• Title/Summary/Keyword: allowance for long-term repair

Search Result 5, Processing Time 0.017 seconds

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

An Analysis of Factors Affecting the Amount of Long-term Repair Allowance Used and the Amount of General Repair Cost Used in Apartment Houses : Focused on the Bidding Construction Cost of Apartment Houses in Busan (공동주택의 장기수선충당금 사용액과 일반보수비 사용액에 영향을 미치는 요인 분석 : 부산시 공동주택의 입찰공사비를 대상으로)

  • Lee, Chan-Ho
    • Journal of Industrial Convergence
    • /
    • v.20 no.5
    • /
    • pp.1-9
    • /
    • 2022
  • Today, apartment houses account for a very high proportion of the types of residence. This study analyzed the difference between the bidding construction cost using the long-term repair allowance and using the general repair cost, and analyzed the difference of factors affecting the amount of use of these two items. For this purpose, related data on apartment housing complexes located in seven representative districts of Busan from 2017 to 2021 were collected and analyzed from the apartment housing management information system. As a result of statistical analysis, the type of bidding variable had the greatest negative(-) effect on the bidding construction cost, and the next factor that affected was different between the amount of long-term repair allowance used and general repair cost used. In addition, there was a difference in statistical significance in the type of bidding by construction year for the number of bidding works between the case of using the long-term repair allowance and the case of using the general repair cost. The results of this analysis will help to find ways to reduce bidding construction costs. However, it is expected to find additional meaning by including more detailed variables such as technical ability.

The Replacement Plans for Aged Public Water Supply Pipes in Apartment Buildings : Especially Apartment Buildings in Bucheon (공동주택의 노후 급수관 개선방안에 관한 연구 : 부천시 공동주택을 중심으로)

  • Lee, Yong-Hwa;Heo, Yong-Chul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.4
    • /
    • pp.228-232
    • /
    • 2015
  • The water supply galvanized steel pipes of apartment buildings in Bucheon city constructed with building permission before 1994 have many problems such as leaks, the water containing rust, and low water pressure due to corrosion. Therefore, this study aims to find a way to renew the water supply pipes under investigation through a survey. As a result, when replacing the galvanized steel pipe with the corrosion-resistant pipe, the water supply system should also be changed from the gravity tank system to the booster pump system and the hygienic water storage tank. It is necessary to redraft the long-term repair plan including the replacement of the water supply system. Also, it is necessary to save the allowance reserve according to the modified long-term repair plan.

Effect of the Type of Apartment Management on Long-Term Repair Allowances and Common Management Fees : For Apartment Houses Subject to Mandatory Management Located in Busan (공동주택 관리형태가 장기수선충당금과 공용관리비에 미치는 영향 : 부산시 의무관리대상 공동주택을 대상으로)

  • Kim, Hong-Chul;Lee, Chan-Ho
    • Journal of the Korea Convergence Society
    • /
    • v.13 no.1
    • /
    • pp.349-355
    • /
    • 2022
  • Today, apartment houses account for a very high proportion of the types of residence. This study aims to present basic data for preparing a reasonable distribution plan by identifying factors considered in calculating the amount of collection of management fees. After reviewing previous studies on common management fees and long-term repair allowances, various data on apartment houses subject to mandatory management in Busan in 2020 were collected from the Apartment Management Information System to analyze the differences in influencing factors according to type of apartment management(self-governing management, consignment management). As a result of statistical analysis, the number of households and many construction elapsed periods had a negative(-) effect on long-term repair allowances, and many construction elapsed periods had a negative(-) effect on common management fees. In addition, the degree to which many construction elapsed periods had a negative(-) effect on long-term repair allowances and common management fees had less impact on consignment management than on self-governing management. And the long-term repair allowances were imposed less by consignment management, common management fees were charged less by self-governing management. The results of this study will serve as basic data for rational distribution of long-term repair allowances and common management fees to residents and managers of apartment houses subject to mandatory management in Busan.

Comparison of Predicted Maintenance Costs and Actual Maintenance Cost of Military Facilities - Focused on BTL Project - (병영 시설물 수선유지비용 예산대비 실투입 비교에 관한 연구 - BTL사업 중심으로 -)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.473-481
    • /
    • 2017
  • With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.