• 제목/요약/키워드: Work-Site Application

검색결과 259건 처리시간 0.023초

지하수 오염우려지역 실태조사 보고서 기반의 사전 부지개념모델 구축 (Construction of a Preliminary Conceptual Site Model Based on a Site Investigation Report for Area of Concerns about Groundwater Contamination)

  • 김주희;배민서;권만재;조호영;이순재
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제27권spc호
    • /
    • pp.64-74
    • /
    • 2022
  • The conceptual site model (CSM) is used as a key tool to support decision making in risk based management of contaminated sites. In this work, CSM was applied in Jeonju Industrial Complex where site investigation for groundwater contamination was conducted. Site background information including facility types, physical conditions, contaminants spill history, receptor exposure, and ecological information were collected and cross-checked with tabulated checklist necessary for CSM application. The CSM for contaminants migration utilized DNAPL transport model and narrative CSMs were constructed for source to receptor pathway, ecological exposure route, and contaminants fate and transport in the form of a diagram or flowchart. The component and uncertainty of preliminary CSM were reviewed using the data gap analysis while taking into account the purpose of the survey and the site management stage at the time of the survey. Through this approach, the potential utility of CSM was demonstrated in the site management process, such as assessing site conditions and planning follow-up survey work.

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

산업장 건강증진 사업의 이론과 실제 (The Theory and Application of Health Promotion Program at Work Sites)

  • 정영일;이현경
    • 보건교육건강증진학회지
    • /
    • 제16권1호
    • /
    • pp.203-232
    • /
    • 1999
  • This study reviewed the, reference of health promotion program and investigated the status of health promotion program at work sites in U.S.A. Good health promotion program is essential for both employees and employers to reduce morbidity rate, to promote productivity and to enhance quality of life and so on. Health promotion aimed at modifying unhealthy life-styles by building awareness, knowledge, skills, and interpersonal support. And health promotion cycle is resemblance to the plan-do-check-act. The major contents of this study are briefed following as : 1) Links between life-style, environment, and health 2) Effect of work sites health promotion effort 3) Prevalence and contents of work site health promotion programs 4) Health promotion process 5) Program framework and structure 6) Stages in the health promotion cycle 7) Approaches for modifying organizational stressors In addition this, the survey was conducted to aim diagnosing the status of health promotion p개gram in work sites in Korea. The main finding-outs are summarized as follows: 1) In 4 large size work sites, there are working with 1 doctor in all work sites, 1 nurse per 3,000 employees and other health related professionals. They have clinic office(4 work sites), gymnasium(2 work sites), and other many facilities like physical therapy center. And only one company have a wellness clinic center. All employees use to exercise health gymnastics in terms of 5 minutes regularly 2 times in a day. 2) In 4 middle size work sites, there are no doctor, 1 nurse and 1 nutritionist in all work sites. They have also clinic, physical therapy center(1 work site), and all employees exercise health gymnastics regularly 2 times in a day too.

  • PDF

3차원 지형공간정보모델기반 토공사 계획 및 관리에 미치는 영향요인 관리 애플리케이션 연구 (A Study on 3D Geospatial Information Model based Influence Factor Management Application in Earthwork Plan)

  • 박재우;윤원건;김석수;송재호
    • 한국산업융합학회 논문집
    • /
    • 제22권2호
    • /
    • pp.125-135
    • /
    • 2019
  • In recent years, the digital transformation age represented by the "Fourth Industrial Revolution", which is a universalization of digitalization across all industries, has become a reality. In the construction sector in 2018, the Ministry of Land, Infrastructure and Transport established the Smart Construction 2025 vision and established the 'Smart Construction Technology Roadmap' aiming to complete construction automation by 2030. Especially, in the construction stage, field monitoring technology using drones is needed to support construction equipment automation and on-site control, and a 3D geospatial information model can be utilized as a base tool for this. The purpose of this study is to investigate the factors affecting earthworks work in order to manage changes in site conditions and improve communication between managers and workers in the earthworks plan, which has a considerable part in terms of construction time and cost as a single type of work. Based on this, field management procedures and applications were developed.

도심지 근접시공의 자동계측응용 (Application of Automated Measuring System for the Underground Construction in Urban Area)

  • 남순성;정상용
    • 화약ㆍ발파
    • /
    • 제15권2호
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

현장 관리자 중심의 건축공사 가설기술 표준분류체계구축 (Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager)

  • 김민정;박준모;김옥규;최병주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

QR Code를 활용한 배관 스풀관리용 안드로이드 어플리케이션 설계 및 구현 (Design and Implementation of Piping Spool Management Android Application using QR Code)

  • 전상문;김경수
    • 디지털콘텐츠학회 논문지
    • /
    • 제13권4호
    • /
    • pp.609-616
    • /
    • 2012
  • 플랜트 프로젝트의 배관공사는 플랜트 설비의 중요한 공종(工種)이다. 종래에는 시공 현장에서 작업자가 수백장의 배관스풀 도면과 문서를 가지고 다니면서 설치 확인 내용을 기록하고, 현장사무실에서 기록한 사항을 다시 시스템에 입력 혹은 문서작성을 해야 하기 때문에 중복 업무가 발생하여 배관 공사의 효율성 저하 및 공기지연을 초래한다. 또한, 각각 다른 장소에서 각 다른 작업자가 설치 이력 관리 업무를 수행하기 때문에 통합적인 공정관리를 하려면 전체적인 공기가 많이 소요된다는 문제점이 있다. 따라서 본 논문에서는 배관스풀마다 서로 다른 QR Code를 부착하고 배관공사중에 배관스풀의 이력을 유무선망과 연계하여 QR Code로 통합 관리하는 안드로이드 어플리케이션을 구현하고자 한다.

투수콘크리트 현장품질관리 지침서 개발에 관한 연구 (A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete)

  • 고은정;고은주;석호중;이승혁
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

A Study on Application of Ethnography for the User Research in Designing Korean Express Train

  • Kim, Hyun-Jeong;Lee, Kyn-Pyo
    • 한국감성과학회:학술대회논문집
    • /
    • 한국감성과학회 2000년도 춘계 학술대회 및 국제 감성공학 심포지움 논문집 Proceeding of the 2000 Spring Conference of KOSES and International Sensibility Ergonomics Symposium
    • /
    • pp.389-393
    • /
    • 2000
  • Ethnography, a major research method in Anthropology, has been recently applied in human-centered design research. Since ethnography has empirical, naturalistic, holistic and eclectic characteristics, it is needed a guideline to apply ethnography into design research in accordance with a characteristic of project. Design project in which ethnography is applied can be categorized by two criteria; degree of newness of project goal(existing user-potential user) and limitedness of worksite(site-oriented-work-oriented). Among work-site activities, technology in use, and user group culture, it should be decided which content to content to focus more than others and thus what kinds of research techniques to apply in the ethnographic research.Case study was to design an interior of a Korean express train. This project is site-oriented and has an existing-potential users. Therefore, video ethnography was effectively applied to obtain chronological data of activity potential users. Therefore, video ethnography was effectively applied to obtain chronological data of activity flow, and participant observation was applied to obtain statistical data of synchronous activities. Case study shows a concrete process example of how to apply ethnography into design research.

  • PDF

AUTOMATIC DATA COLLECTION TO IMPROVE READY-MIXED CONCRETE DELIVERY PERFORMANCE

  • Pan Hao;Sangwon Han
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.187-194
    • /
    • 2011
  • Optimizing truck dispatching-intervals is imperative in ready mixed concrete (RMC) delivery process. Intervals shorter than optimal may induce queuing of idle trucks at a construction site, resulting in a long delivery cycle time. On the other hand, intervals longer than optimal can trigger work discontinuity due to a lack of available trucks where required. Therefore, the RMC delivery process should be systematically scheduled in order to minimize the occurrence of waiting trucks as well as guarantee work continuity. However, it is challenging to find optimal intervals, particularly in urban areas, due to variations in both traffic conditions and concrete placement rates at the site. Truck dispatching intervals are usually determined based on the concrete plant managers' intuitive judgments, without sufficient and reliable information regarding traffic and site conditions. Accordingly, the RMC delivery process often experiences inefficiency and/or work discontinuity. Automatic data collection (ADC) techniques (e.g., RFID or GPS) can be effective tools to assist plant managers in finding optimal dispatching intervals, thereby enhancing delivery performance. However, quantitative evidence of the extent of performance improvement has rarely been reported to data, and this is a central reason for a general reluctance within the industry to embrace these techniques, despite their potential benefits. To address this issue, this research reports on the development of a discrete event simulation model and its application to a large-scale building project in Abu Dhabi. The simulation results indicate that ADC techniques can reduce the truck idle time at site by 57% and also enhance the pouring continuity in the RMC delivery process.

  • PDF