• Title/Summary/Keyword: bidding rate

Search Result 52, Processing Time 0.039 seconds

A Study of Process Model for Estimating Optimal Bidding Rate in the Lowest Bidding System (최저가낙찰제도의 적정 낙찰가율 산정을 위한 프로세스 모형 연구)

  • Ahn, TaeHyoun;Seo, HwaJin;Choi, GwangYeol;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.719-726
    • /
    • 2011
  • The government intensifies screening criteria for the guarantee of reasonable bidding price and the prevention of low bidding price, however, the low tender rate still becomes an issue. This study analyzed the problems of screening criteria for the guarantee of reasonable bidding price, and then derived some major issues such as the restriction of decisive factors for initial construction cost, the rate of activities over five percent of surveyed price and the restrictive review criteria of inadequate activities. To solve thess problems, this study suggests an improved process model for estimating optimal bidding rate that can select a contractor with the guarantee of reasonable bidding price.

Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding (공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석)

  • Lee, Jung-Woong;Yi, Sung-Wook
    • Asia-Pacific Journal of Business
    • /
    • v.13 no.1
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

Competitive Bidding System and Rate Design for IPP Projects (IPP 입찰평가와 도매전력요금 결정방향)

  • Rhee, C.H.;Kim, C.S.;Kwun, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.535-539
    • /
    • 1995
  • In recent years, electric industries in many countries confront with a structural change in business and socio-economic environments. Since 1984, PUC and utilities in U.S.A. have adopted or developing competitive bidding systems, and this new procurement programs prevailing and restructuring the power markets. In Korea, government and the Korea Electric Power Corporation (KEPCO) invited the private sector to build and operate two 500 MW coal plants and two 400 MW LNG plants during 2001 - 2004. The plan also specifies basic concepts and conditions for the IPP projects such that new IPPs are selected through competitive bidding system with the purchased power price based on the avoided cost. In this study, the direction, guideline and scoring methods to Korean IPP bidding system are presented. Also, as a benchmark price and rates for purchased power, the avoided cost calculation models are developed, this study may contribute for the development of private power in Korea, and improve overall economic efficiencies of whole electric power sector.

  • PDF

A Real Time Bidding Agent System Applying fuzzy-Based Bid Limit (퍼지-기반 낙폭 제한을 적용한 실시간 입찰 에이전트 시스템)

  • 임준식
    • Journal of Internet Computing and Services
    • /
    • v.2 no.2
    • /
    • pp.95-103
    • /
    • 2001
  • This paper implements the desirable-bid price type bidding agent system that enables internet bidding between buyer and sellers efficiently in real Time. The agent system controls the bid-limit to approach successful desirable-bid price of a buyer. to reduce unsuccessful bid rate using fuzzy-based bid-limit inference method.

  • PDF

THE PRICE OF RISK IN CONSTRUCTION PROJECTS: CONTINGENCY APPROXIMATION MODEL (CAM)

  • S. Laryea;E. Badu;I. K. Dontwi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.106-118
    • /
    • 2007
  • Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and also help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

  • PDF

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

Analysis on Procurement Auction System in Public Procurement Service (공공투자사업의 입·낙찰 분석)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.144-170
    • /
    • 2010
  • This paper considers the effect of various types of procurement auction system on competition focusing on the rate of successful bidding. We analyze the number of bidders and the rate of successful bids using online procurement data of the Public Procurement Service. The average number of bidders is 301 and the average rate of successful bids is 87.42% while the weighted average rate is 75.13%. These numbers show that there is quite strong competition among bidders and the rate is lower as the expected price is higher. When we analyze the data of price procurement auction, the rate is also shown to be lower as the expected price is higher. Furthermore, the rate decreases as the number of bidders increases which naturally makes the competition stronger. Meanwhile, the analysis finds that the inclusion of the onsite bidding, the PQ(Pre-Qualification) result, or major-10 winning companies cannot explain the rate much in our data. In case of turnkey-alternative, the average rate of successful bidding for 484 cases record 90.20%. The average is 84.89% with 120 alternatives and 91.97% with 364 cases of turnkey. The reason why the rate of turnkey-alternative is lower than that of price procurement auction is the lack of competition as well as the systematic difference. By setting up a model, we are able to explain the difference in rate caused by the respective reason. When we suppose there are 3 bidders in case of price procurement auction for a project that exceeds 100 billion won, the rate is expected to be around 64%. This implies that difference of 26% is caused by the systemic difference and 3% by the lack of competition. Therefore, we conclude that the difference in rate between turnkey-alternative and price procurement auction is caused mainly by the systemic difference. In case of PPP(Public Private Partnership) projects, among 154 projects in total, only 40% has more than 2 bidders that compete. The average number of bidders is 1.88 which is less than 2, and the average rate of successful bids is 90%. In sum, under the price procurement auction, there is strong competition which is reflected by the rate of successful bids. However, there is room to decrease the rate by strengthening the competition under the turnkey-alternative. Also with PPP projects, we expect the rate can be steadily reduced with revived competition among bidders.

  • PDF

Multi-Stage Generation Allocation Game Considering Ramp-rate Constraints (경쟁적 전력시장에서 발전기 증감발률을 고려한 다중시간 발전량 배분 게임)

  • Park, Yong-Gi;Park, Jong-Bae;Roh, Jae-Hyung;Kim, Hyeong-Jung;Shin, Jung-Rin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.509-516
    • /
    • 2011
  • This paper studies a novel method to find the profit-maximizing Nash Equilibriums in allocating generation quantities with consideration of ramp-rates under competitive market environment. Each GenCo in a market participates in a game to maximize its profit through competitions and play a game with bidding strategies. In order to find the Nash equilibriums it is necessary to search the feasible combinations of GenCos' strategies which satisfy every participant's profit and no one wants various constraints. During the procedure to find Nash equilibriums, the payoff matrix can be simplified as eliminating the dominated strategies. in each time interval. Because of the ramp-rate, generator's physically or technically limits to increase or decrease outputs in its range, it can restrict the number of bidding strategies of each generator at the next stage. So in this paper, we found the Nash Equilibriums for multi-stage generation allocation game considering the ramp-rate limits of generators. In the case studies, we analyzed the generation allocation game for a 12-hour multi-stage and compared it with the results of dynamic economic dispatch. Both of the two cases were considered generator's ramp-rate effects.

An Understanding of Domestic Construction Clients' Tender Behavior (투찰률을 통한 국내 건설업체들의 입찰행태에 대한 이해)

  • Bae, Juhyeon;Han, SangUk;Kim, Byungi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.74-79
    • /
    • 2018
  • The establishment of an effective bidding system is critical to ensure both the high quality of civil infrastructure and proper earning of contractors. However, the continuous changes of a bidding system in South Korea reveal that problems such as a dumping or high price winning have not been fully resolved yet. This study thus aims at understanding the bidding behavior and strategies of contractors by analyzing a tender ratio in historical data. Multiple regression analysis is conducted to understand the effect of internal and external factors (e.g., estimated cost, combined value of construction performance evaluation) on a tender ratio. The results statistically show that such factors affect the tender ratio an individual bidder determines and have the varying effect on the tender ratio by contractors' firm size.

The Appropriation and The Use Scheme of Safety Control Cost for Reducing Severity Rate of Injury on Construction (건설재해 강도율 감소를 위한 안전관리비의 책정 및 사용방안)

  • Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.383-390
    • /
    • 2008
  • Construction safety control system had improved constantly but the severity rate of injury don't reduced, safety level of construction don't progressed as usual. In order to reduce of the severity rate of injury safety control in site is important but it needs to improve form of system that introduce obligation of safety design and design safety appraisement, an effect use method of safety control cost. The safety control cost is problem that reduce than design cost accordance bidding rate and use a little safety facility cost compare with labor cost. This study tried reduce the severity rate of injury by propose effective improvement scheme through relevant problem analysis to the safety control cost and remove caution that the severity rate of injury don't reduced.