• Title/Summary/Keyword: a planning phase

Search Result 672, Processing Time 0.025 seconds

Landscape Resources Evaluation strategy of rural waterfront villages - An application to a rural waterfront village along the Han river - (수변 농촌 마을의 경관 자원 우수성 평가 방안에 관한 연구 - 한강 유역 수변 농촌 마을 사례적용 -)

  • Lee, Jung-A;Lee, Yoo-Kyoung;Lee, Sang-Woo;Chon, Jin-Hyung
    • Journal of Korean Society of Rural Planning
    • /
    • v.17 no.3
    • /
    • pp.91-101
    • /
    • 2011
  • The purpose of this study is to suggest a landscape resources evaluation strategy of rural waterfront villages along the river. This strategy consists of three phases: 1) an evaluation of rural amenity landscape resources, 2) an evaluation of water landscape resources, and 3) development of a positioning map based on the results of phase 1) and 2) the study result as follows. First, the evaluation method used in phase 1) was modified as a set of proposed evaluation indicators to assess development potential on rural waterfront villages. Second, to evaluate water landscape resources in rural waterfront villages, a series of evaluation index was developed including water area, diversity of water resources, biodiversity, and landscape quality. And the last, the positioning map showed relative position of waterfront villages obtained from two evaluation results: rural amenity landscape resources and water landscape resources. The study examined the proposed strategy as a possible alternative to evaluate landscape quality to 398 rural waterfront villages along the Han River. Landscape resources evaluation strategy proposed here could contribute to government officials and planners to operate systematic planning and management of rural waterfront villages.

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

국가연구개발사업 중간평가방법 연구-선도기술개발사업에의 적용사례-

  • 임윤철;이철원
    • Journal of Technology Innovation
    • /
    • v.5 no.2
    • /
    • pp.126-154
    • /
    • 1997
  • This paper addresses a methodology for monitoring the first phase('92-94') progress and its implication fo Highly Advanced National R&D Projects (HAN or G7 project) in Korea. The authors suggest a three-stage life cycle model for the management of national R&D program; planning stage, implementing & monitoring stage, and evaluating & harvesting stage. The interim evaluation, the main focuses of this paper, is one of the key issues for the effective management of national R&D program at the implementing & monitoring stage. The conceptual framework of the interim evaluation was developed both through reviewing related literature and considering the characteristics of the HAN program. A stepwise procedure of interim evaluation was introduced: 'initial screen' and 'detailed examination'. At initial screen all 11 projects were reviewed in terms of both their relevance and performance in order to decide whether further detailed scrutiny is needed or not. If there exist critical problems on the relevance or on the intermediate progress of each project, it is to be under further detailed examination. Evaluation was initiated by the G7 Planning and Evaluation Committee, which was established for advising, directing, and monitoring the HAN Projects, with the help of large number of experts from industries, universities, and research institutes. The monitoring results were reported to the related ministries and project coordinating agencies, and reflected in the second phase.

  • PDF

Process of Cost Estimation in Feasibility Analysis Considering ratio of Renewable Portfolio Standard (신·재생에너지 공급의무화제도(RPS) 비율을 고려한 타당성 분석의 공사비 산정 프로세스)

  • Yang, Hyun-Ju;Kim, Jong-Hyeob;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.44-45
    • /
    • 2014
  • Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.

  • PDF

A Basic Research for Algorithms of Form Quantity Survey of Green Frame (그린프레임의 거푸집 물량산출 알고리즘 기초연구)

  • Kim, Taekoo;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.193-194
    • /
    • 2014
  • Green Frame is a building frame system composed of precast concrete columns and beams. For the construction to run smoothly, the quantity of frames should be estimated in the planning phase and a plan on production of members should be established in connection with the overall work plan. The algorithm for calculation of the amount of forms used in Green Frame automatically estimates the quantity of forms using the design structure prepared in the design phase. The number and area of forms are calculated using the member size drawn from the structure design. Based on the quantity calculated, the type and area per form size are estimated to be used in preparing BOQ (Bill of Quantity). Thus, the time required for architectural planning and design can be shortened when the algorithm for calculation of the amount of forms is applied. This study is on the basic research of calculating the quantity of forms using the structure design and of the algorithm for calculation of the amount of forms used for production of composite PC members.

  • PDF

Evaluation of Management Performance for Heritage Buildings Case Study: Greco-Roman Museum - Alexandria, Egypt

  • Adel El-Menchawy;Wael Kamel;Amal Mamdouh;Mirna Eskander
    • Architectural research
    • /
    • v.25 no.3
    • /
    • pp.41-51
    • /
    • 2023
  • Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.

Environmental Improvement Develope by Spatial Utilization Pattern of Conventional Market in Small Town -Focused on Geum-wang Market in Chung-buk Province- (소도읍 재래시장의 공간이용유형에 의한 환경개선 - 충북 음성군 금왕재래시장을 중심으로 -)

  • Han, Sang-Ho
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.10 no.2
    • /
    • pp.27-36
    • /
    • 2008
  • This study is progressing or suggests effective space planning for rural village area conventional markets that is planning business market modernization process. Rural village area conventional markets of small scale are inputting a lot of efforts and financial resources for activation. Also, I wish to quote activation plan for rural village area conventional markets that face in stagnation. Studied spatial form and conventional market activation factors by space use special quality of rural village area conventional markets for architectural planning plan presentation. Investigated spatial change for several years that appear in Geum-wang conventional market for this. As a result, could deduce plans of space improvement plan for conventional market space positively. Also, through this study, suggest activation plan of conventional market that display similar space type including Geum-wang conventional market. Therefore, environment improvement of conventional market's type and special quality based on space activation elements and need space environment improvement plan the architecture plan in early planning phase of business.

  • PDF

Optimizing Laser Scanner Selection and Installation through 3D Simulation-Based Planning - Focusing on Displacement Measurements of Retaining Wall Structures in Small-scale Buildings -

  • Lee, Gil-yong;Kim, Jun-Sang;Yoou, Geon hee;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.68-82
    • /
    • 2024
  • The planning stage of laser scanning is crucial for acquiring high-quality 3D source data. It involves assessing the target space's environment and formulating an effective measurement strategy. However, existing practices often overlook on-site conditions, with decisions on scanner deployment and scanning locations relying heavily on the operators' experience. This approach has resulted in frequent modifications to scanning locations and diminished 3D data quality. Previous research has explored the selection of optimal scanner locations and conducted preliminary reviews through simulation, but these methods have significant drawbacks. They fail to consider scanner inaccuracies, do not support the use of multiple scanners, rely on less accurate 2D drawings, and require specialized knowledge in 3D modeling and programming. This study introduces an optimization technique for laser scanning planning using 3D simulation to address these issues. By evaluating the accuracy of scan data from various laser scanners and their positioning for scanning a retaining wall structure in a small-scale building, this method aids in refining the laser scanning plan. It enhances the decision-making process for end-users by ensuring data quality and reducing the need for plan adjustments during the planning phase.

Forestry Administration and Forestry Research in Korea

  • Shim, Sang Yung
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.295-302
    • /
    • 1987
  • Korea is a small country with extremely high population density. Industrialization of the nation resulted GNP per capita of over 2,000$ in 1986 with an inevitable by-product, high level of pollution in many areas. Forest land is now acknowledged as not only a wood production site but also an origin of much more important intangible values, water and clean air, soil conservation, and recreational and scenic values. Mostly devastated forest land from Korean War has been recovered under the strong afforestation drive from the government. The first Forest Development Plan was mostly reforestation phase and the second Forest Development Plan is foundation establishment phase. The third and later Plans are to enlarge economical forest and to maintain sustatined yield phase. Forestry administration as well as forest research certainly played a great role in successful accomplishment of two Forest Development Plans. For effective planning and accomplishment of the third Forest Development Plan close cooperation among policy makers, forest managers and research workers are mostly required.

  • PDF

Mature and Bi-Sexual Phase Gonad Occurrence in Cultured Red Spotted Grouper, Epinephelus akaara

  • Hwang, In Joon;Min, Byung Hwa;Baek, Hea Ja
    • Development and Reproduction
    • /
    • v.24 no.3
    • /
    • pp.225-230
    • /
    • 2020
  • This study reports the presence of mature and bi-sexual phase gonads in red spotted grouper, Epinephelus akaara after less than a year of cultivation in a commercial indoor tank and a net cage. In December 2018, juveniles were placed in an indoor tank and cultured for five months. In June 2019, the fish were transferred to a net cage and cultured until September. The rearing temperatures ranged from 19.86℃-24.65℃ in the indoor tank and 21.86℃-27.65℃ in the net cage. During the net cage culture period, specimens were randomly selected for histological gonad examination. The highest gonadosomatic index (GSI) value was measured in July (3.38±2.53), and dramatically decreased in August (0.44±0.21) and September (0.42±0.30). In July, some mature fish showed signs of vitellogenic stage oocyte development (vitellogenic and oil droplet stage oocytes), but immature fish were in an early developmental stage containing peri-nucleolus stage (PNS) oocytes. Bi-sexual phase gonads containing spermatocytes and spermatids were observed in the lumen and several PNS oocytes. By August and September, most specimens showed early-stage ovary development. However, mature testis (in August) and bi-sexual phase gonads (in September) were also observed. These results provide evidence for early puberty and hermaphroditism in the red spotted grouper.