Competitive Bidding System and Rate Design for IPP Projects

IPP 입찰평가와 도매전력요금 결정방향

  • Rhee, C.H. (Korea Electrotechnology Research Institute) ;
  • Kim, C.S. (Korea Electrotechnology Research Institute) ;
  • Kwun, Y.H. (Korea Electrotechnology Research Institute)
  • Published : 1995.07.20

Abstract

In recent years, electric industries in many countries confront with a structural change in business and socio-economic environments. Since 1984, PUC and utilities in U.S.A. have adopted or developing competitive bidding systems, and this new procurement programs prevailing and restructuring the power markets. In Korea, government and the Korea Electric Power Corporation (KEPCO) invited the private sector to build and operate two 500 MW coal plants and two 400 MW LNG plants during 2001 - 2004. The plan also specifies basic concepts and conditions for the IPP projects such that new IPPs are selected through competitive bidding system with the purchased power price based on the avoided cost. In this study, the direction, guideline and scoring methods to Korean IPP bidding system are presented. Also, as a benchmark price and rates for purchased power, the avoided cost calculation models are developed, this study may contribute for the development of private power in Korea, and improve overall economic efficiencies of whole electric power sector.

Keywords