the mathematical modeling that is induced by the process of a acceleration test data. In this study, in order to apply the proposed response predicted model to the integration scheme of the natural frequency domain, the Fourier Fast Transform of the deflection response is separated into the frequency component of the measured data. The feasibility for field application of the proposed calculation method is tested by the mode superposition method using the PSC-I bridges superstructures under several cases of moving load and results are compared with the actually measured deflections using transducers. It has been observed that the proposed method can asses the deflection responses successfully when the measured acceleration signals include the vehicle loading state and the free vibration behavior.