• Title/Summary/Keyword: Work-In-Process

Search Result 8,723, Processing Time 0.039 seconds

An Analysis of Hindrance Factors of Process Capability (공정능력(工程能力)의 저해요인분석(沮害要因分析))

  • Song, Seo-Il;Hwang, Ui-Cheol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.2
    • /
    • pp.131-140
    • /
    • 1985
  • This paper analyses the hindrance factors of process capability. The reasons of the products which are out of specification can be accounted on the hindrance factors. An $\hat{e}$nquete which consists of 4 categories such as technical knowledge, work performance, work environment, and human relations at home and office, is prepared and handed out to 1000 works to get information. And Spearman's Correlation Coefficient (${\rho}s$) is adapted as an anaysis and consideration criterion. In consequence, it is revealed the next 4 factors become the vital hindrance factors of process capability: (1) unskillful working (2) over load for operators (3) imperfect work environment (4) incoordination of human relations And the correspondent policy can be summarized as follows: (1) propagation & fixation of I.E. techniques (2) harmonization of human relations (3) improvement of work environment (4) strengthening the T.W.I.

  • PDF

Prioritization of Potential Technology for Establishing a Safe Work Zone Environment (안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정)

  • Kim, Jin Guk;Yang, Choong Heon;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

Business Process Efficiency in Workflows using TOC

  • Bae Hyerim;Rhee Seung-Hyun
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2003.11a
    • /
    • pp.55-63
    • /
    • 2003
  • Workflow Management System (WFMS) is a software system to support an efficient execution, control and management of complex business processes. Since traditional commercial systems mainly focus on automating processes, they don't have methods for enhancing the task performer's efficiency. In this paper, we propose a new method of executing business processes more efficiently in that a whole process is scheduled considering the degree of the participants' workload. The method allows managing the largest constraints among constituent resources of the process. We utilize DBR scheduling techniques to develop the method. We first consider the differences between workflow process models and DBR application models, and then develop the modified drum, buffer and rope. This leads us to develop WF-DBR (WorkFlow-DBR) that can control the proper size of the task performers' work list and arrival rate of process instances. Use of WF-DBR improves the efficiency of the whole process as well as the participants' working condition. We then carry out a set of simulation experiments and compare the effectiveness of our approach with that of scheduling techniques used in existing systems.

  • PDF

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

A Survey on the status of using trichloroethylene(TCE) in Korea (트리클로로에틸렌의 유통·사용 실태조사 결과)

  • Cho, Hyung-Yoel;Cho, Sung-Hyun;Ryoo, Jang-Jin;Kim, Byung Gyu;Park, Seung-Hyun;Kang, Seong-Kyu
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.17 no.3
    • /
    • pp.254-260
    • /
    • 2007
  • Trichloroethylene(TCE) is widely used as a degreasing solvent in workplaces. TCE is primarily toxic to the nervous system, however, systemic disorder like Stevens-Johnson syndrome has been recently reported in small-scale factories, where the government has had limited information of chemical use. A survey was performed to investigate the actual condition of using TCE and to provide practical information to occupational health service agencies and professionals. This survey was carried out on 103 factories out of 430 factories which were conducted periodic work environment measurement for TCE. Degreasing was the most popular reason for using TCE in Korea, which reached to 94%. TCE was also used as a solvent for rubber in the coating or molding process, and adhesives in the bonding process. Metal fabrication was the most common as 23%, followed by assembling automobile parts (17%), and machinery (12%). Workers exposed to TCE during full-shift were 52% while 48% were exposed during short period of the shift or intermittently. Manual or semi-automatic work occupied 87% while automatic work was just 13%. Though automatic work by a closed system was generally lower exposed to TCE, compared to manual work, it can cause a high exposure when the maintenance system is improper. Semi-automatic work especially like open-top degreasing process can cause a high exposure when local exhaust system with condensing and refrigerating coils in the degreaser does not work well. In conclusion, the survey showed nationwide status of TCE exposure in various aspects. It can be used to monitor workplaces and workers exposed to TCE to prevent occupational diseases.

Lead Exposure Indices, Workloads, and Environmental Factors in Battery Manufacturing Workplace

  • Cho, Kwang Sung;Jeong, Byung Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.32 no.3
    • /
    • pp.259-266
    • /
    • 2013
  • Objective: This study aims to evaluate the workloads of industrial and automobile storage battery industries and their association to biological exposure indices. Background: Occupational lead exposure at battery manufacturing workplace is the most serious problem in safety and health management. Method: We surveyed 145 workers in 3 storage battery industries. Environmental factors(lead in air, temperature, humidity and vibration)), biological exposure indices(lead in blood and zinc protoporphyrin in blood) and individual workload factors(process type, work time, task type, weight handling and restrictive clothing) were measured in each unit workplace. Results/Conclusion: Air lead concentration is statistically significant in associations with workload factors(process type, work time, task type, and restrictive clothing) and environmental factors (humidity and vibration), whereas zinc protoporphyrin in blood are significantly associated with work time and weight handling. And lead in blood is significantly associated with work time, weight handling and temperature. Application: The results of this study are expected to be a fundamental data to job design.

A Case Study on Furniture Design Process in Work Spaces - Focused on furniture design for bank Interiors - (업무공간을 위한 가구디자인 프로세스 사례 연구 - 은행의 가구디자인을 중심으로 -)

  • 박영순;신인호;최지연;박소연
    • Korean Institute of Interior Design Journal
    • /
    • no.23
    • /
    • pp.85-91
    • /
    • 2000
  • This study is focused on the process of a furniture design in work spaces, especially for bank interiors. Basically furniture design is consisted of two main parts of process. The first part is series of a theoritical background and the second part is a visual design process. Theoretical background contains human activities in place, antropometric data, requisite furniture type according to activities and some guidelines for design. And for the visual design process, series of sketches(theoretical background must be applied to this process), and alternatives of design was needed. Researching and applying all these factors systematically to furniture design process will lead to harmonious interiors.

  • PDF

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Experimental Study on Characteristics of Dry Wire Electrical Discharge Machining (EDM) Process (건성 와이어방전가공 프로세스 특성에 관한 실험적 연구)

  • Lee, Sang-Won;Kim, Hong-Seok
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.1
    • /
    • pp.11-17
    • /
    • 2010
  • This study investigates the non-traditional manufacturing process of dry wire electrical discharge machining (EDM) in which liquid dielectric is replaced by a gaseous medium. Wire EDM experiments of thin workpieces were conducted both in wet and dry EDM conditions to examine the effects of spark cycle (T), spark on-time ($T_{on}$), thickness of work pieces, and work material on machining performance. The material removal rate (MRR) in the dry wire EDM case was much lower than that in the wet wire EDM case. In addition, the thickness of workpiece and work-material were found to be critical factors influencing the MRR for dry EDM process. The relative ratios of spark, arc and short circuit were also calculated and compared to examine the effectiveness of processes of dry and wet wire EDM.