• Title/Summary/Keyword: bidding

Search Result 488, Processing Time 0.02 seconds

미국 주파수 경매의 경제학적 특성

  • Yun Chung-Han
    • The Proceeding of the Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.17 no.3 s.59
    • /
    • pp.63-73
    • /
    • 2006
  • Auctions have been traditionally used to find the current price of goods when little is known about their true value. A special auction methodology, called a 'simultaneous multiple round auction', is available to auction radiofrequency spectrum where all lots are simultaneously on of for over multiple rounds of bidding. This type of auction is especially useful when there are lots that are of essentially equal value and substitutable, except that different bidders may prefer different combinations of lots. By using multiple rounds, a bidder has the opportunity to gather information concerning the value of individual lots and can change strategy by shifting the bidding to another preferred combination if one combination becomes too expensive. Information is released in three main ways during an auction: Bidder Status; High Bids; and Bandwidth Value.

An Improvement Scheme of Direct Load Control Program for Electric Power Demand Management (합리적 전력수요관리를 위한 직접부하제어 사업의 개선 방안)

  • Kim, Kyu-Ho;Choi, Seung-Kil;Song, Kyung-Bin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.8
    • /
    • pp.81-86
    • /
    • 2007
  • This paper proposes the scheme to improve the current direct load control(DLC) program by inspecting the problems of the DLC program. In order to increase the number of the customers participating DLC program, a reduction of the base incentive and an increase of the direct load control incentive are suggested based on the interruption cost of electric power considering the characteristics of load types and the introduction of demand side bidding is recommended. Secondly, the standards of power system operations is required to control DLC program efficiently for the penalty, interruption times, the number of interrupting loads, notice time for the load interruption and the periods of the DLC program contract.

A Study on Collusion Effects for Bid Award in Public Construction Works (공공 건설공사 담합이 낙찰에 미치는 영향 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.12-20
    • /
    • 2020
  • To estimate collusion effects on bid award in Public Construction works, this paper uses Logit Model, which is a choice variable model. Price, design, competition, and other factors are included, with a special focus on collusion, as independent variables in the model. The empirical results are as follows. First, collusion has little effects on bid award, but great impacts on bidding behavior. Secondly, the score of design is the most important and significant factors among all variables. Thirdly, competition has also significant effects on bid award. Finally it is analyzed that institutional framework and characteristics of public work have some effects on bidding award.

Design and Implementation of a realtime Auction System using information providing agent (정보 제공 에이전트를 이용한 실시간 경매 시스템 설계 및 구현)

  • 최옥경;한상용
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.2
    • /
    • pp.87-99
    • /
    • 2001
  • Along with the rapid emergence of the Internet and e-commerce, online auctions are hitting the spotlights. The inconveniences found in off-line auctions, such as time and place restriction and limited number of items, are solved in the online auction. However, not so many auction sites have integrated auction information systems, which monitor the present status of auctions, resulting in greater inconvenience for the online auction users. Moreover, there is no auction site that suggests the appropriate starting or closing price that is useful for users when they make, their bids, What the online auction users need is an auction system that can solve such problems. This study is purported for solving the problems by designing and implementing a real time auction system that applies the comparison search functions and the agent functions. In other words, an integrated database system using a bidder-oriented agent for providing information is built so that the users can search and compare the information on the item they are interested in and make a faster and more accurate purchase. Also the appropriate starting and closing prices are offered to the sellers and bidders through the integrated system for a closer and more accurate comparison and analysis of the prices. For future work, the product recommendation service, which accurately reflects the bidding patterns, and the methods for studying the multi bidding pattern will be applied to the suggested system to realize a real time auction information system that supports CRM(Customer Relationship Management) .

  • PDF

Exploratory Study of International Sports Event Life Cycle (복합종목 국제스포츠이벤트 생애주기에 대한 탐색적 연구)

  • Kwon, Kisung;Oh, Taeyeon
    • Journal of Sport and Applied Science
    • /
    • v.3 no.1
    • /
    • pp.1-14
    • /
    • 2019
  • Numerous types of sporting events have been hosted in Korea during the last decades. Sport events produce various types of data, and there is a clear necessity of storing and utilizing this information. From this background, the purpose of this study is to draw complex sports categories from international sport events life cycles in order to categorize standards of knowledges management system. This study utilized qualitative methods: expert groups discussion for overall life cycle steps and in-depth interviews for detail life cycle steps. The results show that there are several life cycle steps: bidding, preparation, operation, evaluation, post management steps. To be more specific, for the bidding step, there are check, plan, implementing detail phase; and the preparation step is based on event preparation Basis Build, event preparation implementation, test and supplementation phases. For the operation step, event operation system switch, event operation during the period, finish operation phases are deducted. Evaluation and post management step do not have detail phases. Efforts to store and utilize knowledge can be one of the starting points to make the operation of sport events efficiently.

A Study on the Optimization plan for Standardization of Engineering Drawing (설계도면 작성기준 최적화 방안에 관한 연구)

  • Kim, Suk-Su;Song, Jae-ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

An Enhanced Operating Scheme of Evaluation System for Construction Works -Focused on the KNHC System (시공평가제도의 효과적 운영방안 -대한주택공사 제도를 중심으로)

  • Choi Jin-Woo;Jung Sang-Bong;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-284
    • /
    • 2001
  • The owner's evaluation system about the contractor's work performance is used to give the contractor some advantages or disadvantages. According to the result of evaluation of the contractor's performance in the given construction project, the owner identify the good contractors and give them some merits in the future project bidding. However, the system used in the Korean construction industry has caused many problems and has been operated improperly. As a case study, this paper investigates the current problems existed in the KNHC (Korean National Housing Corporation) evaluation system and suggests some directions for its efficient operation. In doing so, the study performed interviews with the KNHC officers and the related contractors, using a structured questionnaire

  • PDF

Optimal Bidding Strategy of Competitive Generators under Price Based Pool (PBP(Price Based Pool) 발전경쟁시장에서의 최적입찰전략수립)

  • Kang, Dong-Joo;Moon, Young-Hwan;Oh, Tae-Kyoo;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.57-59
    • /
    • 2001
  • The restructuring of power industry is still going on all over the world for last several decades. Many kinds of restructuring model has been studied, proposed, and applied. Among those models, power pool is more popular than others. This paper assumes the power pool market structure having competitive generation sector and a new method is presented to build bidding strategy in that market. The utilities participating in the market have the perfect information on their cost and price functions, but they don't know the strategy to be chosen by others. To define one's strategy as a vector, we make utility's cost/price function into discrete step function. An utility knows only his own strategy, so he estimates the other's strategy using stochastic methods. For considering these conditions, we introduce the Bayesian rules and noncooperative game theory concepts. Also additional assumptions are included for simplification of solving process. Each utility builds the strategy to maximize his own expected profit function using noncooperative Bayesian game. A numerical example is given in case study to show essential features of this approach.

  • PDF

Multi-Stage Generation Allocation Game Considering Ramp-rate Constraints (경쟁적 전력시장에서 발전기 증감발률을 고려한 다중시간 발전량 배분 게임)

  • Park, Yong-Gi;Park, Jong-Bae;Roh, Jae-Hyung;Kim, Hyeong-Jung;Shin, Jung-Rin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.509-516
    • /
    • 2011
  • This paper studies a novel method to find the profit-maximizing Nash Equilibriums in allocating generation quantities with consideration of ramp-rates under competitive market environment. Each GenCo in a market participates in a game to maximize its profit through competitions and play a game with bidding strategies. In order to find the Nash equilibriums it is necessary to search the feasible combinations of GenCos' strategies which satisfy every participant's profit and no one wants various constraints. During the procedure to find Nash equilibriums, the payoff matrix can be simplified as eliminating the dominated strategies. in each time interval. Because of the ramp-rate, generator's physically or technically limits to increase or decrease outputs in its range, it can restrict the number of bidding strategies of each generator at the next stage. So in this paper, we found the Nash Equilibriums for multi-stage generation allocation game considering the ramp-rate limits of generators. In the case studies, we analyzed the generation allocation game for a 12-hour multi-stage and compared it with the results of dynamic economic dispatch. Both of the two cases were considered generator's ramp-rate effects.

A Priority Analysis on Influential Factors for Software Bid Evaluation in Public Sectors based on Analytic Hierarchy Process(AHP) (AHP 기법을 활용한 소프트웨어 제안평가요인의 상대적 중요도에 관한 연구 : 발주자와 수주자 비교를 중심으로)

  • Kim, Hong Jin;Jo, Dong Hyuk;Ahn, Tae Ho
    • Journal of Information Technology Services
    • /
    • v.16 no.1
    • /
    • pp.41-53
    • /
    • 2017
  • Recently, due to the economic recession and increase of ITO (IT Outsourcing), bidding in software industry has been recognized as more competitive and the importance of software bid evaluation for corporate selection is being increased. This study aims to analyze and prioritize influential factors in the software bid evaluation criteria which is adopted as the main evaluation model of national software businesses by Ministry of Science. The priority was developed by AHP (Analytic Hierarchy Process) through pair-wise comparison. For the analysis, this study developed analysis model for AHP and conducted survey of experts who have work experience for more than 10 years in the IT industry. As the result of analysis, weighted factors in the evaluation criteria were deduced and differences of priority factors between purchaser and bidder were investigated. The analysis showed differences of view point in the bidding process. With these results, this study suggests how to write a proposal strategically and effectively in perspective of the purchaser. It is expected that priority factors will be adopted in strategic proposals in both bidder and purchaser. For purchaser, the priority will be adopted to select reliable bidder. So, we expect that the priority factors will be used to get more values for both bidder and purchaser in their business atmosphere.