• Title/Summary/Keyword: bid evaluation

Search Result 73, Processing Time 0.034 seconds

The Development of Life Cycle Cost Evaluation Index for Public Facilities (공공시설물의 생애주기비용 평가기준 개발)

  • Kim, Tae-Hui;Gu, Bon-Hak;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.216-224
    • /
    • 2008
  • Recently, most developed countries use the evaluation system about Life Cycle Cost(LCC), and KOREA is beginning to introduce the system to reduce construction expenses. And the introduction of "Technical Proposal Type Bid", which is a new procurement method of Korea government, has made needs for the price-valuation way to evaluate facilities LCC. These days, LCC has been being evaluated by BTL and turnkey project in KOREA, which is suffering from difficulties in evaluating it, because evaluation elements and standards are vague. In addition, LCC evaluation in public construction business except BTL and turnkey is not carried out. Therefore, this paper is to develop a new evaluation index to evaluate LCC both systematically and objectively. The results of this paper are as followings. (1) Necessity and problem analysis of LCC evaluation index, (2) LCC evaluation index deduction from the technical report and question analysis, (3) Application and evaluation method suggestion to practice.

A Study on User's Value Consciousness toward Products and Patterns of Design Evaluation (제품에 대한 사용자의 가치의식에 따른 디자인 평가의 유형에 관한 연구)

  • Shong, Chang-Ho;Choi, Myoung-Sik
    • Archives of design research
    • /
    • v.19 no.5 s.67
    • /
    • pp.255-268
    • /
    • 2006
  • This study raised a question about 'how user's psychological value consciousness influences design evaluation and evaluated 14 product samples. Three main categories were chosen to be analyzed; product evaluation by step, value consciousness toward products, and creation of shape image and design evaluation. In order to obtain results, four research hypotheses were established a and case study was conducted as part of 'conclusive research' for verification. 120 university students in their 20s majoring in product design were chosen as testees in a bid to increase the accuracy of data. With data collected, the whole flow was analyzed by simple tabulation and further analysis was carried out in three evaluation items. An analysis method was mainly quantitative, focusing on multivariate analysis like factor analysis, cluster analysis, etc. The empirical analysis of this study was verified at P<.05 significance level and SPSSWIN 12.0 program was used for statistic process. As a result, four conclusions were gained regarding 'user's value consciousness toward products and pattern of design evaluation'.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Development of ITB Risk Mgt. Model Based on AI in Bidding Phase for Oversea EPC Projects (플랜트 EPC 해외 사업을 위한 입찰단계 시 AI 기반의 ITB Risk 관리 모델 개발)

  • Lee, Don-Hee;Yoon, Gun-Ho;Kim, Jeong-Joon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.4
    • /
    • pp.151-160
    • /
    • 2019
  • EPC companies to continue operating overseas, it is increasingly becoming apparent that risk is no longer something to be avoided but a subject to be managed. During the bidding stage, the requirements, specifications and project line items within the bid package must be studied in details to analyze the various risk factors in order to avoid cost overruns. However, reviewing vast quantities of bidding documents is time consuming and labor intensive and is not an easy task and this is where automated information technology can help. For this study, I have constructed an ITB analysis model based on Watson AI that can analyze and apply vast amount of documents more effectively in a short time. Configuration of the Watson Explorer AI architecture for AI-based ITB risk management model research, the selection of learning procedures and analysis subjects, and the performance evaluation criteria were defined, and a test bed was constructed to conduct a pilot research. Consequently, I verified the effectiveness of the analytical time reduction and the quality of its results and VOC operations by professionals.

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.

Safety evaluation of tilting train on circular curve (틸팅열차의 원곡선부 주행시 안전성 평가)

  • Kim, Sang-Soo;Eum, Ki-Young;Bae, Jae-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1703-1712
    • /
    • 2010
  • The safety of tilting train running on curved track is, in general, evaluated with a derailment coefficient calculated by the ratio of wheel load and lateral force, Particularly on curve, the wheel load and lateral force on rail may cause trackbed to be deformed, depending on their intensity, and moreover, often result in critical accident such as derailment. This study hence was intended to identify the cause of wheel load and lateral force so as to suggest the allowable wheel load reduction rate, lateral force limit and derailment coefficient, thereby quantitatively evaluating the operational safety of tilting train. This study therefore was aimed to analyze the wheel load and lateral force occurred during tilting train's operation on circular curve in such a way of comparing with traditional trains, by axle and speed, in a bid to eventually evaluate the operational safety of tilting train.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

Groping of a New Evaluation Method using the Knowledge State Analysis in the Selective Examination of Scientifical Gifted (과학영재 선발시험에서 지식상태 분석법을 통한 새로운 평가 방법 모색)

  • Park, Sang-Tae;Byun, Du-Won;Yuk, Keun-Cheol;Jung, Jum-Soon
    • Journal of Gifted/Talented Education
    • /
    • v.15 no.1
    • /
    • pp.37-48
    • /
    • 2005
  • Comparing to the other subject, the relationship among physics contents is strong from the perspective of knowledge order as grades go up. That is, The things already that students learned, are learning and will learn are closed related from grade to grade. We expect students to be proactive and creative in studying physics, which is the goal of 21th century, analyzing their knowledge structure based on the knowledge order through assessment. Especially, using computer system, we provide students with substantial feedback for the assessment as well as objective validity is increased along with speedy and exact process in a bid to help students' mathematical understanding grow. This paper seeks to analyze the data from assessment applying knowledge spaces of the scientifical gifted in selective examination and to applicate on development of evaluation method.

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF