• Title/Summary/Keyword: apartment concrete work

Search Result 40, Processing Time 0.026 seconds

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

A Study on the Sound Insulation Performance Elevation of Floor Structure that use Rubber chip in Apartment House (고무칩을 이용한 공동주택 바닥구조의 차음성능 향상에 관한 연구)

  • 박명길;함진식
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.237-332
    • /
    • 2002
  • We constructed ceiling structure and floor structure for elevation of sound insulation performance of concrete slab of apartment house. And, we wished to measure heavy floor impact sound level and light floor impact sound level of these structure. As the result, light floor impact sound level interception performance of concrete slab was measured by thing that construction work of gypsum baud is important. Heavy floor impact sound level interception performance was measured by thing that it is effective that construct to thickness about 30 millimeters on concrete Slav. It was measured effectively that heavy floor impact sound level interception performance constructs rubber chip to thickness about 30 millimeters on concrete Slav.

  • PDF

A Study on the Status and Improvement of Double Pipe System in Apartment Buildings (공동주택 이중관 공법의 현안 분석 및 개선 연구)

  • Kim, Myoung-Seok;Kim, Youngil;Chung, Kwang-Seop
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.1
    • /
    • pp.37-42
    • /
    • 2013
  • Double pipe system in which PB pipe is inserted in CD pipe buried in the concrete slab is widely used for cold and hot water supplies in apartment housings. The system, however becomes complicated and the overlaying pipes in the concrete slab weaken the compressive strength of the slab. Also, insufficient insulation increases energy loss. In this work, the problems of the double pipe system are studied and plans A, B, and C are suggested for improvement. In terms of compressive strength of the concrete slab, plan A(total pipe length 73 m) was the weakest and plan B(2 m) was the strongest. Energy loss of plan A was the largest with 558.9 W and plan B was the lowest with 220.7 W. However, considering the combined effect of strength and heat loss, plan C becomes the best choice, which retains the advantage of the double pipe system.

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

Analysis of Progress Schedule and Delay Element of Frame Works in Apartments (아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구)

  • 최은준;최민권;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

A Study on Improvement of Asphalt Concrete Pavement in Apartment Complex (단지 내 아스팔트 콘크리트 포장 설계 개선 연구)

  • Jung, Jong-Suk;Sim, Young-Jong;An, Je-Sin;Park, Yong-Boo
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.121-129
    • /
    • 2010
  • The purpose of this study is to present the resonable guideline of asphalt concrete pavements in apartment complex. To achieve this purpose was performed review of domestic and foreign guidelines, investigation of main distresses of asphalt concrete pavement, and structural analysis for the investigated cross-sections of the pavements in apartment complex. According to results of structural analysis, this study presented the standard cross-section of the pavement with subbase of 20cm, asphalt base of 5cm, and surface of 5cm in apartment complex. In urban areas, traffic is generally opened after asphalt base course is placed because of civil complaint by dust. Surface course is placed after all of work are completed. Considering these conditions, this study also presented the standard cross-section of the pavement with subbase of 20cm, asphalt base of 7cm, and surface of 5cm for urban areas that expect civil complaints by dust.

Evaluation of Field Application on the Prediction Method of Early-age Strength of Early Concrete for Construction Work Period Reduction (공기단축 조강콘크리트의 조기강도 예측기술의 현장적용성 평가)

  • Lee, Woong-Jong;Keum, Kyoung-Hun;Lee, Jae-Hyun;Jung, Yang-Hee;Kim, Yong-Ro
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.443-444
    • /
    • 2010
  • In this study, It is confirmed the validity for determination of the form removal time, utilizing prediction expression for early-stage strength which depended on the variation of curing history for early strength concrete which be passible to construction work period reduction, in apartment.

  • PDF

Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building (공동주택 하자소송의 균열하자보수비 비교.분석 연구)

  • Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deok-Seok;Kim, Ok-Kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.142-150
    • /
    • 2011
  • Defect dispute has been increasing to claim by condominium, in increasing to demand and concern in value, quality, and management of apartment building since 2000s. In this study, for checking property of cost in crack issue with precedure of lawsuit on defect, it is analyzing details about repairing cost of concrete crack defect that formed 77 percent of repairing cost. Futhermore, it is studying of composition of repairing cost and difference of repairing cost by repairing method. This is checking details that cost growth has a difference whether court accept a acceptable range of crack width, and repairing method and reinforcement work has to choose between a surface treatment method, a filling method and a injecting method. Meanwhile, it is considerable that disparity of repairing cost whether is a method of painting work.

A Study on Shear Connector Performance Estimation for Plan Extension of RC Apartment Structures (철근콘크리트 공동주택의 평면확장을 위한 연결부의 전단성능 평가에 관한 연구)

  • Kim, Dong Baek
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.2
    • /
    • pp.27-34
    • /
    • 2015
  • Nowadays, remodeling cases for some apartment like Hyundai through the support of government are reported. Conventionally, balcony and aisle are extended for additional private area or balcony which is supported by new frame is extended. In extension work at site, dowel bar is conventionally inserted in old concrete slab for connection with old and new slab, however, an examination for structural safety is rarely performed prior to construction, if ever, vertical load is only considered for structural analysis. When conventionally connected structures are exposed to earthquake, the old and new structures have individual earthquake behavior with different mode, which may lead the elimination of resistance to earthquake in new structures. As of this reason, new detailing connection system which can have light weight and sufficient ductility performance is developed for application to domestic extension works. Additionally, user manual and specification are also developed for fertilization of application for the developed technology.