• 제목/요약/키워드: Work-in-Process Management

Search Result 1,890, Processing Time 0.03 seconds

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park (울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석)

  • 성백진;이재근;최종희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.6
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

Discovering Temporal Work Transference Networks from Workflow Execution Logs

  • Pham, Dinh-Lam;Ahn, Hyun;Kim, Kwanghoon Pio
    • Journal of Internet Computing and Services
    • /
    • v.20 no.2
    • /
    • pp.101-108
    • /
    • 2019
  • Workflow management systems (WfMSs) automate and manage workflows, which are implementations of organizational processes operated in process-centric organizations. In this paper, wepropose an algorithm to discover temporal work transference networks from workflow execution logs. The temporal work transference network is a special type of enterprise social networks that consists of workflow performers, and relationships among them that are formed by work transferences between performers who are responsible in performing precedent and succeeding activities in a workflow process. In terms of analysis, the temporal work transference network is an analytical property that has significant value to be analyzed to discover organizational knowledge for human resource management and related decision-making steps for process-centric organizations. Also, the beginning point of implementinga human-centered workflow intelligence framework dealing with work transference networks is to develop an algorithm for discovering temporal work transference cases on workflow execution logs. To this end, we first formalize a concept of temporal work transference network, and next, we present a discovery algorithm which is for the construction of temporal work transference network from workflow execution logs. Then, as a verification of the proposed algorithm, we apply the algorithm to an XES-formatted log dataset that was released by the process mining research group and finally summarize the discovery result.

IMPROVEMENT OF TACT SCHEDULE MANAGEMENT PROCESS FOR THE FINISH WORK OF APARTMENT HOUSES

  • Joo-Young Jung;Sang-Ho Yoon;Kyung-Kook Lee;Chang-Gyo Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.554-562
    • /
    • 2007
  • This study determined tact process paths by separating the finish works according to the properties of work areas and work relations in order to apply the tact schedule management to the finish works. In addition, by suggesting preparing and sharing the workflow charts, the experiments can be shared between the executors and any possible frictions between the specialist works can be identified in advance. In addition, any errors on the plan can be reviewed and modified through the measurement stage of tact plan attainment rate. The process of tact schedule management is improved with such tools and methods and the efficiency of the process through the application of cases was verified.

  • PDF

A study of safety management assessment method of unit working process (단위작업공정의 안전관리 평가방법에 대한 연구)

  • Lee, Kang-Bok;Kim, Geon-Ho;Kim, Yoon-Sung;Kwon, Sang-Myun;Lee, Jai-Won;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.2
    • /
    • pp.1-8
    • /
    • 2007
  • Safety check-up and individual education, safety status wishes to present included safety assessment table for safety management assessment system construction about unit work process in Study. Safety management assessment table gives each grades about worker of unit work process, safety check-up, education, management and identifies merits and demerits of unit work process, it is that propose safety management assessment system that can reduce accident occurrence possibility.

A Study of Improving Construction Process by Work Structuring (Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구)

  • Na Kyung-Chul;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-427
    • /
    • 2001
  • There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.

  • PDF

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

The Study of Logistics Process Standardization (물류 프로세스 표준화 연구)

  • Park, Sun Ho;Park, Soo Min
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.1
    • /
    • pp.173-183
    • /
    • 2011
  • Global logistics including Korea had developed at various fields through the developed IT technology. In addition, in changing into Internet based digital economy times, economic and logistics activities became extending into worldwide over the cross-border. Logistics activity performed by off-line rapidly changed in real environment. But, unfortunately business process modeling about the whole logistics was not happened, even though process modeling had done by transport stages or logistics entities. Therefore, it is difficult to grasp the whole logistics. Additional cost and time was requested due to no association between logistics entities and invisibility. So, this paper has to be process modeling for logistics industry domain. For objective modeling, work area shall be divided and it extracts general work process per each area. And then it defines subprocess of general work process. Cargo tracking in logistics industry domain means to grasp the status and present states at transportation or storage stage. This paper defines business process and data model for electronic processed work area using the UN/CEFACT standard modeling methodology.

Safety characteristics deployment of the unit working process (단위작업공정에 대한 안전특성 전개)

  • Kim, Soon-Jin;Yang, Hyun-Hoo;Lee, Kang-Bok;Kim, Geon-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.1-7
    • /
    • 2007
  • A study wish to present relation of safety characteristic deployment, which has the safety demand, safety characteristic, protection characteristic, safety regulation, safety education of unit work process. Safety characteristic deployment will be used in safety management education system design with a method of safety management system construction of unit work process.