• Title/Summary/Keyword: bidding system

Search Result 229, Processing Time 0.023 seconds

A Study on the International Communication System in International Bidding (국제통신시스템 국제입찰에서의 입찰행태 분석)

  • Hong, Seung-Gee;Hwan, Ho-Yon
    • International Commerce and Information Review
    • /
    • v.7 no.2
    • /
    • pp.25-47
    • /
    • 2005
  • This study wishes to analyze that affect in purchasing decision in Telecommunication operation company's international competitive bidding. When submit a tender laying stress on international competitive bidding of the Telecommunication operation companies among specially various international competitive bidding, I wish to investigate game theory enemy by bid method through access method about bid form affecting in buyer's purchasing decision.

  • PDF

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

A Study of Process Model for Estimating Optimal Bidding Rate in the Lowest Bidding System (최저가낙찰제도의 적정 낙찰가율 산정을 위한 프로세스 모형 연구)

  • Ahn, TaeHyoun;Seo, HwaJin;Choi, GwangYeol;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.719-726
    • /
    • 2011
  • The government intensifies screening criteria for the guarantee of reasonable bidding price and the prevention of low bidding price, however, the low tender rate still becomes an issue. This study analyzed the problems of screening criteria for the guarantee of reasonable bidding price, and then derived some major issues such as the restriction of decisive factors for initial construction cost, the rate of activities over five percent of surveyed price and the restrictive review criteria of inadequate activities. To solve thess problems, this study suggests an improved process model for estimating optimal bidding rate that can select a contractor with the guarantee of reasonable bidding price.

MoCAAS: Auction Agent System Using a Collaborative Mobile Agent in Electronic Commerce

  • Lee, Kwang-Yong;Yoon, Jung-Sup;Jo, Geun-Sik
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2001.01a
    • /
    • pp.83-88
    • /
    • 2001
  • To get the items that a buyer wants in Internet auction. he must search for the items through several auction sites. When the bidding starts, he(the buyer) needs to connect to these auction sites frequently so that he can monitor the bid stats and re-bid. A reserve-price auction reduces the number of connections, but this limits the user's bidding strategy. Another problem is equity between the buyer and the seller. Both the buyer and the seller should profit together within proper limits. In this paper, we propose an auction agent system using a collaborative mobile agent and a brokering mechanism called MoCAAS (Mobile Collaborative Auction Agent System), which mediates between the buyer and the seller and executes bidding asynchronously and autonomously. This reduces connection costs. offers more intelligent bidding and solves the equity problem.

  • PDF

A Study on Effective Utilization of Historical Data of Software Companies (소프트웨어사업자 실적데이터 활용방안에 관한 연구)

  • Kim, Joong-Han
    • Journal of Information Technology Services
    • /
    • v.7 no.1
    • /
    • pp.103-116
    • /
    • 2008
  • Efficiency and objectiveness are the most critical issues in the evaluation of software projects. It is beneficial not only to software companies participated in bids, but to administrators of projects. This study attempts to find an improvement in the evaluation process by connecting the historical data of bidding companies in the software company report system with the governmental procurement system. The proposed means will eliminate unnecessary and repetitive submission step of bidding companies and provide the administrator with objective evaluation process. Also, this paper proposes an automated process for quantifying the business experience of bidding companies.

기술혁신 지향적 정부구매제도의 정책방향

  • 김태황;송종국
    • Proceedings of the Technology Innovation Conference
    • /
    • 2000.06a
    • /
    • pp.123-151
    • /
    • 2000
  • The aim of this paper is to investigate how the public procurement policy exerts an effect upon the technology innovation of the firm and to make alternative proposals how to reinforce the effect. Although the pubic procurement process based on its monopsonic idiosyncrasy implies the means to lead the firms' supply function, the present system has contributed a little to accelerate the technology innovation. In fact, the system is lacking of the evaluation capability referring to the technological computer among the bidding films. So as to reinforce the function of technology innovation of the public procurement policy, it is necessary to improve the procurement institutions, in particular bidding and contract system. Finally, the paper propose, on the on hand, to enlarge the application range of the total bidding system in order to apply more strictly the technology evaluation standards on bidding, and on the other hand, to multiply the competitive proposal and the incentive contract type.

  • PDF

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

Competitive Bidding System and Rate Design for IPP Projects (IPP 입찰평가와 도매전력요금 결정방향)

  • Rhee, C.H.;Kim, C.S.;Kwun, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.535-539
    • /
    • 1995
  • In recent years, electric industries in many countries confront with a structural change in business and socio-economic environments. Since 1984, PUC and utilities in U.S.A. have adopted or developing competitive bidding systems, and this new procurement programs prevailing and restructuring the power markets. In Korea, government and the Korea Electric Power Corporation (KEPCO) invited the private sector to build and operate two 500 MW coal plants and two 400 MW LNG plants during 2001 - 2004. The plan also specifies basic concepts and conditions for the IPP projects such that new IPPs are selected through competitive bidding system with the purchased power price based on the avoided cost. In this study, the direction, guideline and scoring methods to Korean IPP bidding system are presented. Also, as a benchmark price and rates for purchased power, the avoided cost calculation models are developed, this study may contribute for the development of private power in Korea, and improve overall economic efficiencies of whole electric power sector.

  • PDF

Demand-Side Management Monitoring System of High Efficient End-Use Appliances Considering the Demand-Side Bidding (고효율 기기의 수요자측 입찰을 고려한 수요관리 모니터링 시스템)

  • Shim, Keon-Bo;Kim, Jung-Hoon;Won, Jong-Ryul
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.68-70
    • /
    • 2003
  • This paper proposes the demand-side management(DSM) monitoring system of high efficient end-use appliances considering demand-side bidding (DSB). The effect on the market propagation of high efficient appliances by demand side bidding is analysed. Seasonal Peak demand forecasting and propagation capacity of these appliances are analysed.

  • PDF

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.