• 제목/요약/키워드: Work-in-Process Management

검색결과 1,890건 처리시간 0.034초

국내 하도급의 근로자 보호방안에 관한 연구 (Subcontractors Protection Scheme for Harmful Works in Korea)

  • 김병석
    • 대한안전경영과학회지
    • /
    • 제10권4호
    • /
    • pp.153-158
    • /
    • 2008
  • It compared subcontractor with contractor that are wages, the labor hour and labor condition of the work environment back are inferior relative. The subcontractor which basically the contract workers evade the dangerous process or the difficult work, the dirty work back what is called 3D the case which does to keep a business is many. so With life it will be threatened consequent health directly. The possibility where the subcontractor will be exposed to danger work came to be high. Consequently it prevents the subcontract which danger work is insensitive from this research and immediacy of the subcontract workers who is weak hygiene circumstance complement the plan it will be able to secure the immediacy safety&health subcontract workers, substantially to prepare in the hazard subcontract proprietor. Thus, this paper aims at presenting countermeasures to substantially secure safety and health of subcontractors by preventing ill-advised subcontracting of harmful and hazardous operations and imposing partial occupational safety and health responsibility to employers to enhance safety and health environment of subcontractors.

SaaS기반의 건설공정전송 및 안전관리 시스템 (SaaS-based construction process transfer and Safety Management System)

  • 김의룡;정수성;김영곤
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2015년도 춘계학술대회
    • /
    • pp.735-737
    • /
    • 2015
  • 본 논문은 SaaS(Software as a Service) 기반의 건설공정전송 및 안전관리 시스템을 건설작업에 활용하여 공정관리와 안전관리에 적용함으로써 초고속 무선인터넷을 통해 이루어지는 다양한 유형의 건설 공정에 대한 일정 및 결과와 안전관리에 대한 체계적인 수단을 확보할 수 있고 공정 내에서 이루어지는 모든 관리 체계를 신속하고 정확하게 관리할 수 있다.작업자는 스마트폰을 활용하여 감독관으로 작업을 지시받고 작업의 현황과 결과를 보고한다. 또한 비상상황 시 감독관에게 보고를 즉시 할수 있으며 일정시간 이상 스마트 폰 진동 발생이 없는 경우 작업자에게 위험 상황을 체크하게 된다. 감독관의 경우 수립된 공정별 업무를 지시하고 결과를 확인하며 현장 작업자 위험 상황의 조치명령을 내리고 미흡한 부분을 제시함으로써 만족되는 결과를 얻게 된다. 또한 소프트웨어(서버)의 경우 작업에 관련된 모든 자료를 저장하고 회원관리 및 보안을 담당하였다.

  • PDF

정보속성이 재난관리 업무 성과에 미치는 영향에 관한 연구 (A Research on the Information Quality of influence on work performance in Disaster Management Operation)

  • 정덕훈;심형섭
    • 한국방재학회 논문집
    • /
    • 제8권5호
    • /
    • pp.85-91
    • /
    • 2008
  • 최근 발생하는 재난의 규모와 발생유형이 대형화, 복잡화, 다양화로 진행됨에 따라, 수많은 인명과 재산 피해를 가져올 뿐만 아니라 국가의 위기 상황으로 확산되고 있기 때문에 체계적인 재난관리체계가 요구된다. 체계적인 재난관리를 수행하기 위해서는 무엇보다도 정보의 공유와 협조체계가 필요하며, 전제조건으로는 정보가 중요한 자원이라는 인식이 선행되어야 한다. 재난과 같은 혼란 상황에서 사회의 질서를 유지하고 혼란으로부터 탈피하는데 가장 중요한 역할을 하는 것은 올바른 정보라 할 수 있으며, 올바른 정보는 높은 불확실성과 상호의존적인 재난상황에서 인간의 생명과 재산을 보호하며, 재난 발생 이전의 정상적인 상태로 복구하는데 있어서 핵심적인 역할을 한다. 따라서 본 논문에서는 정보속성과 재난관리 업무성과간의 관계를 검증하기 위하여 Wang과 Strong(1996)의 4가지 정보속성을 설정하고, 재난관련 담당자들에서 설문지를 통해 통계적으로 업무성과간의 관계 여부를 검증하였다.

국내 건설 현장의 철근공사 실태조사에 관한 연구 (The Study On The Actual Condition Of Rebar Work In Korean Building Construction)

  • 이응균;박우열;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

TOC의 TP를 활용한 자동차부품제조업체의 산업안전활동에 관한 사례 연구 (A Case Study on Activity of Industrial safety Work Environments for Auto-part Company using Thinking Process of TOC)

  • 김태철;이준수;정병호
    • 대한안전경영과학회지
    • /
    • 제8권3호
    • /
    • pp.87-101
    • /
    • 2006
  • This paper was concerned about case study for preventing WMDSs(Work-related Musculoskeletal Disorders) by using Thinking Process of TOC(Theory Of Constraints), Unfortunately, the number of WMDSs are rising steadily in auto-part manufacturer. These WMDSs have on worse and worse influence not only on the competition of enterprise but on the life quality of a worker. The research results are helpful to establish the preventing WMDSs and improvement of workplace environments for small-medium sized auto-part company.

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF

형상관리기법을 활용한 대형 프로젝트 정보화 전략개발 (A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project)

  • 원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

생산효율화를 위한 설비보전관리 지원시스템에 관한 연구 -설비보전정보시스템을 중심으로- (A Study on the Equipment Maintenance Management Support System for Production Efficiency)

  • 송원섭
    • 산업경영시스템학회지
    • /
    • 제21권48호
    • /
    • pp.279-289
    • /
    • 1998
  • This study deals with the schemes of design, plan and operate maintenance management support systems and with the engineering approach for the solutions to build the maintenance management for the production efficiency. Maintenance Management Information System(MMIS) is the task that must focus on machinery historical data and planned maintenance action. Also the efficient supporting system in a maintenance management is achieved by database which is based on process of machinery's failure history. Designing method of maintenance management information system, maintenance modules are consisted of six factors ; machinery's historical data, lubrication control, check sheet, repair work, availability report, and performance report(control board and detailed reports), and then operators can rapidly utilize data in work place. In the implementation of designed model, program coding has been developed by Visual Basic 3.0. Data insertion, deletion and updating which perform menu screen is implemented by reading data from database. Implementation model based on LAN environment and related data is stored in Microsoft DBMS.

  • PDF

P2P 환경에서 문서관리 모니터링 시스템 (Document Management Monitoring System in P2P Environment)

  • 김종태;김동근;맹승렬
    • 한국산학기술학회논문지
    • /
    • 제14권3호
    • /
    • pp.1402-1408
    • /
    • 2013
  • 문서관리는 기업 내의 프로젝트의 업무수행을 원활히 하기 위해 특히 중요하다. 소규모 프로젝트의 경우에, 문서관리 기준이 협업부서 사이에 다른 경우가 많으며, 업무 프로세스에 대한 문서구조 변경이 프로젝트 기간 동안 빈번히 일어난다. 본 논문은 P2P 기반의 문서 모니터링 시스템을 설계 및 구축을 제안한다. 제안된 문서관리 모니터링 시스템은 소규모 프로젝트의 특정 작업 프로세스 및 시간제약을 보완하며, 작업 프로세스를 중심으로 문서의 생성, 공유 및 배포의 상태를 효율적으로 모니터링 할 수 있다. P2P를 사용함으로써 소규모 프로젝트에서 저비용으로 구축하여 사용할 수 있는 장점이 있다.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF