• Title/Summary/Keyword: a private infrastructure project

Search Result 100, Processing Time 0.027 seconds

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.

Suggestion for Technology Development and Commercialization Strategy of CO2 Capture and Storage in Korea (한국 이산화탄소 포집 및 저장 기술개발 및 상용화 추진 전략 제안)

  • Kwon, Yi Kyun;Shinn, Young Jae
    • Economic and Environmental Geology
    • /
    • v.51 no.4
    • /
    • pp.381-392
    • /
    • 2018
  • This study examines strategies and implementation plans for commercializing $CO_2$ capture and storage, which is an effective method to achieve the national goal of reducing greenhouse gas. In order to secure cost-efficient business model of $CO_2$ capture and storage, we propose four key strategies, including 1) urgent need to select a large-scale storage site and to estimate realistic storage capacity, 2) minimization of source-to-sink distance, 3) cost-effectiveness through technology innovation, and 4) policy implementation to secure public interest and to encourage private sector participation. Based on these strategies, the implementation plans must be designed for enabling $CO_2$ capture and storage to be commercialized until 2030. It is desirable to make those plans in which large-scale demonstration and subsequent commercial projects share a single storage site. In addition, the plans must be able to deliver step-wised targets and assessment processes to decide if the project will move to the next stage or not. The main target of stage 1 (2019 ~ 2021) is that the large-scale storage site will be selected and post-combustion capture technology will be upgraded and commercialized. The site selection, which is prerequisite to forward to the next stage, will be made through exploratory drilling and investigation for candidate sites. The commercial-scale applicability of the capture technology must be ensured at this stage. Stage 2 (2022 ~ 2025) aims design and construction of facility and infrastructure for successful large-scale demonstration (million tons of $CO_2$ per year), i.e., large-scale $CO_2$ capture, transportation, and storage. Based on the achievement of the demonstration project and the maturity of carbon market at the end of stage 2, it is necessary to decide whether to enter commercialization of $CO_2$ capture and storage. If the commercialization project is decided, it will be possible to capture and storage 4 million tons of $CO_2$ per year by the private sector in stage 3 (2026 ~ 2030). The existing facility, infrastructure, and capture plant will be upgraded and supplemented, which allows the commercialization project to be cost-effective.

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A study on the improvement of efficiency for waterworks on the basis of the accidents in the system by setting the example of Chungcheongbuk-do (시스템사고에 기반한 상수도 효율성 개선에 관한 연구: 충청북도를 중심으로)

  • Kim, Na-Yoon;Kim, Sun-Duck;Lee, Man-Hyung
    • Korean System Dynamics Review
    • /
    • v.17 no.2
    • /
    • pp.81-99
    • /
    • 2016
  • The service for waterworks is important infrastructure structuring the cities and the public properties affecting the health and the abundant lives of the residents at the same time. However, the waterworks project still has many problems in reality in spite of the continuous efforts from the nation, local governments and many related people in waterworks projects. From the aspect of the situation, this purpose of this study is to review the actual operation state and the operation principle on the basis of the accidents in the system and to suggest the policy leverages for accurate diagnosis of the waterworks project and for the efficient operation. The operation structure of the service for waterworks is the complicated system showing the overlapped forms of the relation with other various factors. Moreover, as this has been influenced by other external environments, it has flexible features that can be changed by unexpected factors even if the internally close causality has been established The domestic local operation of waterworks have been divided by an administrative district and it causes inefficiency in the aspect of the country and the local government with small sized of budget faces the insufficient investments. These phenomena have been shown in some small sized areas located in Chungcheongbuk-do and, making a realistic suggestion by the related local government to improve the waterworks operation project is urgent. For this reason, this study is to lead the policy leverages to increase the efficiency of the service for waterworks and to stabilize the structure of virtuous circle in the system. At first, the reformation of the waterworks structure should be performed after the various supports and system maintenance. At second, the service quality should be improved through the creativity in management and the consideration of the efficiency by the participation of private enterprises for waterworks service. At third, through the specialized waterworks operation, the quality improvement of the waterworks and satisfying the standard of natural environment should be related. In this context, the fundamental solutions for the problems of domestic waterworks service and finding realistic alternatives are considered to be the priority for the waterworks project to be operated efficiently.

Operating model for A Value-For-Money evaluation of BTL Projects for Educational Facilities (교육시설 BTL 사업의 투자가치 평가를 위한 운영비 모형 구축)

  • Son, Ki-Young;Kim, Jang-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.141-150
    • /
    • 2006
  • As the law on the private sector investment in social infrastructure was amended in January of 2005, the government is aggressively promoting BTL projects but many trials and errors and problems are occurring. Especially, the Value-For-Money evaluation conducted by the responsible agencies to judge the appropriateness of the project found there was a conspicuous difference between the computed cost and the final contract sum. Accordingly, this study is aimed to grasp the problems in the current Value-For-Money evaluation and to improve it in order to proceed with BTL projects efficiently. To achieve this, through a relative comparison to the final contract sum, a clear standard for the items of Value-For-Money evaluation was presented and thus, a model that can ensure accuracy in computing the Value-For-Money was established so that a delay in negotiations can be avoided. If the Value-For-Money evaluation established in this study is used in assessing the appropriateness of unit prices for BTL projects for education facilities, a reasonable result can be expected to be drawn in selection and negotiations with contractors, and maintenance and Post-Operation-Evaluation(POE) of education facilities as well.

Comparative Study of the Effects of the Intermodal Freight Transport Policies (인터모달 추진 정책과 효과에 관한 비교연구)

  • Woo, Jung-Wouk
    • Journal of Distribution Science
    • /
    • v.13 no.10
    • /
    • pp.123-133
    • /
    • 2015
  • Purpose - The Korean government has devised intermodal transportation policies and granted subsidies to shippers and logistics companies that made a conversion of transportation means through the policies. This provides support by expanding the complex uniform railroad transportation and overhauling the deteriorated railroad facilities. As for 2013, however, the freight transportation percentage of railroad was 4.5% in tons and 8.5% in ton kilometers. Meanwhile, since the 1990s, developed countries such as the U.S. and Europe have been trying to expand intermodal freight transport with a legal and institutional support to build a logistics system corresponding with social and economic environmental changes. In this study, I set out to examine the effects of the intermodal freight transport policies in the EU and the U.S., and to explore the direction of setting up a rail intermodal transport system in South Korea. Research design, data, and methodology - The paper used a qualitative research methodology through the literature review. First, was an overview of Intermodal transportation in the EU, U.S. and UN. Second, it describes the development of transport in Europe and the U.S. with particular emphasis on intermodal freight transport. Third, it explores the direction of setting up a intermodal freight transport in South Korea. The last section contains concluding remarks. Results - As for the EU, it has been promoting integration between transport and intermodal logistics network designs while utilizing ITS or ICT and supports for rail freight intermodal by giving reduction to a facilities fee or subsidizing for rail freight in order to minimize the cost of external due to freight transport. On the other hand, as for the U.S., it has been made up of an industrial-led operating project and has been promoting it to improve accessibility between intermodal hubs and cargo terminals through intermodal corridor program, and an intermodal cargo hub access corridor projects, etc. Moreover, it has tried to construct intermodal transport system using ITS or ICT and to remove Barrier. As a result, in these countries, the proportion of intermodal freight transport is going to be the second significant transport compared with rail and maritime transport. An Effective rail intermodal transport system is needed in South Korea, as seen in the case of these countries. In order to achieve this object, the following points are required to establish radical infrastructure policy; diversify investment financing measures taken under public-private partnerships, legal responsibilities, improvement of utilization of existing facilities to connect the railway terminal and truck terminal, and enhancement service competitiveness through providing cargo tracking and security information that combines the ITS and ICT. Conclusions - This study will be used as a basis for policy and support for intermodal freight transport in South Korea. In the future, it is also necessary to examine from the perspective of the shipper companies using the rail intermodal transport, ie, recognition of shipper, needed institutional supports, and transportation demand forecasting and cost-effective analysis of the railway infrastructure systems improvement.

A Case Study on the Local-based Welfare Facilities of Urban Renaissance Agency in Japan by Business Entry System for Stable Living (일본 UR도시기구의 안심주공간사업자참여제도를 통한 지역복지거점시설 정비사례 연구)

  • Yoo, Soon-Seon
    • Journal of the Korean housing association
    • /
    • v.24 no.5
    • /
    • pp.9-16
    • /
    • 2013
  • The purpose of this study is to analyze local-based social welfare facilities to respond to secular change of the UR rental housing estates in Japan. The selected case studies for the analysis are Hibarigaoka, Hamakousien, Turumai UR rental housing estates constructed around 1960's. The analysis was done through UR website, MLIT (Ministry of Land, Infrastructure, Transport and Tourism) and MHLW (Ministry of Health, Labour and Welfare) policy report, and related literature. These case studies are connected with housing policy as well as welfare policy and performed to Stable Living Creation Project by Business Entry System for Stable Living. The types of local-based social welfare facilities are classified by welfare corporation and medical corporation. The results are as follows: 1) The implementation of cooperative and participative system not only the private sector (welfare and medical Corporation, etc.) but also the public (MLIT, MHLW, UR Renaissance Agency, Local government, etc.). 2) Repurposed of land through rent and transfer of land for local-based social welfare facilities in the process of housing stock renewal utilization. 3) The pursue of regional revitalization through attached to multi-generation facility or local community space for elderly in local-based social welfare facilities.

Recognition of Stakeholders Regarding Building-Related Landscape Systems (대지의 조경 제도에 대한 관련 주체의 인식 비교 분석)

  • Kim, Yong-Gook;Lee, Sang-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.79-91
    • /
    • 2018
  • This study proposes the difference of awareness and improvement plan of building-related landscape systems through a cognition survey of building owners, public officials, and experts. The main results are as follows. First, all three groups are highly aware of the need to secure urban green spaces. Even if private property rights are restricted, the level of awareness that green space should be secured for public benefit is high. The level of interest in the building-related landscape system was also surveyed to a greater degree. Second, the survey respondents, including the building owner group, answered that there is a need to strengthen the building-related landscape area standards. It can be seen that there is a need to revise the relaxation of the building-related landscape area standards through an amendment of the Building Ordinance in many local governments. Third, most municipalities are not equipped with an organizational system that can promote the work of building-related landscape. It is necessary to newly hire civil servants for landscape design, maintenance, and management specialization, or to expand co-working relationships with related departments. Fourth, building owners are interested in building-related landscape, but they do not know specific management methods and leave the landscape space. The municipality needs to offer guidance on landscape architectural design and construction methods that the building owners can easily follow and to support the voluntary landscape space management on the part of the local residents by supporting the trees. Fifth, in order to improve the building-related landscape system, it is necessary to verify the effect of the building-related landscape and spread a consensus. At the government level, in order to enable building owners to recognize the value of the landscape space in connection with an urban regeneration project, it is necessary to present an example of an excellent building-related landscape installation via a pilot project.

Key Risks and Success Factors on the China's Public-Private Partnerships Water Project (중국 수처리 민관협력사업 사례분석을 통한 시사점 도출: 위험 및 성공 요인 도출)

  • Choi, Jae-Ho;Lee, Seung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.134-144
    • /
    • 2010
  • In China, the enhancement of water services has become the most crucial issue confronted with the rapid urbanization and industrialization process. A huge financial gap to meet the demand for water infrastructure and need for adopting advanced operation technology precipitated the rapid growth of PPP over the last 10 years. Diverse schemes of PPP such as TOT, Divestiture, and Management Contract and Lease have been practiced. Local governments and private investors/operator have adjusted their objectives and strategies to avoid potential pitfalls behind BOT projects in China. However, current academic research outcomes do not properly reflect important issues of BOT projects or related case studies in China. This limitation has brought in the lack of assessment of important risks and success factors required for the improvement of the body of risk management. In this regard, this study uses the market analysis method to identify major schemes of PPP water projects and conducts case studies on five PPP projects to identify key risk and success factors in association with each different scheme. It is expected that the risk and success factors identified from the cases will be used as reference to Korean companies which plan to enter the Chinese water market.

Comparison of Methodology and Accuracy of Digital Mapping of Forest Roads (수치임도망도 제작방법 및 정확도 비교)

  • Kim Tae-Geun;Yoon Jong-Suk;Woo Choong-Shik;Lee Kyu-Sung;Hong Chang-Hee
    • Spatial Information Research
    • /
    • v.13 no.3 s.34
    • /
    • pp.195-209
    • /
    • 2005
  • Forest road has been an essential infrastructure for various forestry practices as well as for recreational use, disaster management, and local economics promotion. Since 1980s, extensive network of forest roads has been constructed as an national project in Korea. However, due to the minimal-budget of the project, accurate maps of forest road are not usually available. Although forest road map is a main thematic layer for the forest Geographic Information System (FGIS), its locational accuracy has not been sufficient for the practical applications and, therefore, the update of digital forest road maps is urgent. The objectives of this study is to compare ae methodology of generating and updating digital forest road maps from the aspects of the map accuracy and the efficiency of methods. Four mapping methods (GPS surveying, satellite imagery, ortho aerial photograph, and digital photogrammetry) were applied to generate the forest road maps over the study area of Mt. Oseo in Chungchungnam-do, which has a 35km forest roads distributed in national, public and private forests. The forest road Imp produced by digital photogrammetric method is the most accurate and comparable to GPS surveying although it required the greatest amount of labor time.

  • PDF