• Title/Summary/Keyword: Work System

Search Result 14,044, Processing Time 0.043 seconds

Intelligent excavating system planning process for disaster prevention in earth work (토공사에서의 재해 방지를 위한 지능형 굴삭 시스템의 계획생성과정)

  • Lee, Seung-Soo;Seo, Jong-Won
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.609-612
    • /
    • 2008
  • Since most of the industries have adopted automation system, the industrial disaster has been declined sharply. Also automation system has offered many benefits such as productivity and assured quality. However, the construction industry is still relying on man power and because of this there are many victims occurring due to the industrial disaster. Construction industry has to overcome uncertainty of incidents and changing natural surroundings to actualize automation. Therefore, the efficient working plan and intelligent decision making process are needed to run more developed techniques and automations. Specially to decline the rate of industrial accidents occurred in basic construction in earth work, the automation via excavator is necessary and also the development of planning process system is too. This research is to establish Task Planning System to prevent disaster which is used for planning automated earth work.

  • PDF

Decision of Optimal Platform Location Considering Work Efficiency -Optimization by Excavator Specification- (작업의 효율성을 고려한 최적 플랫폼 위치 선정 방안 -굴삭기 제원에 따른 최적화-)

  • Lee, Seung-Soo;Park, Jin-Woong;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.790-793
    • /
    • 2008
  • Recently, Intelligent Excavating System(IES) for earthwork automation is on progress since the end of 2006 as a part of construction technology innovation projects in Ministry of Land, Transport and Maritime Affairs. Task Planning System(TPS), one of the detail core technologies of IES, is an optimal work planning system in conditions of effectiveness, safety and economic efficiency by analyzing the work environment data based on earthwork design and work environment recognition technology. For effective earthwork planning, the location of platform must be the most optimal spot for minimization of time, maximization of productivity and reduction of overlapped work spaces and unnecessariness. Besides, the decision of optimal platform location is to be based on the specifications and then is able to be converted with the local area calculation algorithm. This study explains the decision of optimal platform location on the basis of local area from the work space separate process and judges the effectiveness.

  • PDF

A Study on the Evaluation of the Work-Net, a Web-based Public Employment Information System (웹 기반 공공고용정보시스템 워크넷(Work-Net)평가에 관한 연구)

  • Kim, Soon-Won
    • Journal of the Korean Society for information Management
    • /
    • v.20 no.2
    • /
    • pp.93-112
    • /
    • 2003
  • A public information system is being expanded, along with the advance of information technology, to strengthen national competitiveness and provide people with better services. And there also is a growin need for the better performance of that system, as a tremendous amount of public financial resources is invested in that. To address that need, it's required to make an evaluation of its efficiency on a regular basis to identify its problems and make it work better. The purpose of this study was, accordinglu, to examine the quality of data and services provided by the Work-Net, a Web-based public employment information system. The subjects in this study were 102 users of it, and the system was evaluated in terms of content, accuracy, timeliness, display format, ease of use and customer support. For data analysis, t-test and one-way ANOVA were implemented to find out the general characteristics of the users, and to see Whether or not their view was different according to the type of information they searched for. The findings of this study are expected to lay some foundation for intensifying the efficiency of the public and private employment information systems.

Work Measurement of Dietetic Staff through Work Sampling Methodology in School Foodservice Systems (워크샘플링에 의한 학교급식 전담직원의 직무분석)

  • 양일선;이영은;차진아;유태용;정라나
    • Journal of Nutrition and Health
    • /
    • v.35 no.2
    • /
    • pp.263-271
    • /
    • 2002
  • The purpose of this study was to determine the standard work time of dietetic staff through work sampling methodology in school flood service systems. Work measurement through work sampling methodology was conducted in five conventional, five commissary and five joint management flood service systems over two consecutive weeks in October 1999. Statistical analysis was performed on the SAS/Win 6.12 package program for Kruskal-Wallis test and multiple comparison. Observed data were satisfied with a confidence level of 95% and a confidence interval of $\pm$ 0.05. The results of this study can be summarized as follows. The actual time spent by dietetic staff members in conventional, commissary, joint-management flood servile systems was 2,394, 2,521 and 2,110 minutes per week, respectively. Transportation time of each flood service systeml and ILO allowance rate (11%) was applied. Thus, the standard work time per week of dietetic staff members in conventional, commissary, joint-management flood service systems was 2,746.14, 2,861.58 and 2,520.81 minutes, respectively. The standardized index was 1.04, 1.08 and 0.95 men in conventional, commissary, and joint-management flood service systems, respectively. Regardless of the school flood service system, those with "the duty of cooking and distribution management" had the longest labor time, while those with "duty of nutritional education" had the shortest labor time.

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

A Study of the Strategy on Smart Work (스마트워크 전략에 관한 연구)

  • Park, Kyung-Hye
    • Journal of Digital Convergence
    • /
    • v.9 no.4
    • /
    • pp.213-222
    • /
    • 2011
  • The purpose of this paper is to propose a smart work implementation strategy of Korean companies. Recently in Korea, the interest in smart work is growing and actively promoting but the introduction of private enterprise strategy is absent. However the smart work has been highlighted several issues. In this paper, among the issues, we studied the strategy for introducing smart work system with respect to the related research and literature on strategies and guidelines that may be introduced to the system. With reference to the actual introduction of the basic directions for the procedure proposed by the Korea Communications Commission, we try to review the operating guides and to propose smart work 2.0 implementation strategy, framework and some procedure.

A Study on the meaning of work and job embeddedness affecting the creative behavior of organization members

  • Kim, Moon Jun
    • International journal of advanced smart convergence
    • /
    • v.10 no.2
    • /
    • pp.97-107
    • /
    • 2021
  • This study attempted to confirm the factors that the meaning of work perceived by organization members and job embeddedness affects creative behavior. In addition, we tried to confirm the relationship between the meaning of work and job embeddedness. On the other hand, we tried to verify the mediating effect of job embeddedness between the meaning of work and creative behavior. Accordingly, the following results and implications were derived through the hypotheses set for the members of small and medium-sized enterprises. First, the meaning of work showed a positive effect on job embeddedness and creative behavior, and it was empirically analyzed that job embeddedness was improved on creative behavior. In order to improve the creative behavior of organizational members, the need for advancement of the management and training system to systematically improve and strengthen the meaning of work and job embeddedness has emerged. Second, job embeddedness showed a mediating effect between the meaning of work and creative behavior. In other words, the employee's job embeddedness acted as a direct or indirect factor according to the improvement of the meaning of work and creative behavior. Accordingly, as one of the major factors in human resource management and strategic human resource development for the advancement of the sustainable management system, the need for institutional establishment and implementation was required as it became more efficient and effective.

A Study on Computer-Generated time Standard Calculations with Applications (작업표준시간산출(作業標準時間算出)의 전산화(電算化)와 적용사례(適用事例))

  • Yu, Byeong-Nam;Sin, Hyeon-Pyo
    • IE interfaces
    • /
    • v.1 no.1
    • /
    • pp.63-72
    • /
    • 1988
  • Since many small and medium sized enterprises in Korea have lack of funds to install a commercial computer packages for work standards and work scheduling. This study has been attempted to develop the computer-generated package to ease those problems. The system consisted of three major parts. The first part is a work measurement program applying W.F.(work factor) predetermined time standards for work standards. The second part is a work scheduling program which calculates each operator's machine and job allocation. The last part is a control program for the production outputs and the machine utilization monitoring. The system is programmed by dBASE III for the IBM-PC compatibles for the sake of user's conveniences.

  • PDF

A Study on the ISO 9001 Application of Railway Supervision work (철도 감리 업무의 ISO 9001 적용에 대한 고찰)

  • Jang Seog-Jae;Hwang In-Bum;Sung Jung-Hwa;Kim Hae-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.325-329
    • /
    • 2006
  • Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF