• 제목/요약/키워드: Work process model

검색결과 1,765건 처리시간 0.026초

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

건축공사 공종별 위험지수 산정모델에 관한 연구 (A Study on the Risk Index Model of Work Type in Architectural Construction Work)

  • 장성록;고성석;이종빈
    • 한국안전학회지
    • /
    • 제22권6호
    • /
    • pp.63-68
    • /
    • 2007
  • The purpose of this study is to verify the relation between the risk index using AHP(Analytic Hierarchy Process) and the risk index using Computing Model. For doing the objective, this research classified 22 work types in architectural construction work from the analysis Korean architectural standard specification and Korea occupational safety & health agency code. Based on the classified 22 work types in architectural construction work, the risk index of each work type was calculated by AHP and Computing Model. For verifying the correlation of risk index between AHP and Computing Model methods, SAS version 8.0 System, which is one of the statistics programs, was used.

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델 (A Model for Optimization Process of Asbestos Dismantling Work Using Simulation)

  • 조형준;노재윤;이호현;이수민;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

Leveling Up the Information Culture of Social Work Bachelors

  • Bartosh, Olena;Povidaichyk, Oksana;Kozubovska, Iryna;Shandor, Fedir;Afanasiev, Dmytro;Bodnar, Olesia;Katsora, Oleksandr;Oros, Oleksandra
    • International Journal of Computer Science & Network Security
    • /
    • 제21권5호
    • /
    • pp.222-230
    • /
    • 2021
  • The article reviews the issue of formation of information culture of social work bachelors in the process of their professional training. The main internal / external factors that determine the need for the information culture formation of social workers-to-be have been identified. To determine the levels of information culture formed in bachelors of social work criteria and their indicators have been substantiated. The model of information culture formation in BSW has been developed and implemented in Ukrainian universities under the following pedagogic conditions: organized informational environment; interconnection between general and professionally-directed courses; curriculum includes course directed on IC formation. The model contained interconnected components: aim - to achieve higher level of information culture formed; specific principles; content, interactive methods and forms of organization of educational process, methods of control and correction; components of information culture. The implemented mastered learning procedure has contributed to the leveling up of information culture formed in social work bachelors.

설계 프로세스를 반영한 BIM 작성 기준(LOD)에 대한 연구 (A Study of LOD(Level of Detail) for BIM Model applied the Design Process)

  • 조현정;김연수;마영균
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.1-10
    • /
    • 2013
  • BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.

석면해체 공사의 공정 리스크를 고려한 비용 산정 모델 개발 (Development of Cost Estimation Model Considering Process Risk for Asbestos Dismantling Work)

  • 노재윤;이수민;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.49-50
    • /
    • 2023
  • Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.

  • PDF

A Queueing System with Work-Modulated Arrival and Service Rates

  • Lee, Jiyeon
    • Journal of the Korean Statistical Society
    • /
    • 제28권1호
    • /
    • pp.125-133
    • /
    • 1999
  • We consider a FIFO single-server queueing model in which both the arrival and service processes are modulated by the amount of work in the system. The arrival process is a non-homogeneous Poisson process(NHPP) modulated by work, that is, with an intensity that depends on the work in the system. Each customer brings a job consisting of an exponentially distributed amount of work to be processed. The server processes the work at various service rates which also depend on the work in the system. Under the stability conditions obtained by Browne and Sigman(1992) we derive the exact stationary distribution of the work W(t) and the first exit probability that the work level b is exceeded before the work level a is reached, starting from x$\in$[a, b].

  • PDF

Analysis of the Work Time and the Collective Dose by Correcting the Learning-Forgetting Curve Model in Decommissioning of a Nuclear Facility

  • ChoongWie Lee;Hee Reyoung Kim;Jin-Woo Lee
    • Journal of Radiation Protection and Research
    • /
    • 제48권1호
    • /
    • pp.20-27
    • /
    • 2023
  • Background: As the number of nuclear facilities nearing their pre-determined design life increases, demand is increasing for technology and infrastructure related to the decommissioning and decontamination (D&D) process. It is necessary to consider the nature of the dismantling environment constantly changing and the worker doing new tasks. A method was studied that can calculate the effect of learning and the change in work time on the work process, according to the learning-forgetting curve model (LFCM). Materials and Methods: The LFCM was analyzed, and input values and scenarios were analyzed for substitution into the D&D process of a nuclear facility. Results and Discussion: The effectiveness and efficiency of the training were analyzed. It was calculated that skilled workers can receive a 16.9% less collective radiation dose than workers with only basic training. Conclusion: Using these research methods and models, it was possible to calculate the change in the efficiency of workers performing new tasks in the D&D process and the corresponding reduction in the work time and collective dose.

Developing a Data Model of Product Manufacturing Flow for an IC Packaging WIP System

  • Lin, Long-Chin;Chen, Wen-Chin;Sun, Chin-Huang;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제6권3호
    • /
    • pp.70-94
    • /
    • 2005
  • The IC packaging industry heavily relies on shop floor information, necessitating the development of a model to flexibly define shop floor information and timely handle manufacturing data. This study presents a novel data model of product manufacturing flow to define shop floor information to effectively respond to accelerated developments in IC package industry. The proposed data model consists of four modules: operation template setup, general process setup, enhanced bill of manufacture (EBOMfr) setup, and work-order process setup. The data model can flexibly define the required shop floor information and decision rules for shop floor product manufacturing flow, allowing one to easily adopt changes of the product and on the shop floor. However, to handle floor dynamics of the IC packaging industry, this work also proposes a WIP (i.e. work-in-process) system for monitoring and controlling the product manufacturing flow on the shop floor. The WIP system integrates the data model with a WIP execution module. Furthermore, an illustrative example, the MIRL WIP System, developed by Mechanical Industrial Research Laboratories of Industrial Technology Research Institute, demonstrates the effectiveness of the proposed model.