Browse > Article
http://dx.doi.org/10.6106/KJCEM.2020.21.1.012

A Study on Collusion Effects for Bid Award in Public Construction Works  

Kim, Myeongsoo (Department of Economics, The Catholic University of Korea)
Publication Information
Korean Journal of Construction Engineering and Management / v.21, no.1, 2020 , pp. 12-20 More about this Journal
Abstract
To estimate collusion effects on bid award in Public Construction works, this paper uses Logit Model, which is a choice variable model. Price, design, competition, and other factors are included, with a special focus on collusion, as independent variables in the model. The empirical results are as follows. First, collusion has little effects on bid award, but great impacts on bidding behavior. Secondly, the score of design is the most important and significant factors among all variables. Thirdly, competition has also significant effects on bid award. Finally it is analyzed that institutional framework and characteristics of public work have some effects on bidding award.
Keywords
Factors for Successful Bid; Collusion; Bid Price; Design Score; Choice Variable Model;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Bae, J.H., Han, S.W., and Kim, B.I. (2018). "An Understanding of Domestic Construction Clients' Tender Behavior." Korean Journal of Construction Engineering and Management, KICEM, 19(1), pp. 74-79.   DOI
2 Choi, M.S., Kim, M.S., and Shin, D.Y. (2019). "An Econometric Approach for Estimating Collusion Effects in Bid Rigging in Public Construction Works." Korean Journal of Public Finance, 12(2), pp. 93-126.
3 Jung, J.H. (2017). "A Study on Economic Characteristics of Public Work's Bidding." Construction Association of Korea.
4 Kim, J., and Park, S.W. (2005). "Competition and efficiency in government procurement." Korea Institute of Public Finance.
5 Kim, J.W. (2017). "Analysis on Determinants of Winner in Public Procurement Auction." Korean Journal of Law and Economics, 14(2), pp. 245-266.
6 Kim, M.S. (2017). "An Analysis on Evaluation of Construction Technology Value for Supporting Mid-small Construction Enterprises Pursuing Technical Innovation." Korean Journal of Construction Engineering and Management, KICEM, 18(4), pp. 27-35.   DOI
7 Lee, B.N., and Jang, C.K. (2005). "The Effects of Number of Bidders on Bid-Award." Construction and Economy Research Institute of Korea.
8 Lee, H.S. (2018). "Setting up a Reasonable Model and Selecting Variables to Estimate the Amount of Compensation for Collusion in Public Works." Construction Association of Korea.
9 Lee, I.H. (2017). "A Study on Estimation of the Amount of Compensation for Collusion in Public Works." Construction Association of Korea.
10 Lee, S.H., and Lee, S.W. (2004). "The Performance of Lowest Bid System and Future Task." Construction and Economy Research Institute of Korea.
11 Min, B.W., and Park, H.G. (2018). "A Study on Method for Damage Calculation Caused by Bid Rigging in Alternative Tenders for Construction Projects - Utilizing the Difference of the Design Score & Bidding Rate as Factor." Journal of the Korean society of civil Engineers, 38(5), pp. 741-749.   DOI
12 Park, M.S., Lee, L.H., Hong, D.P., and Lee, S.H. (2017). "Estimating Bid Rigging Overcharges in Public Works." The Korean Journal of Industrial Organization, 25(3), pp. 75-109.   DOI
13 Ryu., K.K., and Oh, S.A. (2010). "Antitrust Damage Estimation in Multiple Bid-Rigging Cases." Korea Review of Applied Economics, 12(2), pp. 87-112.
14 Yang, J.Y., Choi, M.S., Kim, M.O., and Ko, J.S. (2017). "An analysis of the residentss satisfaction of open school sport center and its determinants: Using tobit regression model." Korean Journal of Sport Science, 28(4), pp. 917-931.   DOI
15 Kim, J.W. (2010). "Analysis on Procurement Auction System in Public Procurement Service." KDI Journal of Economic Policy, 32(2), pp. 144-170.   DOI