• Title/Summary/Keyword: bridge girder

Search Result 1,301, Processing Time 0.03 seconds

Vibration of Steel Composite Railway Bridges under High Speed Train (고속열차하중 하의 강합성형 철도교의 진동)

  • Chang, Sung Pil;Kwark, Jong Won;Ha, Sang Gil;Kim, Sung Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.4 s.37
    • /
    • pp.577-587
    • /
    • 1998
  • The influences of high speed train on the dynamic responses of steel composite railway bridges are investigated. The bridge system which has two I-girder and several cross beams is modeled with plate and frame elements. With assumption of concrete slabs are fully connected with steel girders, the offset between slabs and girders is modeled using constraint equation. The track system is modeled using beams on elastic foundation theory. And, the TGV train model is developed in 2-dimension considering bouncing and pitching motion. And braking action of vehicle is considered using speed dependent braking function. To investigate the behavior of bridges due to moving trains, parametric studies on the variation of natural frequency of bridge, speed parameter, vehicle modeling method, braking action of train, etc are performed.

  • PDF

Experimental Study for Ultimate Behavior of Steel Cable Stayed Bridge Under Construction (실험을 통한 시공 중 강사장교의 극한거동 연구)

  • Lee, Kee Sei;Kim, Seung Jun;Choi, Jun Ho;Kang, Young Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.6
    • /
    • pp.683-692
    • /
    • 2012
  • The girders of cable stayed bridge are subjected to not only the bending moments but also additional compressive axial forces due to the horizontal components of cable forces. Because of these axial forces, the stiffness of girder can be decreased, and this problem should be considered especially for under-construction model rather than the full model. Korean domestic design specification suggests the linear elastic eigen value analysis for the stability problem of cable stayed bridges. However, this method cannot be applied to the under construction model because various geometric nonlinear characteristics cannot be considered. Therefore, in this study, 3 models which are assumed to be constructed by balanced cantilever will be considered experimentally and analytically to analyze the behavior of steel cable stayed bridges.

Establishing optimal gap size for precast beam bridges with a buffer-gap-elastomeric bearings system

  • Farag, Mousa M.N.;Mehanny, Sameh S.F.;Bakhoum, Mourad M.
    • Earthquakes and Structures
    • /
    • v.9 no.1
    • /
    • pp.195-219
    • /
    • 2015
  • A partial (hybrid) seismic isolation scheme for precast girder bridges in the form of a "buffer-gap-elastomeric bearings" system has been endorsed in the literature as an efficient seismic design system. However, no guides exist to detail an optimal gap size for different configurations. A numerical study is established herein for different scenarios according to Euro code seismic requirements in order to develop guidelines for the selection of optimal buffer-gap arrangements for various design cases. Various schemes are hence designed for ductile and limited ductility behavior of the bridge piers for different seismic demand levels. Seven real ground records are selected to perform incremental dynamic analysis of the bridges up to failure. Bridges with typical short and high piers are studied; and different values of initial gaps at piers are also investigated varying from a zero gap (i.e., fully locked) condition up to an initial gap at piers that is three quarters the gap left at abutments. Among the main conclusions is that the as-built initial gaps at piers (and especially large gap sizes that are ${\geq}1/2$ as-built gaps at abutments) do not practically reduce the seismic design demand and do not affect the reserve capacity of the bridge against failure for bridges featuring long piers, especially when these bridges are designed a priori for ductile behavior. To the contrary, the "buffer-gap-elastomeric bearings" system is more effective for the bridge schemes with short piers having a large difference between the stiffness of the bearings and that of their supporting (much stiffer) squat piers, particularly for designs with limited ductility. Such effectiveness is even amplified for the case of larger initial as-built gap sizes at piers.

Optimum Life-Cycle Cost Design of Steel Bridges (강교의 생애주기비용 최적설계)

  • Cho, Hyo-Nam;Lee, Kwang-Min;Kim, Jung-Ho;Choi, Young-Min;Bong, Youn-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.4 s.65
    • /
    • pp.341-358
    • /
    • 2003
  • This paper proposed a general formulation of Life-Cycle Cost (LCC) models and LCC effective design system models of steel bridges suitable for practical implementation. An LCC model for the optimum design of steel bridges included initial cost and direct/indirect rehabilitation costs of a steel bridge as well as repair/replacement costs, loss of contents or fatality and injury losses, road user costs, and indirect socioeconomic losses. The new road user cost model and regional socioeconomic losses model were especially considered because of the traffic network. Illustrative design examples of an actual steel box girder and an orthotropic steel deck bridge were discussed to demonstrate the LCC effectiveness of the design of steel bridges. Based on the results of the numerical investigation, the LCC-effective optimum design of steel bridges based on the proposed LCC model was found to lead to a more rational, economical, and safer design compared with the initial cost-optimum design and the conventional code-based design.

Spectra of Road Surface Roughness on Bridges of Minor Road (지방도 도로교 노면조도의 스펙트럼)

  • Chung, Tae Ju;Cha, Bong Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.757-767
    • /
    • 2016
  • The power spectral density (PSD) for the road surface roughness on the bridges of minor roads in Wonju city and Hoengseong-gun, Gangwon-do is presented. To obtain the PSD, the road surface roughness on 18 different bridges with various superstructure type and span is measured by GPS at every 10 to 30cm interval. Assuming the PSD as the stationary normal probability process with zero mean value, the PSD of measured road surface roughness is obtained by applying the Maximum Entropy Method (MEM). A simple formula in evaluating the PSD of RC slab bridge, Rahmen bridge and PSC I-girder bridge which is applicable to the dynamic response analysis of bridges considering the road surface roughness is proposed. Using the calculated PSD curves, the road surface conditions on the 18 bridges are evaluated. The statistical relationship between the PSD and the IRI is presented by applying linear regression and correlation analysis.

Investigation of the Behavior of Lateral Load Distribution of Railway PSC Girder Bridges (철도 PSC빔교의 하중횡분배 거동에 관한 고찰)

  • Jung, Chan-Mook
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.1
    • /
    • pp.422-428
    • /
    • 2011
  • This paper presents results from the theoretical analysis of the lateral load distribution for a railway bridge designed with PSC girders which is one of most popular types of bridge in Korea. Typically, 3 sets of intermediate cross beams within a span have been installed for lateral load distribution. In this paper, the effect on the lateral load distribution by the number of intermediate cross beams were examined by both simple grillage analysis and finite element method. This study showed that at least, one set of cross beams at midspan should be needed to ensure the proper load distribution. However, the effect of cross beams on the load distribution becomes not significant though more than one set of cross beams are installed. Therefore, only one set of cross beans at midspan is recommended for constructibility and economic efficiency.

Optimization of Cable Stayed Bridges Considering Initial Cable Tension and Tower Coordinates (사장교의 초기인장력과 주탑좌표를 고려한 최적설계)

  • Kim, Kyung Seung;Kim, Moon Kyum;Hwang, Hak Joo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.8 no.2
    • /
    • pp.205-213
    • /
    • 1988
  • It is not a simple task to optimize a cable stayed bridge, because it involves, in addition to the section properties, number and arrangement of cables, initial tension forces of cables, and type and height of the tower as design variables. This study deals with an optimization problem of cable stayed bridges considering initial cable forces, section properties of the girder and the tower, and coordinates of the tower. In order to avoid difficulties in dealing with numerous variables which interact mutually, separate design spaces are adopted for initial cable forces, section properties, and coordinates, respectively. Strain energy stored in the structure is used as the object function in the design of the initial cable forces, while weight of the structure is used in the design of section and coordinates. Upper and lower limits of the initial forces, allowable stresses including the effect of buckling, and lower limit of the sectional area are considered as constraints. The proposed method is applied to a fan type bridge and a harp type bridge. It is believed through comparison of the results to the previous results in the literature that the proposed method renders rational design values. It is also shown that the coordinate optimization, which is usually deleted in the optimization process, results in additional saving of materials.

  • PDF

Verified 20-car Model of High-speed Train for Dynamic Response Analysis of Railway Bridges (검증된 고속철도 차량의 20량편성 정밀모형에 의한 철도교량의 동적응답 분석)

  • 최성락;이용선;김상효;김병석
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.15 no.4
    • /
    • pp.693-702
    • /
    • 2002
  • The aim of this study is to develop a 3-dimensional dynamic analysis model, capable of considering the interaction between vehicles and bridges more accurately. The dynamic analysis model is developed with the high-speed train (KTX) and a 2-span continuous prestressed concrete box girder bridge with a double track. The 20-car model is developed using the moving vehicle model for the regular trainset. Three-dimensional frame elements are used for the bridge model. Using the developed models, a dynamic behavior analysis program is coded. The analytical results are compared with the dynamic field test results and found to be valid to yield quite accurate dynamic responses. Based on the results of this study, the hybrid model, made up of the moving vehicle model for the heaviest power car and the moving force model for the other cars, is quite simple and effective without loosing the accuracy that much. Under the coincidence condition of two trains traveling with resonance velocity in the opposite directions, it is necessary to check not only the dynamic responses of the bridge with one-way traffic but those with two- way coincidence.

Dynamic Interaction Analysis of Train-bridge Considering Rail-wheel Contact Mechanism (윤축-레일 접촉메카니즘을 고려한 열차-교량 동적상호작용 해석)

  • Min, Dong-Ju;Kwark, Jong-Won;Kim, Moon-Young
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.363-373
    • /
    • 2015
  • The purpose of this study is to develop a nonlinear algorithm for the dynamic interaction analysis of KTX trains and bridge girders with consideration of separation and flange contact phenomena between wheel and rail. For this, three interaction models between wheel-rail are implemented and compared through numerical examples. That is, the spring model and the non-jump model are briefly explained, and a nonlinear contact model is then proposed to accurately simulate interaction forces of the train-bridge system. Dynamic interaction analysis of a simply supported girder and trains is performed and the analyzed results are presented and compared for the proposed contact model and the other model types. Particularly, flange contact phenomena in the nonlinear contact model are demonstrated under a specific condition.

Influence of post-pouring joint on long-term performance of steel-concrete composite beam

  • Huang, Dunwen;Wei, Jun;Liu, Xiaochun;Zhang, Shizhuo;Chen, Tao
    • Steel and Composite Structures
    • /
    • v.28 no.1
    • /
    • pp.39-49
    • /
    • 2018
  • The concrete bridge decks are usually precast and in-situ assembled with steel girders with post-pouring joint in the construction practice of super-wide steel-concrete composite beam. But the difference of concrete age between the precast slabs and the post-pouring joint has been not yet considered for the long-term performance analysis of this kind composite beam. A simply supported precast-assembled T-shaped beam was taken as an example to analyze the long-term performance of steel-concrete composite beam with post-pouring joint. Based on the deformation coordination conditions of the old-new concrete deck and steel girder, a theoretical model for the long-term behavior of precast-assembled composite beam is proposed in this paper according to age-adjusted effective modulus method. Then, the feasibility of the proposed model is verified by the available test data from the Gilbert's composite beams. Parametric studies were preformed to evaluate the influences of the cross-sectional area ratio of the post-pouring joint to the whole bridge deck, as well as the difference of concrete age between the precast slabs and the post-pouring joint, on the long-term performance of the composite beam. The results indicate that the traditional method without considering the age difference would seriously underestimate the effect of creep and shrinkage of concrete bridge decks. The concrete age difference between the precast slabs and the post-pouring joint should be demonstrated for the life cycle design and long-term performance analysis of precast-assembled steel-concrete composite beams.