Korean Journal of Construction Engineering and Management
/
v.7
no.6
/
pp.165-174
/
2006
Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.22-32
/
2017
Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.
Korean Journal of Construction Engineering and Management
/
v.8
no.3
/
pp.142-149
/
2007
A ubiquitous environment in construction should be developed integrating hardware and software systems. The objective of this paper is to study the feasibility of applying the RFID technology to the concrete pour process, and improve the effectiveness of data exchange A pilot system of u-CPS (Ubiquitous Concrete Pour System) has been developed to test the feasibility. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.
Proceedings of the Korea Contents Association Conference
/
2007.11a
/
pp.75-79
/
2007
ISO 9001 International Quality Management System is international standard for develop a quality management system of organization. More efficient quality management supports a good environment for customer satisfaction to product and service that anytime. So, Korea Institute of Science and Technology Information (KISTI) was certificated ISO 9001:2000 Quality Management System in 2003 up to now. That is the first time on information flow and service for science and technology. For more efficient quality management, KISTI built a KQMS online system based on web. We obtain a improvement of customer satisfaction and efficiency of work, reduction of work processing time using KQMS.
Journal of Korean Society of Archives and Records Management
/
v.21
no.4
/
pp.183-200
/
2021
With the revision of the Public Records Management Act in 2020, it has become possible to appraise long-term records more than 30 years old in the record center. However, there was no discussion on the appraisal process except for the revision of the Public Records Management Act. This study aimed to propose a process for appraisal of long-term records in the record center, focused on the roles and functions of the record center, archives, and central archives. To confirm the status and problems of the records appraisal process, we analyzed record management standards and interviewed 4 archivists who have been working as specialists for over 10 years. Based on the analysis results, the appraisal process for long-term records in the record center was redesigned in consideration of the functions and roles of the record center, archives, and central archives.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.64-71
/
2004
A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.
The purpose of this study is to understand the mediating effect of self-leadership in the process of understanding the effects of nursing job performance and job satisfaction in the nursing work environment perceived by nurses. In this study, nurses who worked for more than one year at three general hospitals located in Province A. Total of 225 data were used for the final analysis. Date analyzed using the SPSS 22.0 program by t-test, ANOVA, Pearson's correlation coefficient and hierarchical regression analysis. Self-leadership was found to play a partial mediating role in the relationship between nursing work environment and nursing job performance(z=4.30, p<.001) and between nursing work environment and job satisfaction(z=3.70, p<.001). Therefore, in order to improve nursing job performance and job satisfaction, it will be necessary to establish a management plan that can improve the nursing work environment and improve self-leadership.
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.58
no.4
/
pp.367-373
/
2022
We analyzed work safety risk factors, which are likely to occur during fishing in gillnet fishing vessels using the written verdict of the Korea Maritime Safety Tribunal from 2016 to 2020, and considered work safety management. Of the total of 37 fatal accidents, three cases in the East Sea, six cases in the South Sea, and 28 cases in the West Sea were very frequent. The accident rate per vessel by sea area (%) was 0.08% in East Sea, 0.12% in South Sea, and 0.40% in the West Sea. Based on the East Sea, the number of fatal accidents was 1.6 times higher in the South Sea and 5.4 times higher in the West Sea. Six cases (16.2%) occurred during departure and preparation for fishing in the fishing process, and all other 31 cases (83.8%) occurred during fishing operation. In the order of accident types, 21 cases (56.8%) of being struck by object, eight cases (21.6%) of contact with machinery and six cases (16.2%) of falls from height were found to be fatal accidents in gillnet fishery. Human factors, such as fishers' carelessness and negligent safety management by captain accounted for 27 cases (73.0%) of the main cause, and 35 cases (94.6%) of the secondary cause. In addition to human factors such as fisher's carelessness and negligent safety management by captain, mechanical factors, environmental factors and management factors must be improved together to reduce human casualties. These results are expected to be utilized as basic data for reducing safety accidents during the work of fishers.
Korean Journal of Construction Engineering and Management
/
v.5
no.5
s.21
/
pp.65-75
/
2004
Labor management has been considered as an important task in construction industry. However, labor management has not yet been systematically performed because of the wide variety of factors of construction industry such as the field work, the complexity of the work process, the daily employment. Most of the present labor managements are performed to collect the information of the number of labors input during the work period, and to calculate labor cost. The information of activities performed by labors can be effectively used to analyze project status related to schedule, cost and productivity, but the present labor management systems are not based on the activities. The main objective of this research is to develop a labor information management system using IT tools in order to measure the number of labors input on the activities, and to convert the labor information into productivity data. It is anticipated that the effective use of the developed system would be able to effectively assist the scheduling and cost management of a project.
Objective: This study aims to analyze the characteristics of occupational accidents and injuries of telecommunications line and cable workers by type of workplace and operational process of cabling service and to provide baseline data in establishing the preventive policies for occupational accidents and injuries. Background: In order to set up the preventive policies for occupational injuries and illness systematically, the accident analysis by industry should be preceded. To establish more effective policies, it should be done by occupation for persons who work in various kinds of occupation rather than by industry for persons who do in the same occupation. Method: In this study, the 176 occupational accidents and injuries were classified by type of workplace - indoor (inside building) and outdoor (at the top of utility pole, in a manhole, or in the fields) - and also done by operational process involved at the time of the accident. By analyzing the characteristics of occupational injuries and illness by type of workplace and operational process, respectively, this study can be helpful in establishing the preventative policies for occupational accidents and injuries. Results: The characteristics of occupational accidents and injuries by type of workplace showed that there were differences in terms of accident rate between indoor and outdoor on age of the injured, while not on employment-size and work experience of the injured. In addition, the characteristics on accident type, agency of accident, parts of body affected, and operational process between indoor and outdoor workplaces were statistically different each other. Conclusion and Application: The findings of occupational accidents' characteristics can be applied to the establishment of systematic preventative policies for occupational accidents of telecommunications line/equipment workers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.