• Title/Summary/Keyword: Work management system

Search Result 3,444, Processing Time 0.032 seconds

The Case Study on The Introduction and Practical Application of the Budget Management System -On the Performance Measurement of Standard Work Unit- (예산관리제도의 도입과 실제적 운용에 관한 사례연구 -표준적인 작업의 성과측정을 중심으로-)

  • 윤용운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.39-51
    • /
    • 1979
  • In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.

  • PDF

- Building The Safety Management System of The Press Machine - (프레스 작업의 위험분석 몇 작업안전관리 체계연구)

  • Kim Byung Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.27-40
    • /
    • 2004
  • There are much dangerous machine in worksite. These make the rate of accidents increase. Specially, among them, the Press work has the highest rate of accidents. Therefore, it has been managed by Industrial safety-health law. It is very important to make a special study of work using the dangerous machine. In press work, it is also important to develop safety system program to improve productivity and work safely, In this reaserch, the safety management system is built for the work improvement of the Press. This paper showed method about dangerous machine.

- Building The Safety Management System of The Dryness Equipment - (건조설비 작업개선을 위한 안전관리 시스템 구축)

  • Kim Byung Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.15-26
    • /
    • 2004
  • There is much dangerous machine in worksite. These make the rate of accidents increase. Specially, among them, dryness equipment work has the highest rate of accidents. Therefore, it has been managed by safety-health law. It is very important to make a special study of work using the dangerous machine. In press work, it is also important to develop safety system program to improve productivity and work safely In this reaserch. the safety mangement system is built for the work improvement of the Press. I will try new development method about dangerous machine.

A Study on a Cost-Based Information Management System for Apartment Finishing Work Items (원가기반의 공동주택 마감재 정보관리 시스템에 관한 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Kim, Kyung-Sook;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.29-37
    • /
    • 2010
  • In recent years, apartment finishing work items have increasingly become more upscale and diverse, and the kinds have increased in exponential numbers. A huge amount of information about finishing work items is produced and changed in the stages of planning finishing work item design and selecting alternatives in the early days of an apartment project. However, there are many problems raised by the poor information management of finishing work items. Thus this study suggested a cost-based information management system to manage information about finishing work items generated in the initial stage of an apartment project. In order to build the suggested system, the investigator designed an information management system based on the concepts and organization of system. And after setting a scenario of selecting finishing work items by conditions including the initial information values of finishing work items, information management for each alternative, and cost fix or free condition, I implemented and applied a prototype of an information management system for finishing work items among the participants including the project manager, interior designer, and builder.

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

Scanned Drawing-based Production Management System for Deckhouse Floor Outfitting (스캔도면 기반 선실바닥의장 생산관리 시스템 개발)

  • Kang, In-Chang;Song, Chang-Yong
    • Journal of Ocean Engineering and Technology
    • /
    • v.31 no.2
    • /
    • pp.141-154
    • /
    • 2017
  • A production management system is developed to enhance both the information and productivity of ship and offshore plant deckhouse floor outfitting. The functions of the production management system for the deckhouse floor outfitting were reviewed based on a literature survey of several production management systems with respect to the ship building and architecture fields. This study investigated numerous daily production reports and their application to actual work places to utilize the system development. The developed scanned drawing-based production management (SDPM) system minimizes any loss and/or distortion of work information between the workshop and management office when applying a scanned production drawing to the daily report. The SDPM system increases the data objectivity, as well as intuitiveness of the information generation by adopting an efficient user interface, which makes it possible to perform image annotations on the scanned drawing for the daily production report while simultaneously interacting with the production management database. Applying the system operation to actual deckhouse floor covering work verified that it was feasible to use the SDPM system for production management in the ship outfitting work process.