• Title/Summary/Keyword: Work rate

Search Result 4,633, Processing Time 0.041 seconds

The Study for the CMP Automation wish Nova Measurement system (NOVA System을 이용한 CMP Automation에 관한 연구)

  • 김상용;정헌상;박민우;김창일;장의구
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.11a
    • /
    • pp.176-180
    • /
    • 2001
  • There are several factors causing re-work in CMP process such as improper polish time calculation by operator, removal rate decline of the polisher, unstable in-suit pad conditioning, slurry supply module problem and wafer carrier rotation inconsistency. And conclusively those fundimental reason for the re-work rate increasement is mainly from the cycle time delay between wafer polish and post measurement. Therefore, Wafer thickness measurement in wet condition could be able to remove those improper process conditions which may happen during the process in comparison with the conventional dried wafer measurement system and it can be able to reduce the CMP process cycle time. CMP scrap reduction by overpolish, re-work rate reduction, thickness control efficiency also can be easily achieved. CMP Equipment manufacturer also trying to develop integrated system which has multi-head & platen, cleaner, pre & post thickness measure and even control the polish time from the calculated removal rate of each polishing head by software. CMP re-work problem such as over & under polish by target thickness may result in the cycle time delay. By reducing those inefficient factors during the process and establish of the automatic process control, CLC system need to be adopted to maximize the process performance. Wafer to Wafer Polish Time Feed Back Control by measuring the wafer right after the polish shorten the polish time calculation for the next wafer and it lead to the perfect Post CMP target thickness control capability. By Monitoring all of the processed the wafer, CMP process will also be stabilize itself.

  • PDF

Assessment of Accident Level Based on Contract Amount by Type of Construction (공사유형별 건설수주액을 고려한 건설재해수준 평가기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.157-163
    • /
    • 2021
  • The accident rate is obtained by dividing the number of accidents by the number of regular workers. In the case off construction work, however, the accident rates are not accurately figured out, because they use the approximate number of regular workers, which is estimated based on the amount of construction work and the labor ratio. In addition, the current accident rate estimation method does not reflect the characteristics of construction types, such as building, civil, plant, etc. This study is conducted with the aim of presenting a supplementary method of accident rate assessment that incorporates the characteristics of type of construction. For the purpose of this, correlation and regression analysis are executed to verify the relationships between number of accidents and the amount of construction contract, and several equations are derived which shows the relationship between the number of accidents by accident types and amount of constract by construction types. The result shows that the non-residential work amount and the number of accidents showed a proportional relationship, while the civil work amount and the number of accidents showed an inversely proportional relationship. The results of this research are expected to calibrate the construction accident rates and to be used as an auxiliary indicator to determine the trend of annual accident rates by comparing the values with usual years.

Morbidity Rate and Medical Care Utilization of Sailors during the Voyage (항해중 선원의 상병 및 치료양상)

  • Park, Jae-Yong;Jun, Jung-Won
    • Journal of Preventive Medicine and Public Health
    • /
    • v.22 no.1 s.25
    • /
    • pp.102-115
    • /
    • 1989
  • The purpose of this study was to find out morbidity rate and utilization pattern of medical services of sailors on a voyage. The subjects of this study were 470 sailors who are sailors' trainee and safety-trainee for embarkation in a ship. Data were collected by means of personal survey conducted from September 5 to October 30, 1988. The subjects were sailed 12.6 months on the average. During the voyage, 49.4% of the sailors had sickness more than once, and 24.7% was unable to work more than a day because of illness. The average monthly morbidity rate was 85.7 per 1,000 and the monthly prevalence rate of disease that was unable to work more than a day was 21.2 per 1,000. The sailors of 40-49 years old had the highest morbidity rate of 103.6 per 1,000/month. The number of days activity restricted due to sickness was 93.4 days per 1,000 persons, and the average duration of illness was 11.2 days per sickness. The proportion of treatment days to sickness days was 48.8%. Considering morbidity unable to work more than a day, the number of those who had traumatic injury were 17.2%, which revealed the highest rate, influenza or cold were 15.5%, and the digestive disease 11.2%. Less than half(42.1%) of patients were treated with medicine kept in the cabin. However, 2.1% was transferred by helicopter and 29.5% was treated at hospitals or clinics in nearby port. In the cabin, 67.4% of patients was cured completely.

  • PDF

Heart Rate Strain of Forest-workers in Timber Harvesting Operation (심박수를 이용한 임목수확작업의 작업강도 분석)

  • Baek, Seung-An;Lee, Eun-Jai;Nam, Ki-Hun;Cho, Koo-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.4_2
    • /
    • pp.593-601
    • /
    • 2020
  • This study was conducted to analyze the physical strain with heart rate monitor in timber harvesting operations in order to reduce occupational accidents. The timber harvesting activities are manual cutting(felling, limbing and bucking) with a chainsaw and extraction by cable yarder. The study took place on Japanese larch stand. The average height was 26m and average diameter at breast height(DBH) was 3 7cm. The havest unit was gentle slope to steep slope. Results showed that the heart rate increases for chocking, felling, limbing and bucking were 94.0%, 87.9%, 84.8% and 56.4% respectively. The rate of Work Load Index was higher in the limbing(61.4%) activity than other activities chocking(55.2%), felling(54.1%) and bucking(32.1%). During 50% working heart rate test it was found that limbing(1.09), chocking(1.05) and felling(1.04) was exposed to high work intensity compared to bucking(0.83). The results showed that maximum acceptable work times(felling, chocking and limbing) were 2.30 hour, 1.85 hour and 1.60 hour respectively. To avoid occupational accidents, timber harvest workers may use a suitable working hour schedule to felling, chocking, limbing.

Analysis of Noise Special Medical Examination and Work Environment Monitoring Results (소음에 대한 특수건강진단 및 작업환경측정 결과 분석)

  • Kim, Kab Bae;Park, Hae Dong
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.5-12
    • /
    • 2015
  • According to the analysis of special medical examination and work environment monitoring data, the rate of C1 and D1 on noise hazard exceeded 90 % among those of total hazardous factors. The rate of company exceeding noise exposure limit was also more than 90 %. The analysis result shows that main ages diagnosed with C1 and D1 was age of 50s. The majority scale company having workers diagnosed with C1 and D1 was the companies employing 5~49 workers. Types of industries which have a large number of companies exceeding noise exposure limit were automobile and trailer manufacturing, metal processing industry and primary metal manufacturing. A large number of work processes exceeding noise exposure limit were forming and processing work, cutting and bending work and grinding. To reduce the number of company exceeding noise exposure limit, the reduction counterplan should be focused on the type of industry and the work process which exceeded noise exposure limit frequently. However, the reduction counterplan is preemptively necessary to the type of industry and the work process which exceeded noise exposure limit consecutively if the purpose of reduction counterplan is not to merely reduce the number of company exceeding noise exposure limit but to abate workers' suffering from noise.

The main difficulties related factors of nurses' clinical work and clinical work plan activation analysis - focus on the nurses working in the field - (간호사들의 임상근무의 어려움 관련 주요 요인과 임상근무 활성화 방안 분석 - 현장에서 근무하는 간호사 대상 -)

  • Park, Soo Kyung;Cho, Kyoung Mi
    • Korea Journal of Hospital Management
    • /
    • v.21 no.3
    • /
    • pp.11-21
    • /
    • 2016
  • The purpose of this study is to investigate the degree of difficulty and turnover of nurses working in the field and to derive clinical work activation and supply policy improvements. Data was collected from December, 2014 to January, 2015, from 23 hospitals, and participants were 3,887 nurses working in the field, Survey details : the difficulty of the clinical work of nurses working in hospitals, turnover intentions status and policy proposals for clinical research work enabled General characteristics, difficulties in clinical working, turnover intention and clinical work plan activation are frequency analysis. The difference between each of the variables in accordance with the general characteristics are one-way ANOVA analysis, Correlation analysis of the variables is also a Pearson correlation coefficients. 'difficulties in clinical working' was a statistically significant difference depending on the type of hospital, nursing class, number of beds, location, age, position, employment, gender, working form, working department, salary, career, and degree level. 'turnover intention' was a statistically significant difference depending on nursing rate, number of beds, region, age, position, sex, shifts, departments, annual income, and career. 'policy recommendation' was a statistically significant difference depending on type of hospital, nursing rate, age, position, employ, shifts, departments, annual income, degree level and career 'difficulties in clinical working' is 'turnover intention' (p<.001), 'policy recommendations' (p<.001) and had a significant positive correlation. and 'turnover intention' had a "policy recommendation" significant positive correlation with the relationship (p<.001) The most difficulties point of the nurses working in the field are the environment, such as shift, urgent and dangerous. Major policy proposals are improve treatment such as wages, and welfare.

Review on the Working Hours of Radiation Work Plan for ECT through In-service Inspection (원전 가동중 ECT 검사 방사선 작업시간 고찰)

  • Chae, Gyung-Sun
    • Journal of Radiation Protection and Research
    • /
    • v.29 no.1
    • /
    • pp.57-63
    • /
    • 2004
  • As a part of In-service Inspection works in a nuclear power plant, Eddy Current Testing through all the outage of nuclear power plants has been controlled by the radiation management. From the case study about the periodical ECT work, the exposed dose rate of worker has announced over the organized dose rate before the radiation work, it affects the personnel exposed dose management and radiation work permit issue. It is not easy to get some information about ECT related working hours, scope of work and how many workers to forecast the radiation working and the predict dose exposure. It should be need the data accumulation about ECT related radiation work to prepare the ALARA achievement and the radiation work plan for dose mitigation. We can discuss a few information about ECT related radiation working issue for the application of predict dose exposure on this paper.

A study on EDP of water Rate Billing procedures (상수도 요금 과징업무 기계화 처리에 대하여)

  • 정규영
    • Water for future
    • /
    • v.7 no.2
    • /
    • pp.11-22
    • /
    • 1974
  • Comparing with Seoul city's other administrative works, the work to arrange and collect monthly water rates with 470,000 faucets is tremendous in volume and simple repetition in quality. In order to cover the shortage of handling, it is urgent for us to replace the present manual system with EDP(Electronic Data Processing) system to mechanize a series of handling works of simple repeated calculation such as water consumption, rate calculation, statistics arrangement, bills and specification of water rate by computer. When this work is completely mechanized, inspectors of water meter just turn over their checking results to the Data Center and all data are processed through Input Media(OMR Card, Punched Card) and computer for programming final bills. Then, the delivery of the bills to citizens will be the only work to be carried out. such mechanization will bring about the following benefits: 1. Improvement of administrative work by efficiency and rationalization. 2. Improvement of administrative service with people. 3. Possibility of scientific with trustworthy multi-purpose policy-making data. 4. An effect to cover the personnel shortage of 252 persons (at all the water works offices) and save manpower of 166 persons (47,619 man-days). The application of the above mentioned mechanization will be started to only Chongro and Chung-ku water works offices as model cases out of all water works offices in Seoul. As the electronic calculating machines are inducted, this system will be gradually applied to other water works offices. The billing and collection works of water rates which are connected directly to the daily life of the citizenes, should be handled by the scientific EDP system as soon as possible in order to promote the convenience of consumers and effective operation. This study is to promote the sound and rational operation of this work.

  • PDF

Effect of C/Ti Atom Ratio on the Deformation Behavior of TiCχ Grown by FZ Method at High Temperature

  • Shin, Soon-Gi
    • Korean Journal of Materials Research
    • /
    • v.23 no.7
    • /
    • pp.373-378
    • /
    • 2013
  • In order to clarify the effect of C/Ti atom ratios(${\chi}$) on the deformation behavior of $TiC_{\chi}$ at high temperature, single crystals having a wide range of ${\chi}$, from 0.56 to 0.96, were deformed by compression test in a temperature range of 1183~2273 K and in a strain rate range of $1.9{\times}10^{-4}{\sim}5.9{\times}10^{-3}s^{-1}$. Before testing, $TiC_{\chi}$ single crystals were grown by the FZ method in a He atmosphere of 0.3MPa. The concentrations of combined carbon were determined by chemical analysis and the lattice parameters by the X-ray powder diffraction technique. It was found that the high temperature deformation behavior observed is the ${\chi}$-less dependent type, including the work softening phenomenon, the critical resolved shear stress, the transition temperature where the deformation mechanism changes, the stress exponent of strain rate and activation energy for deformation. The shape of stress-strain curves of $TiC_{0.96}$, $TiC_{0.85}$ and $TiC_{0.56}$ is seen to be less dependent on ${\chi}$, the work hardening rate after the softening is slightly higher in $TiC_{0.96}$ than in $TiC_{0.85}$ and $TiC_{0.56}$. As ${\chi}$ decreases the work softening becomes less evident and the transition temperature where the work softening disappears, shifts to a lower temperature. The ${\tau}_c$ decreases monotonously with decreasing ${\chi}$ in a range of ${\chi}$ from 0.86 to 0.96. The transition temperature where the deformation mechanism changes shifts to a lower temperature as ${\chi}$ decreases. The activation energy for deformation in the low temperature region also decreased monotonously as ${\chi}$ decreased. The deformation in this temperature region is thought to be governed by the Peierls mechanism.

Risk Level Analysis of Architectural Work using AHP (AHP를 이용한 건축건설공사 공종별 위험도 분석)

  • Kim, Jeongmin;Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.96-102
    • /
    • 2017
  • The highest fatal accident ratio was recorded in the construction industry. According to the industrial insurance premium rate & business type example, among the construction industry, the architectural work has the highest fatal and loss time accident ratio. Previous literature has investigated various aspects of accident occurrence and prevention in architectural work. However, those studied were limited in that they only focused on the fatal accident without considering the loss time accident. But non fatal accidents were recorded more than 50 times of fatal accidents. Therefore non fatal accidents must be controlled to lessen industrial accidents. Based on this, the goal of this study was to investigate the nature of the loss time accident and derive the risk index of work type in architectural work. In this study, opinions of safety experts were gathered and the risk index of work type was derived using AHP(Analytic Hierarchy Process). And verification was accomplished by comparing the results of this study with the risk index derived by analysis of accident records. Results showed that the risk index of work type was significantly higher in steel frame work, temporary installation work, earth & foundation work, facilities work, concrete work. And statistical analysis for verification showed that coefficient of Pearson correlation was 0.686 and P-value was 0.001.