Purpose: This study was to understand foreign workers' experiences exposed hazard chemical materials in korean industry. Method: The research subjects were 92 foreign workers worked in seoul, namyangju, ansan, suwon, pocheon, incheon, jincheon, and daejeon. It was that grounded theory method as qualitative approach was applied with in-depth interview, recording and dictation, and collected data was analysed line-by-line by research teams. The analysis process of in depth interview data was three phase. Results: The first phase was that find out meaningful data and confronted data for meaningful data was 53 meaningful items. The second phase was coding process of meaningful data, total coding items were 9, difficulty of new environment, existence of health hazard factors originated in work, performance of basic health management, management of hazard materials in work-site, self care of hazard materials in work-site, discrimination of disaster-compensation originated in work, perception of work stress, motivation of leaving position, satisfaction for present life. The third phase was 5 adaptation process, copying phase for new environment, management phase for health hazard factors, health change phase, life change phase, illegal stay phase. Conclusion: In summary, as a results it was concluded that foreign workers was experienced new environment and then has various problems in working site. But these evidences were not different from korean workers basically, undoubtedly reality of a korean small and medium enterprise. And foreign workers with long time stay have had many health problems probably, but they have want to long stay and so reach an unexpected result, illegal long stay. Therefore, we should make efforts for adequate foreign workers' health management at work-site and overall life in governmental and industrial nursing level.
건설공사의 시공공정을 관리자의 경험적 판단에 의하여 작업팀을 구성하여 운영하면, 시공공정의 진행이 비효율적으로 될 가능성이 많다. 그러나 시공계획단계에서 모의조작을 통하여 자원할당, 공사비, 공사기간의 최적 안을 산출하면 시공공정을 정량화하여 효율적인 운영을 할 수 있다. 본 연구에서는 시공공정을 계획할 때 작업팀 운영의 변화에 따른 자원할당 변동치, 자원 손실비, 총공사비, 공사기간의 최적 안을 모의조작 할 수 있는 수식모형의 시안 식을 제안하였다. 제안된 수식모형을 검증하기 위하여 시공공정의 수평작업역과 수직작업 역이 각각 상이하게 구성된 공동주택 골조공사에 적용하여 시현하였다. 본 연구에서 제시된 수식모형을 적용하여 모의 조작을 실시한 결과가 실제 사례공사에서 적용된 작업팀의 운영실적보다 효율화를 달성하였다.
Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.
There is boner process of stone manufacturing to become quality down of stone to consolidated micro crack appearance of stone surface and biotite by fire that is to be route process in stone surface by flame of LPG. And then, it is develop that stone surface process equipment by automation for the work method of boner process can be substitute work method by shotball blasting. To developement of equipment, There is to be down noise and dust. Acording to remove calamity growth hazardous substance in the work environment, there is to solve workplace avoidance factor. We have taken Taguchi's parameter design approch, specifically orthogonal array, and determined the optimal levels of stone surface through analysis of the experimental results using SIN ratio.
This paper considers a new flow-shop scheduling problem where a different WIP (work-in-process) state has different weight on the duration time. For the two machine case, the recognition version is NP-Complete in the strong sense. Several special cases are solved by different polynomial time algorithms. Finally, we develop a heuristic and provide an upper-bound on relative error which is tight in limit.
Printed circuit board (PCB) assembly line configuration is characterized by very long set-up times and high work in process (WIP) inventory level. The scheduling method can significantly reduce the set-up times and WIP inventory level. Greedy sequence dependent scheduling (GSDS) method is proposed based on the current methods. The proposed method is compared with the current method in terms of three performance measures: line throughput, average WIP inventory level, and implementation complexity.
정부기관에서 공통적으로 사용하는 표준화된 시스템이자 정부기관의 일하는 과정, 의사결정 등이 남는 주요 도구인 업무관리시스템은 결재문서 중심의 문서형 기록 생산이 주를 이루고 있어 다양한 유형의 기록을 포괄하지 못하고 있다. 새로운 디지털 유형 기록의 생산, 다양한 협업 소프트웨어와 업무시스템의 등장, 재택근무 등 변화하는 환경에서 정부 업무관리시스템이 나아갈 방향을 고민할 필요가 있다. 본 연구는 경쟁력 있는 민간기업의 업무시스템과 활용 방식을 분석하고, 정부 업무관리시스템인 온-나라 2.0의 사용 현황 분석과 업무담당자 인터뷰를 통해 어떠한 차이가 있는지 살펴보는 것이다. 더하여 디지털 혁신에 조응하고 업무의 설명책임성과 효율성을 제고할 수 있는 방향으로 개선해야 할 기능과 정책적 방향을 제언하고자 한다.
Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
국제학술발표논문집
/
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.556-560
/
2011
Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.
Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.
우리나라의 최근의 건설공사의 형태를 보면 초고층 아파트, 대형 주상복합 건물 등 대형주거용 건축물들이 등장하고 입다. 이러한 건설공사의 대형차 추세에 따라 공사기간, 공사비용 등이 크게 증가하였다. 이에 공사기간 및 공사비용을 절약하고 프로젝트의 성공을 위한 건설관리 기법들의 연구가 활발히 진행되고 있다. 본 연구에서는 초고층 주거건축의 마감공사 중에서 공사규모, 자재의 양중 측면에서 많은 부분을 차지하고 있는 가구공사의 관리체계를 정립하기 위하여, 적시생산(Just-In-Time)방식과 린건설(Lean Construction)의 개념을 도입하였다. 생산성 향상을 위한 위의 두 가기 원리를 이용하여 가구공사의 프로세스를 분석하고 그에 따른 개선방안을 제시하고자 한다. 이러한 분석과 개선방안의 제시는 마감공사의 원활한 흐름을 유도할 수 있으며, 또한 공사기간 및 공사 비용을 절약함으로써 프로젝트의 성공에 기여할 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.