• 제목/요약/키워드: apartment concrete work

검색결과 40건 처리시간 0.022초

공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구 (Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building)

  • 서덕석;박준모
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

공동주택 철근콘크리트 공사 작업지연요인에 관한 연구 (A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction)

  • 이현철;임소연;여상구;고성석
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.55-61
    • /
    • 2009
  • In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.

보-기둥구조 PC공동주택 골조공사 작업관계 분석 (Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building)

  • 김기호;김진원;김민준;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성 (Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management)

  • 김기호;김민준;김진원;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2022
  • In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.

  • PDF

공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석 (Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.97-104
    • /
    • 2015
  • 공동주택에 대하여, 2000년 이후 건설한 대상 실적 중 25개 현장에 골조. 미장, 내장, 설비, 전기 통신, 기타의 공종별로 구분하여 월별 노무량의 투입실적의 자료를 수집하였다. 이를 100%기간으로 표준화 된 공기로 변환하여 공종별로 구분하여 노무량 비율로 환산하여 노무비율의 흐름을 분석한 결과 다음과 같이 결론을 도출하였다. (1) 노무비율의 크기는 골조공사 38.25%, 미장공사 5.10%, 내장공사 5.67%, 기계설비공사 9.10%, 전기 통신공사 8.76%, 기타공사 33.12%로 골조공사가 가장 크다. (2) 노무비율이 투입 되는 피크 시기는 52.5%월부터 62.5%월까지이고 3.6%의 노무비율이었다. (3). %월별로 골조공사가 가장 큰 시기는 35%월이고 이때 %월당 2.12% 투입 노무비율이었다. 골조공사가 마무리가 시작되는 65%월부터 80%월에 서로 다른 공종간의 상호 간섭이 가장 큰 시기였다. 본 연구의 결과는 공동주택 건설공사에서 공종별로 가장 큰 혼잡도가 높은 시기를 알려주고 있으며, 이 시기의 집중 공정관리 하는 것이 성공적인 프로젝트 수행에 필수적인 사항이 된다.

공동주택 공기단축을 위해 개발된 조강 콘크리트의 강도 발현 특성에 관한 연구 (An Experimental Study on Strength Properties of Early Strength Concrete for Reduction of Working Period in Apartment)

  • 정양희;이재현;금경훈;이원암;김선만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.157-160
    • /
    • 2009
  • The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.

  • PDF

공동주택 철근콘크리트 공사의 하자담보책임기간 개정 이력 분석 (Analysis on Regulation Revision Record to Term of Warranty Liability to Reinforced Concrete Work in Apartment Building)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.268-269
    • /
    • 2017
  • Apartment building, which has been accompanied by economic growth in Korea, is a home of life and has the value overlapping as housing and assets. The improvement of consumer's eye level and development of related technology and related service development have positive function that enriches society and creates economic wealth. On the other hand, the clash and conflict between stakeholders increase social unrest and waste our competitiveness by economic loss. The term of warranty liability of apartment building is an important issue of defect lawsuits and is only a few quantitative standards. However, in this study, we examined the revision history of the law and ordinances for the reinforced concrete construction. As a result, establishing and revising the relevant standard, there is no definite basis system to support it. To improve this, the efforts to provide the standard for term of warranty liability and quantitative and objective basis to support it should be accompanied continuously.

  • PDF

공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구 (Productivity Improvement Method of Wall Rebar Work in Apartment House Construction)

  • 김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

철근콘크리트조 건축공사의 공종별 위험성 평가 (The Risk Assessment of Work Type in Reinforced Concrete Construction Work)

  • 이종빈;고성석;장성록
    • 한국안전학회지
    • /
    • 제20권1호
    • /
    • pp.119-125
    • /
    • 2005
  • Construction work accidents have not decreased in spite of much effect such as new work methods education and research related to the safety management. Specially, many fatal accidents were mainly caused by unanticipated risk factors in reinforced concrete construction work, which was involved in apartment, building. school church, hotel hospital, bank work and the other works. According to the construction fatal accident book by KOSHA 1,903 workers were killed by the fatal accidents in reinforced concrete construction work during the 13 years$(1992\~2004)$. From these reasons, this study researched the cause of fatal accidents which were happened in reinforced concrete construction work during last 13 years and surveyed construction managers and specialists about risk factors according to the work type in the reinforced concrete construction work. Therefore, this study will suggest the counterplan about the construction safety management and prevent fatal accidents from construction site related to the reinforced concrete construction work.

벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究) (The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction)

  • 김준호;김광희;조형근
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.