A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

A Study on the Safety Plan for Usage of the Construction Field Work Plate (건설현장 작업발판의 안전 사용방안에 관한 연구)

  • Go, Seong-Seok;Yeo, Sang-Ku;Choi, Don-Hoeng
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.3
    • /
    • pp.34-42
    • /
    • 2011
  • Death disaster among the disasters in construction field is mainly occurred by crash, and the work plate is the main objects causing crash. This study was performed by interview with workers in construction field to evaluate the consciousness on safety and to analyze the type of use and the state. Finally the problems while using work plate were appeared with its requirements for the improved use. Based on the results from this study, amendments were proposed for some parts of regulation related, and further four types of development on the safe work plate were presented. It is expected that the safer construction environment could be composed by using the results.

A Study on the Defects of Exposed Concrete Finishing Work Using AHP (AHP기법을 활용한 노출콘크리트 마감공법 하자 도출)

  • Choi, Seongmi;Song, Yeongwoong;Lee, Kiseok;Yoo, Seonghoon;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.46-55
    • /
    • 2019
  • The exposed concrete has been widely used in building construction. Therefore, many researches are presented to secure a proper construction quality of exposed concrete. Low quality and management absence, however, still remained in construction fields. Thus, many studies have been conducted to improve the quality, but defects still occur in the exposed concrete finishing work. In this study, the causes of defects were analyzed by process in order to prevent the generation of defects and to enhance the need for integrated management to secure quality. In addition, a case study and AHP analysis have derived the importance of defects occurring in the exposed concrete finishing work. The study concluded that the occurrence of the exposed concrete finishing work needs to be managed throughout the process, not the management limited by one process, according to the causes of the existing defects, and integrated management is required to prevent defects and improve quality of exposed concrete finishing work.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers (건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su;Yi, Dong-Ryul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.12
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.