• Title/Summary/Keyword: Work management system

Search Result 3,469, Processing Time 0.031 seconds

A Study on Establishment of Standard ERP to Operate Many Production System (다수의 생산시스템 운영을 위한 표준 ERP 구축에 관한 연구)

  • Lee, Hee-Nahm
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.115-119
    • /
    • 2011
  • To help the corporations ensure more efficient production management, the Enterprise Resource Planning (ERP) system has been introduced in operation, together with a variety of approaches to make improvements in terms of quality and productivity issues. Yet, with the different types of ERP systems in operation, many companies are going through many difficulties not only in having greatly reduced work efficiency but also in making prompt decisions from the entire group-based integrated information. In this study, the analysis was made on their own ERP systems and working processes operated by a company running the multiple number of productions from the domestic and the overseas suppliers, in order to support their interacted work flow regarding their products and help improve the work efficiency by establishing standardized ERP system. Through this, it is expected to ensure more competitive system in operation by securing the flexibility in the production as well as efficient resource distribution under the corporate context of cost reduction and quality improvement.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

The Implementation of Mobile Facility Management System Supporting Version Management Facility (버전 관리 기능을 지원하는 모바일 시설물 관리 시스템의 구현)

  • Bae, Sang-Ho;Lee, Young-Geol;Oh, Won-Jin;Han, Seung-Hee;Bae, Yeon-Soung
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.417-420
    • /
    • 2007
  • Mobile facility management system is a on-site management tool to collect and update various facility data. But there is a chance to make a data inconsistency between lot of concurrent workers. And facility management system requires to keep records about work log within a certain period of time. This paper describes the design and implementation of mobile facility management system, which provide efficient data synchronization mechanism using version managent technique on large facility data in concurrent work environment. And proposed system is able to keep workers update log persistently.

  • PDF

A Study on the Equipment Maintenance Management Support System for Production Efficiency (생산효율화를 위한 설비보전관리 지원시스템에 관한 연구 -설비보전정보시스템을 중심으로-)

  • 송원섭
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.279-289
    • /
    • 1998
  • This study deals with the schemes of design, plan and operate maintenance management support systems and with the engineering approach for the solutions to build the maintenance management for the production efficiency. Maintenance Management Information System(MMIS) is the task that must focus on machinery historical data and planned maintenance action. Also the efficient supporting system in a maintenance management is achieved by database which is based on process of machinery's failure history. Designing method of maintenance management information system, maintenance modules are consisted of six factors ; machinery's historical data, lubrication control, check sheet, repair work, availability report, and performance report(control board and detailed reports), and then operators can rapidly utilize data in work place. In the implementation of designed model, program coding has been developed by Visual Basic 3.0. Data insertion, deletion and updating which perform menu screen is implemented by reading data from database. Implementation model based on LAN environment and related data is stored in Microsoft DBMS.

  • PDF

Introductions, Results and Suggestions of the Family-Friendly System in the Field of Working Place (직장영역의 가족친화제도 도입과 성과, 그리고 과제)

  • Yoon, So-Young;Kim, Hyun
    • Journal of Family Resource Management and Policy Review
    • /
    • v.12 no.2
    • /
    • pp.141-152
    • /
    • 2008
  • This study reviews a family-friendly system of companies from the viewpoint of family resource management. The concept of a family-friendly system in the workplace means that the strategy 'supports the family' or 'is sensitive to the family life' and recognizes a need for balance between work and family. The suggestions proposed in this study were as follows: First, the direction of a family-friendly system must reflect the needs of the family members positively and recognize diversity. Second, it must consider efficient methods relating to the matter of the gender because a corporate culture enabling men to use childcare leave has not grown, even in family companies. Third, the directions to check the present developing process of our society and to develop the suitable way to each company must be shown. This study has proposed that the subjects must solve immediately in the future with understanding the contents and looking around the status of the enforcement at the inside and outside of the country for a family-friendly system to handle the balance between work and family in the workplace. The problems were the context of the introductions and the results of balancing between work and family no matter whether the introduction of the system by company or not.

  • PDF

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

Safety characteristics deployment of the unit working process (단위작업공정에 대한 안전특성 전개)

  • Kim, Soon-Jin;Yang, Hyun-Hoo;Lee, Kang-Bok;Kim, Geon-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.1-7
    • /
    • 2007
  • A study wish to present relation of safety characteristic deployment, which has the safety demand, safety characteristic, protection characteristic, safety regulation, safety education of unit work process. Safety characteristic deployment will be used in safety management education system design with a method of safety management system construction of unit work process.

Study on the Maintenance and Management using DB Program of Inspection Data for Tunnel (터널의 진단자료 DB화에 의한 유지관리 연구)

  • Lee, Song;Shim, Min-Bo
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.503-510
    • /
    • 2000
  • Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures

  • PDF