• 제목/요약/키워드: Working duration

검색결과 373건 처리시간 0.024초

Sleep and Fatigue Among Seafarers: The Role of Environmental Stressors, Duration at Sea and Psychological Capital

  • Hystad, Sigurd W.;Eid, Jarle
    • Safety and Health at Work
    • /
    • 제7권4호
    • /
    • pp.363-371
    • /
    • 2016
  • Background: Seafaring is an inherently stressful environment. Because working time and leisure time is spent in the same confined environment for a prolonged period of time, many stressors present in seafaring can also be conceived of as chronic. We explored the effects of duration at sea, seafaring experience, environmental stressors, and psychological capital (PsyCap) on the sleep quality and fatigue of seafarers. PsyCap is a construct that draws upon ideas from positive psychology and positive organizational behavior, and is intended to capture an individual's psychological capacities that can be developed and utilized for performance improvements. Methods: We collected survey data from a sample of seafarers working in the offshore re-supply industry (n = 402) and a sample of seafarers working on board combined passenger and cargo ships (n = 340). Results: PsyCap emerged as a robust predictor with statistically significant relations to fatigue and sleep quality in both samples. PsyCap also interacted with duration at sea in explaining fatigue in seafarers working on board the passenger and cargo ships. Seafarers on passenger and cargo ships also reported significantly higher levels of fatigue than those working in the offshore re-supply industry. Conclusion: Coupled with emerging research showing that PsyCap is trainable, our results suggest that maritime organizations could have much to gain by being cognizant of and developing routines for continually developing the PsyCap of their employees.

가상기후 시뮬레이션에 의한 공기산정 의사결정 지원모델에 관한 연구 (A Study on the Effective Decision-Making Support Model for Construction Duration by the Hypothetical Weather Simulation)

  • 정석남;이학기
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.74-81
    • /
    • 2000
  • 대부분의 건설현장에서 기후에 대한공기산정은 정확한 자료 없이 현장관리자의 경험과 직관에 의해 일률적인 작업불가능일수를 정함으로써 잦은 공기 조정으로 인한 경제적 손실은 물론 공사 주체들간의 이해관계에서도 많은 문제점을 안고 있다. 따라서 본 연구는 공기에 영향을 미치는 기후를 요소별로 분석하고 가상기후 시뮬레이션을 실시하여 공기산정과 연계함으로써 공정표 작성 시 현장관리자들의 효율적인 공기산정을 위한 의사결정 지원모델을 제시하고, 기대 효과는 다음과 같다. (1) 제한된 과거(1990년-1999년) 기후자료를 요소별로 분석함으로써 단위공종에 대한 기후요소의 영향을 과학적인 방법으로 자료를 제공하였다. (2) 공정계획 시 단위공종에 각 기후요소별로 인자를 추가함으로써 불확실한 기후에 대한 사전 공정계획의 효율성 제고가 기대된다. (3) 기존의 현장관리자들의 경험적이고 직관적인 기후에 대한 대처를 확률분포를 이용한 통계적 처리에 의해 공기산정에 관한 신뢰성 있는 의사결정이 가능하게 되었다. 본 연구에서 제안한 공기산정 의사결정 지원모델은 공정계획 입안 시 불확실한 기후에 대한 과학적인 의사결정에 도움이 될 것이다.

  • PDF

실적자료에 의한 고등학교 시설 공기산정 (The Estimation of Construction Duration for High School Buildings Based on the Actual Data)

  • 권동찬;이찬식
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.138-145
    • /
    • 2004
  • 공사에 소요되는 기간은 시설물의 품질과 비용에 직접적인 영향을 미치지만, 고등학교 시설공사의 경우 경험과 직관에 의거하여 공기를 산정하고 있어 공사수행과정에서 계약당사자 간에 분쟁이 많이 발생하고 있다. 본 논문은 고등학교 시설공사에 소요되는 기간의 산정에 영향을 미치는 다양한 요인을 분석하여 공기 산정기준을 제안하는 것으로, 인천지 역에서 최근에 개교한 고등학교의 실적자료를 수집하여 다중선형 회귀분석 하였다. 회귀분석 결과로 얻은 순 공사기간에 인천지 역의 기후특성을 고려하여 산정한 작업불가능기간을 더하여 총 공사기간을 산출 하였다. 본 논문에서 제안한 공기 산정식은 공사발주 및 계약 시 계약공기를 정확하게 산정 하는데 도움을 줄 수 있을 것이다

동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 - (Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor-)

  • 방종대;한충희;김선국
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.170-178
    • /
    • 2004
  • 공공 발주기관의 동절기 공사불능기간의 운영은 공사기간을 길게 하고, 건설사업비를 증가시킨다. 또한, 건설인력의 활용을 어렵게 하여 근로소득을 감소시킴으로써 국가 경제에도 나쁜 영향을 미친다. 그러므로 골조공사는 동절기에도 시행되어야 할 것이다. 그러나 동절기 골조공사는 평상계절과 동일한 속도로 진행할 수 없기 때문에 별도의 공기산정 방법이 필요하다. 본 연구에서는 공정메커니즘 분석을 통하여 동절기 골조 기준층 1사이클의 실작업일수를 구하고, 5년간의 달력 및 기상청 자료를 이용하여 동절기 5년 평균 비작업일수를 분석하였다. 분석된 실작업일수와 비작업일수를 통합하여 동절기 골조 기준층 1사이클의 적정 공기를 제안하고, 이를 실적자료와 비교하여 검증하였다. 본 연구결과는 동절기 골조공사의 공기산정에 유용하게 활용될 수 있을 것이다.

철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구 (A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House)

  • 천영기;이계욱;김양택;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.531-534
    • /
    • 2001
  • 프로젝트 초기단계에 공기산정이 적절히 이루어져야만 프로젝트 진행과정에서 인력, 자재, 장비 등을 효율적으로 이용할 수 있으며 자금을 적절하게 배분할 수 있다. 그러나 아직 국내에서는 기준으로 삼을 만한 공기산정 기준이 없는 실정이다. 본 연구에서는 현재의 불명확한 공기산정방식을 개선함으로써 프로젝트 초기단계에서 적정공기를 예측하고 타당한 공정계획을 수립할 수 있도록 합리적이고 체계적인 공기 산정기준을 제시하고자 한다. 이를 위하여 본 연구에서는 기존 산정기준의 비교 분석을 통하여 개선방향을 도출하고, 현장기술자들과의 면담조사, 현장실험, 기존 연구자료 등을 활용하여 적정공기 산정기준을 제시하였다.

  • PDF

임직원 근로조건과 기업생존 (Working Conditions and Firm Survival)

  • 조승모
    • 아태비즈니스연구
    • /
    • 제9권4호
    • /
    • pp.157-180
    • /
    • 2018
  • This paper empirically analyzes how working conditions of employees and executives affect Korean companies' survival. To this end, a survival analysis based on the accelerated failure time model is conducted from the end of December 2012 to the end of September 2018 on the 2012 year-end financial data for corporations whose common stocks have ever been listed either in the KOSPI market or in the KOSDAQ market with fiscal year ending at the end of December. The analysis shows that the average wage level per employee and the number of executives relative to the number of employees threaten while the average duration of service for female employees prolongs firm survival. Here, the average wage level per employee has turned out to worsen firm survivability regardless of the gender of employees in question while the average duration of service improves firm survivability only in case the employees are female: the average duration of service for male employees or the entire employees has turned out not to have any statistically significant influence on firm survival. The average compensation per executive and the percentage of temporary employees have turned out not to have any statistically significant influence on firm survival while the percentage of female employees has shown statistically significant positive influence on firm survival in some, although not all, models employed in our study. These results are expected to be a good reference in the course of our reaching agreements regarding the improvement of working conditions either between firms and employees or among the members of the entire society.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

방전가공기의 방전 펄스 시간의 퍼지제어 (Fuzzy Control of Discharge Pulse Duration for Electrical Discharge Machinery)

  • 이제희;박호준;양직현;허욱열;이선우;안성광
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.1167-1169
    • /
    • 1996
  • As electrical discharge machinery(EDM) is industrial process which is manufactured by discharge energy, by producing discharge, EDM process finished material at the little micrometer air gap. Especially, EDM is used for the characteristic of heat-resisting material, it puts to use air-space industrial element, confusing shaping material such as jet engine, rocket elements. Working performance. is changed by environment of working, discharge current voltage and duration of discharge pulse. Evaluation of performance working is work speed, clearance smoothing of product surface, wasting of pole. In this paper, this machine is compensated by adaptive controller which corrects the weak points of classical machine which is observed and operated working condition by user in hands. The previous purpose is main object in this thesis. The adaptive controller automatically detect abnormal condition and working conditions. To improve performance, surface smoothing and working speed, the adaptive controller uses fuzzy control strategy. To evaluate performance, this controller is implemented by microprocessor i80c196 and is applied real experimental machine.

  • PDF

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

보건소 방문간호사의 직무만족 관련요인 (Job Satisfaction related Factors of Home Visiting Nurses in the Public Health Centers)

  • 김이순;정인숙;이정희;박형숙
    • 가정간호학회지
    • /
    • 제9권2호
    • /
    • pp.129-137
    • /
    • 2002
  • Purpose: This study was aimed to investigate predictors of job satisfaction of home visiting nurses at the 16 public health centers in Busan. Method: There are two groups of independent factors: non-work related (age. educational level. working duration as nurses in hospitals. certificate). and work related (working duration as nurses in public health centers. working duration as home visiting nurse. position. number of households visited per week, workload, cooperation among staff, support by supervisors, supply of vehicles, supply of materials). The participants were 88 home visiting nurses from 16 public health centers in Busan. Data were collected with self-administrated questionnaires and analysed using an univariate logistic regression and multiple logistic regression analysis. Result: support by supervisors (good vs not-good, OR=3.70. p=0.025), and supply of materials (good vs not-good, OR=3.33, p=0.038) had significants effects on job satisfaction. Conclusion: The results were similar to those of other studies on the predictors of job satisfaction of clinical nurse at hospitals, and were helpful in developing nursing interventions to increase job satisfaction among home visiting nurses in public health centers. Busan.

  • PDF