• Title/Summary/Keyword: bidding process

Search Result 119, Processing Time 0.019 seconds

A Study on e-Commerce of custom machined Parts with a Data Exchanged format based on XML (기계가공 파트의 전자거래를 위한 XML 기반의 데이터 교환에 관한 연구)

  • Ok-Hyun Ryou;Seong-Ho Noh;Jae-Kwang Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.4
    • /
    • pp.53-68
    • /
    • 2003
  • Currently, it is possible to buy almost anything from books(Amazon.com) to airplane tickets(Travelocity.com) using the world wide web. The purpose of this research is to develop a "clean interface" between design and fabrication facilities for the production of custom machined parts through Internet. The current mechanism for production of prototype parts that can be fabricated using standard machine tools like milling machines, requires a process of part description preparation, bidding, contract award, and finally fabrication and delivery of the part. This is a substantially more complex process than buying a book or airplane ticket. In this paper, we try to define the ambiguous part description using XML based data exchange format and to enable e-commerce in this field. The research accomplishments are summarized: 1. Creation of a new format for data exchange of machined prototype parts, 2. Development of a prototype system to illustrate how the XML data can be effectively used to conduct e-Commerce for custom machined parts, 3. Testing of the methodology with a number of parts.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Analysis on Demand Response Aggregator in Electricity Market (수요관리사업자가 수요반응 전력시장에 미치는 영향 분석)

  • Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1181-1186
    • /
    • 2017
  • The purpose of Demand Response is to reduce the cost of excessive resources and equipment by spontaneous load reductions at peak loads. Having enough power consumers participating in these schemes is key to achieving the goal. Demand Response Aggregator (DRA) is responsible for recruiting demand resources and managing them to participate in reducing the load. DRAs change the price elasticity of demand functions by providing incentives to demand response, thereby affecting price formation in the electricity market. In this paper, this process is modeled to analyze the relationship between DRA's strategic bidding and market outcomes and load reductions. It analyzes the results by applying to competition between DRAs, competition between DR and Gencos, and coexistence of DR load and non-DR load. It is noteworthy that we have found a phenomenon called the Balloon Effect.

Development of a Multi-Layered Workflow Management System for Product Development Processes (제품 개발 프로세스 관리를 위한 다층 통합 워크플로우 시스템 개발)

  • 강석호;김영호;김동수;배준수;배혜림
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.187-201
    • /
    • 1999
  • In this paper, we propose a multi-layered architecture of workflow management systems based on CORBA (Common Object Request Broker Architecture). The system aims to support product development processes in distributed environment. Many companies have started to adopt workflow management systems to manage and support their business processes. However, there are many problems in direct application of those systems to product development environments. These mainly resulted from the dynamic features of product development processes. It is strongly required to support dynamic processes as well as static and procedural ones in an integrated and consistent manner. To meet these requirements, a basic workflow management system has been developed as the core component of the integrated architecture. This performs the basic functions of workflow management system. Second, a dynamic workflow management system based on a bidding mechanism has been developed to manage processes that cannot be easily defined or are likely to be modified, Finally, an SGML workflow management system, which is the third layer in the architecture, has been developed to manage documents processing workflows by integration SGML documents contents and process information into the structured SGML document.

  • PDF

Transforming Inter-Organizational Information Systems into Electronic Commerce Marketplaces: Development of B2B Electronic Commerce in China's Pharmaceutical Industry

  • Li Mingzhi;Tu Yulin;Wang Xiaochen;Reimers Kai
    • Management Science and Financial Engineering
    • /
    • v.11 no.3
    • /
    • pp.61-78
    • /
    • 2005
  • The aim of this paper is to identify the barriers to the B2B e-commerce development in China's pharmaceutical industry and to devise an effective strategy for its future development. Built on a detailed investigation of the market structure and recent development of electronic commerce in China's pharmaceutical industry, this paper proposes that the key issue in the development of effective B2B e-commerce business models is the successful transformation of the inter- organizational information systems into electronic marketplaces. In order to ensure the success of such electronic marketplaces, a government driven approach will be needed. In the process, designing an incentive compatible mechanism of coordinating the interest of all the market players will be the prerequisite.

A Nash Bargaining Solution of Electric Power Transactions Reflecting Transmission Pricing in the Competitive Electricity Market (송전선이용료를 반영한 전력거래의 내쉬협상게임 해법)

  • Gang, Dong-Ju;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.7
    • /
    • pp.311-316
    • /
    • 2002
  • It has been a basic model for the present electric power industry that more than two generators compete, and thereby the market clearing price and the generation schedules are determined through the bid process. In order for this paradigm to be applicable to real electric power systems and markets, it is necessary to reflect many physical and economic constraints related to frequency and transmission in the dispatching schedule. The paper presents an approach to deriving a Nash bargaining solution in a competitive electricity market where multiple generators are playing with the system operator who mitigates the transmission congestion to minimize the total transaction cost. In this study, we take the effect of the line flows and the role of system operator into the Game. Finally, a case study has been demonstrated to verify the proposed cooperative game.

A Critical Review on Japan's Offshore Wind Bidding System (일본의 해상풍력 입찰제도에 관한 비판적 고찰)

  • Son Bumsuk
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.70-77
    • /
    • 2024
  • This study examines the issues regarding the selection competition process of offshore wind power operators conducted in Japan in 2020. It also explores the implications of the findings on the legal system of Korea for the introduction of offshore wind power in the future. Drawing on Japan's example, Korea must reconsider the importance of the price aspect when introducing offshore wind power and adopt policies that prioritize balanced industrial development and focus on regional and domestic economic ripple effects.

BIM IMPLEMENTATION STRATEGY AND TASKS FOR ARCHITECTURAL INDUSTRY IN KOREA

  • Ki Byung Yoon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.88-92
    • /
    • 2011
  • Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.

  • PDF

Analysis and Modeling of Hosting Process in International Sports Events (국제스포츠이벤트의 유치 프로세스 분석 및 모델링)

  • Kim, Joo-Hak;Cho, Sun-mi
    • 한국체육학회지인문사회과학편
    • /
    • v.55 no.1
    • /
    • pp.441-455
    • /
    • 2016
  • International sports events is one of the core products in the sports industry. The increasing number of nations are bidding to host the international sports event such as Olympics Game because of expecting to development of a city or nation. Hosting a international sports events are inter-connected and affected by system of socials, politics, cultures and economics. As the scale of the international sports events became larger, sports events process importance is growing. The purpose of this study was build a model of the sports event process in the attract steps. By analyzing event process in the attract steps, the core processes(1. Search, 2. Applications, 3. Practice, 4. Follow-up management) was set and stakeholders and function were analyzed. The modeling was used as IDEF method.

Development of Safety Management Index for Contractor Assessment in Bidding Process (입찰단계 수급자 평가를 위한 안전경영지수 개발)

  • Ji, Soung-Min;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.3-13
    • /
    • 2011
  • The construction industry is still the most risky industry and labor accident is a significant management factor on construction site. Safety management has been studied for improving the safety performance on construction sites. However, Almost all of them have been considered on the site safety management for the contractors and evaluation of accident rate. To resolve the limitation of current research, this study is focused on considering accident result and effort by performing the evaluation of safety level of the head office and site in construction companies. By studying the research about a safety management and interviewing with specialists in safety management, 7 items were selected and weighted based on the KOSHA18001 List. Consequently, The checklist was developed to evaluate safety performance management in construction company and Safety Management Index was suggested to coordinate 1) the score of results in accident rate and 2) the effort to evaluate a safety performance management. Safety Management Index is more helpful to evaluate the safety management results and effort. As a result of considering the score of the accident rate and the safety performance management, the outcome of prequalification was changed. Using this index, contractors will attempt to prevent accidents and owners will be able to discriminate individual differences in bidding process.