• Title/Summary/Keyword: an Estimation of Maintenance Cost

Search Result 85, Processing Time 0.027 seconds

The study on configuration method for the vehicle-based train position detection (차상기반 열차위치검지방식의 구성방안 연구)

  • Shin, Kyung-Ho;Jung, Eui-Jin;Kim, Jong-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.238-240
    • /
    • 2006
  • For the method of train position detection, ground-based train position estimation mainly has been applied so far. Ground-based position detection is the way to detect train current positions by installing train position equipments on railroad lines. However, the ground-based methods should install detection equipments on each section, and can only be able to detect train positions from main command center. So this method has several disadvantages such as an discontinuous position detection, an increment in cost of installation and maintenance. To make possible continuous train position detection, and to minimize amount of the cost, the vehicle-based position detection method should be chosen to determine train positions by loading position equipments on vehicles. In this paper, to realize the vehicle-based train position detection method, configuration scheme of train position detection equipment is suggested by using GPS, inertial sensor, speed sensor and its performance is verified by simulations.

  • PDF

Estimation of Life Expectancy and Budget Demands based on Maintenance Strategy (도로포장 유지보수 전략에 따른 기대수명과 보수비용산정)

  • Han, Dae-Seok;Do, Myung-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.345-356
    • /
    • 2012
  • Road pavement requires repetitive maintenance works to maintain satisfactory service level to the public. However, the repetitive maintenance works upon deteriorated pavement structure make negative effects to deterioration speed. It often leads to inefficient use of limited budget. For that reason, the pavements require reconstruction work to recover their original performance. Recently, construction demands in the Korean national highway have already been reached to maximum level, and the aged pavements start to demand much more reconstruction works. However, in the real world, road agencies have often been confused when they determine maintenance design for such aged road sections due to budget constraint. It is because there is no reliable long-term maintenance strategy that supports their decision making. To support their decision making, this paper aimed to suggest the best maintenance strategy considering changing process of pavement performance by repetitive maintenance works. As an analysis method, probability distribution and hazard function to estimate the life expectancy were adopted, and then the results were used for long-term life cycle cost analysis with deterministic or Monte-Carlo method under various scenarios. As an empirical study, the Korean national highway data that has long-maintenance history data since 1986 has been applied. Last, this paper considered quality assurance of maintenance work to improve maintenance quality. These could be important information as a part of long-term maintenance strategy of pavement.

Review on Advanced Health Monitoring Methods for Aero Gas Turbines using Model Based Methods and Artificial Intelligent Methods

  • Kong, Changduk
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.15 no.2
    • /
    • pp.123-137
    • /
    • 2014
  • The aviation gas turbine is composed of many expensive and highly precise parts and operated in high pressure and temperature gas. When breakdown or performance deterioration occurs due to the hostile environment and component degradation, it severely influences the aircraft operation. Recently to minimize this problem the third generation of predictive maintenance known as condition based maintenance has been developed. This method not only monitors the engine condition and diagnoses the engine faults but also gives proper maintenance advice. Therefore it can maximize the availability and minimize the maintenance cost. The advanced gas turbine health monitoring method is classified into model based diagnosis (such as observers, parity equations, parameter estimation and Gas Path Analysis (GPA)) and soft computing diagnosis (such as expert system, fuzzy logic, Neural Networks (NNs) and Genetic Algorithms (GA)). The overview shows an introduction, advantages, and disadvantages of each advanced engine health monitoring method. In addition, some practical gas turbine health monitoring application examples using the GPA methods and the artificial intelligent methods including fuzzy logic, NNs and GA developed by the author are presented.

Effectiveness analysis about Readjustment of Fishery Permit (어업허가 일제정비제도 도입에 따른 효과분석)

  • Lee, Kwang-Nam;Jung, Jin-Ho
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.2
    • /
    • pp.97-112
    • /
    • 2011
  • The coastal and offshore fishery to manage from a fishery permit system in our country at present seems to be a sign of lots problem, which are illegal fishing, a permit rent, non fishing vessel the purpose of vessel reduction, fishery compensation, tax exemption oil, the excessive occurrence of administrative cost due to differences during a period of a fishery permit. All the readjustment system for the permit has suggested an effective solution for a fishery permit management, the maintenance of a fishery order(the prevention of illegal fishery), the prevention of unused fishery, the entrance of new vessel in coastal fishery and it's system has prevent this problems in ahead. This paper has estimated an prevention convenience for an illegal spill of the tax exemption oil, actual effects of vessel reduction, the conservation of fishery resource for the future value and carried out an economic analysis to estimate compliance cost for the system introduction. Also, this study have analyzed throughly the coastal fishery situation and catched lots of issues on the management for the permit system. Especially, the problems improving the readjustment introduction for the permit have estimated the social and economic effects quantitatively and qualitatively with a calculated technique to classify various scenarios. This paper has judged correctly the term of validity for the permit to shorten as a result of the estimation and it will be to take the net convenience cost 1,655thousand million won. The results of this study have expect to provide a basic data to introduce the readjustment system for the permit.

A research on the design parameters for a double-transmission main system for sustainable water supply (이중송수관로를 이용한 안정적인 송수를 위한 설계인자에 관한 연구)

  • Hyun, Inhwan;Hong, Juneui;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.129-138
    • /
    • 2013
  • Water interruption is often caused by a rupture in the branch-like singular pipeline. This will cause critical complaints from household and may decrease public service quality. As an alternative of singular pipeline, additional parallel pipeline could be installed for sustainable water supply. This system is called double pipeline system and able to be utilized for water transmission line between treatment plant and distribution reservoir. Construction of double pipeline was thought to increase capital cost, which can be an issue to waterworks authorities. Reducing capital cost was possible by means of installing connectors between two parallel pipelines because of reduced diameter of each pipe. To obtain optimal design condition for connectors, it was necessary to compare water pressure according to accident location, to investigate flow according to connection pipe spacing, connection pipe diameter, and aging of pipe. Reliable and economical connection layouts were determined based on these results. The cost estimation for each design condition was carried out. Cost was approximately reduced by 20 ~ 30 % compared to the double pipeline without connections. In addition to this, connection between double pipelines could expect extra benefits for maintenance since the pipe could be repaired and rehabilitated without interruption.

Architecture of XRML-based Comparison Shopping Mall and Its Performance on Delivery Cost Estimation (XRML 기반 비교쇼핑몰의 구조와 배송비 산정에 관한 실증분석)

  • Lee Jae Kyu;Kang Juyoung
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.2
    • /
    • pp.185-199
    • /
    • 2005
  • With the growth of internet shopping malls, there is increasing interest in comparison shopping mall. However most comparison sites compare only book prices by collecting simple XML data and do not provide .the exact comparison Including precise shipping costs. Shipping costs vary depending on each customer's address, the delivery method, and the category of selected goods, so rule based system is required in order to calculate exact shipping costs. Therefore, we designed and implemented comparison shopping mall which compares not only book prices but also shipping costs using rule based inference. By adopting the extensible Rule Markup language (XRML) approach, we proposed the methodology of extracting delivery rules from Web pages of each shopping mall. The XRML approach can facilitate nearly automatic rule extraction from Web pages and consistency maintenance between Web pages and rule base. We developed a ConsiderD system which applies our rule acquisition methodology based on XRML. The objective of the ConsiderD system is to compare the exact total cost of books including the delivery cost over Amazon.com, BarnesandNoble.com, and Powells.com. With this prototype, we conducted an experiment to show the potential of automatic rule acquisition from Web pages and illustrate the effect of delivery cost.

Estimation of LCOE for Korean PV Projects : For the Ones that Financial Investors Participated in (한국 태양광발전사업의 에너지균등화비용(LCOE) 추정: 재무적투자자 참여사업을 대상으로)

  • Kim, Young-Kyung;Chang, Byung-Man
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.23-29
    • /
    • 2012
  • LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1 MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

The Bayesian Approach of Software Optimal Release Time Based on Log Poisson Execution Time Model (포아송 실행시간 모형에 의존한 소프트웨어 최적방출시기에 대한 베이지안 접근 방법에 대한 연구)

  • Kim, Hee-Cheul;Shin, Hyun-Cheul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.7
    • /
    • pp.1-8
    • /
    • 2009
  • In this paper, make a study decision problem called an optimal release policies after testing a software system in development phase and transfer it to the user. The optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement is generally accepted. The Bayesian parametric inference of model using log Poisson execution time employ tool of Markov chain(Gibbs sampling and Metropolis algorithm). In a numerical example by T1 data was illustrated. make out estimating software optimal release time from the maximum likelihood estimation and Bayesian parametric estimation.

An Analysis of Grinding Effects and Economic Life of Cutting Tool with Proportional Age Reduction Model (비례 수명 감소 모형을 사용한 절삭공구의 연마효과 및 경제적 수명 분석)

  • Oh, Sung-Youl;Hong, Jung-Wan;Lee, Sang-Cheon;Lie, Chang-Hoon
    • IE interfaces
    • /
    • v.19 no.4
    • /
    • pp.316-323
    • /
    • 2006
  • In this study, based on Weibull proportional age reduction model and age replacement policy, we analyze economic life of cutting tool which allows re-grinding. Re-grinding task, usually for high-priced machining tools(e.g., broaching tool), is a kind of preventive maintenance activities to extend tool life at the completion of a lot production. The numerical results are also presented. Among the parameters of Weibull proportional age reduction model, the re-grinding effect parameter and Weibull shape parameter have a strong effect on economic tool life, and in the cost parameters, shortage cost is most sensitive. With further study on the parameter estimation of tool life process and cost function, this study can be expected to give more practical contribution to management of general machining tools.