• Title/Summary/Keyword: and performance evaluation

Search Result 17,361, Processing Time 0.043 seconds

A Study on the Performance Evaluation of Cook in Hotel Restaurant (호텔레스토랑 조리직무의 평가에 관한 연구)

  • 진양호
    • Culinary science and hospitality research
    • /
    • v.6 no.2
    • /
    • pp.5-21
    • /
    • 2000
  • The purpose of this study looks for the directions to improve the performance evaluation of cook by examining the perceptions for performance of cook by supervisors in hotel restaurant. In order for this purpose, this study focuss on two areas: (1) the significant differences of each hotel type on the perceptions of each performance evaluation item, (2) the significant differences of each kitchen type on the perceptions of each performance evaluation item in terms of two different types of hotel. To examine (1) and (2), this study uses Student t test and anova analysis. The findings from this study have both theoretical and practical implications. Implications of these findings are discussed.

  • PDF

Impact of Sink Node Location in Sensor Networks: Performance Evaluation (센서 네트워크에서 싱크 노드 위치가 성능에 미치는 영향 분석)

  • Choi, Dongmin;Kim, Seongyeol;Chung, Ilyong
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.8
    • /
    • pp.977-987
    • /
    • 2014
  • Many of the recent performance evaluation of clustering schemes in wireless sensor networks considered one sink node operation and fixed sink node location without mentioning about any network application requirements. However, application environments have variable requirements about their networks. In addition, network performance is sufficiently influenced by different sink node location scenarios in multi-hop based network. We also know that sink location can influence to the sensor network performance evaluation because of changed multipath of sensor nodes and changed overload spots in multipath based wireless sensor network environment. Thus, the performance evaluation results are hard to trust because sensor network is easily changed their network connection through their routing algorithms. Therefore, we suggest that these schemes need to evaluate with different sink node location scenarios to show fair evaluation result. Under the results of that, network performance evaluation results are acknowledged by researchers. In this paper, we measured several clustering scheme's performance variations in accordance with various types of sink node location scenarios. As a result, in the case of the clustering scheme that did not consider various types of sink location scenarios, fair evaluation cannot be expected.

A Study on the Effect of Members' Perception of Internal Performance Evaluation on Organizational Commitment: Focused on the Case of A Public Corporation (내부성과평가에 대한 구성원 인식이 조직몰입에 미치는 영향 연구 : A 공기업사례를 중심으로)

  • Shin, Soohaeng;Woo, Yoonseuk
    • Knowledge Management Research
    • /
    • v.22 no.3
    • /
    • pp.1-16
    • /
    • 2021
  • For the effective responsiveness toward Management Evaluation System of Public Institutions and continuous development as a public corporation, internal performance management is essential. In this study, the effect of employees' perceptions on the effectiveness and acceptability of the internal performance evaluation system on organizational commitment was tested, and we attempted to find implications for efficient performance management. For this purpose, we obtained valid responses from 208 members of A corporation and the hypotheses were verified through multiple regression analysis. As a result of the analysis, 'performance evaluation effectiveness' and 'performance evaluation acceptability' for internal performance evaluation had positive effects on 'organizational commitment'; however, the effect of 'differential performance compensation' on 'organizational commitment' was not significant. Also, among the control variables, 'age' and 'job group' were found to have a negative (-) effect on 'organizational commitment'. To derive more generalized conclusion, other researches using bigger samples are needed.

Effect of Uncertain N-values to Seismic Performance Evaluation of Underground Structures (불확실한 지반의 N값이 지중구조물의 내진성능평가에 미치는 영향)

  • Park, Ji-hwan;Lee, Tea-hyung
    • Journal of the Society of Disaster Information
    • /
    • v.6 no.2
    • /
    • pp.45-65
    • /
    • 2010
  • There has been tighten up the need of seismic retrofit about 31 public facilites since published "Korean Earthquake Damage Prevention Law". Therefore, seismic studies have been developed and enforced the studies. Measuring dynamic stiffness of subsurface materials influence on seismic performance evaluation to build up seismic retrofit. The soil dynamic properties for seismic performance evaluation are N-value from using SPT(standard penetration test), dynamic shear elastic modulus and dynamic deformation modulus using laboratory tests. The most unscientific element in ground dynamic properties involved uncertainties is obviously N-value using SPT. This study shows that effect of N-value included natural and artificial uncertainties to seismic performance evaluation of ground structures is not only approached probabilistic analysis using FOSM method and tornado diagram, but also review how to spread effect of seismic performance evaluation of ground structures.

Analysis and evaluation of sound reduction performance of drywall system (건식벽체 차음성능 분석 및 평가)

  • Baek, Seung-Kyung;Chang, Chun-Sang;Go, Jong-Cheol;Lee, Jong-In;Kim, Hyun-Bae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.10a
    • /
    • pp.727-732
    • /
    • 2009
  • The objective of this study is to analyze and evaluate design factors relating to sound reduction performance in dry wall system. The main contents of this study are as follows. 1) Analysis and pre-evaluation of sound reduction performance of drywall system ; The sound reduction performance was pre-evaluated by INSUL simulation and these results of analyzing walls were analyzed by screening DOE(design of experiment) for selecting major factors that dominant influence the sound reduction performance. These main factors relating to sound reduction performance can be used for development of 1st grade sound reduction performance drywall system. 2) Design and evaluation of 1st grade sound reduction performance drywall system; The evaluation test of the sound reduction performance gave vaues higher than 1st grade (Rw+C=64). When campared with existing dry wall system, respectivelly, the new system shows performance higher than 8 dB.

  • PDF

Performance Evaluation of Wired/Wireless LAN Adaptors (유무선 LAN 어댑터의 성능시험)

  • 이부호
    • Proceedings of the IEEK Conference
    • /
    • 2000.11a
    • /
    • pp.209-212
    • /
    • 2000
  • This paper discusses performance evaluation methodologies for wired/wireless Ethernet adaptors. This paper defines test cases for performance evaluation of LAN adaptor and its environments. Performance evaluation of LAN adaptor is mote complex as compared with interconnection devices such as Ethernet HUB and Ethernet switch, because its performance depends on the system on which the adaptor is plugged. Such dependencies include CUP type, RAM size, system bus architecture(PCI bus clock), etc.

  • PDF

The Development of Performance Evaluation Measures for Logistics Information Systems on the Basis of BSC (균형성과표(BSC)를 이용한 물류정보시스템 성과평가지표 개발)

  • Kang, Hee-Suk;Kim, Sang-Hoon
    • Journal of Information Technology Services
    • /
    • v.12 no.3
    • /
    • pp.273-287
    • /
    • 2013
  • The objective of this study is to empirically develop performance evaluation measures for LIS (logistics information systems) based upon BSC (balanced scorecard) model and determine the relative importance among four perspectives of BSC using AHP (analytic hierarchy process) methodology. Above all, forty nine probable measures for evaluating LIS performance were identified through reviewing the previous research related with SCM (supply chain management), logistics management, and information systems evaluation. And then, these probable measures were examined by means of coincidence analyses using three mutually exclusive criteria(validity of content, ease of measurement and reliability of measurement). Data for conducting the coincidence analyses were collected from LIS users and LIS development personnel. As the results of the coincidence analyses, it was found that 31 ones among 49 probable performance evaluation measures theoretically derived could be qualified for LIS performance evaluation. And AHP analysis showed that the weight of each perspective was respectively as follows : 46.8% for financial perspective, 31.3% for customer perspective, 14.8% for internal business process perspective, and 7.1% for learning and growth perspective. The academic contribution of this study is that performance evaluation measures for LIS could be systematically and empirically developed on the basis of BSC. Also, the results of this study are expected to be used as a practice guideline of evaluating and improving LIS.

A Study on the Development of National R&D Patent Performance Evaluation Indicators and Evaluation Models (국가 연구개발 특허성과 평가 지표 및 평가 모형 개발에 관한 연구)

  • Hong, Hee-Jung;Lee, Jung-Hoon
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.4
    • /
    • pp.1-9
    • /
    • 2020
  • This study draws implications by surveying and analyzing performance evaluation cases in Korea and overseas, and analyzes qualitative and quantitative performance evaluation indexes and evaluation models that fit the national R & D performance evaluation system through analysis of patent creation performance data or company status data. Also, in order to apply this to a specific group of companies with excellent exports and technical skills, we will conduct a case study on the performance analysis of patent strategy support projects based on the results of the survey. Although this study has some limitations in developing performance evaluation indicators due to the limited scope of business or business characteristics of the patent strategy support project, the qualitative evaluation system can be reviewed through previous studies and domestic and overseas case studies. Due to the problem of accessing and collecting data related to the performance of the support project, there is a limitation that performance analysis cannot be performed at a sufficient level. Nevertheless, after the completion of R&D support projects and patent strategy support projects, follow-up performance analysis can be performed through follow-up surveys. It is expected to be possible.

A Study on The Improvement for Professor Research Achievement Evaluation Applying a Case Study of Foreign Universities (외국대학 사례 조사를 통한 교수 연구업적평가 개선방안에 관한 연구)

  • Ji Hei Kang;Jongwook Lee;Yong Hwan Kim;Younghee Noh
    • Journal of Korean Library and Information Science Society
    • /
    • v.53 no.4
    • /
    • pp.211-232
    • /
    • 2022
  • Research performance evaluation has been based heavily on quantitative criteria. Various limitations however were revealed and the demand for excellence in research quality was growing and the importance of qualitative evaluation factors was increasing as well. The study investigates and introduces cases for improving research evaluation that have appeared around the world since 2010. To extract qualitative factors that can be introduced in research achievement evaluation in Korea this study investigated and organized the performance evaluation cases of foreign universities and proposed the introduction of the evaluation method in Korea. Qualitative evaluation factors were extracted by analyzing achievement evaluation documents evaluation procedures and evaluation standards of top 10 universities around the world. As a results this study proposes the use of various performance evaluation documents mulch-faceted evaluation and multi-level performance evaluation process and various qualitative performance evaluation standards. In traditional bibliometrics, while the degree of citation was measured when generating research evaluation indicators, future indicators may reflect recommendation scores as indicators, or include industrial connectivity and utilization in education / industry. It is hoped that the performance evaluation method will be balanced through this paper and ultimately the professor's research achievement evaluation will be a process that can help individuals grow into excellent researchers and develop the research environment.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.