Objectives: This study was undertaken in order to evaluate by work space zoning and structure the concentrations of biological contaminants in the indoor air of domestic office buildings. Methods: Air samples were collected in the office spaces of 15 office buildings in Seoul from June 28 to July 28, 2011. Prior to the sampling, each office was classified into 'open-plan office', 'cellular office' and 'mixed office' according to the work space zoning. To evaluate the biological contamination of indoor air, total suspended bacteria (TSB), Gram positive bacteria (GPB), Staphylococcus aureus (S.A), Methicillin-resistant Staphylococcus aureus (MRSA), Gram negative bacteria (GNB) and fungi were investigated. During the sampling, temperature, relative humidity and carbon dioxide ($CO_2$) were measured. Results: The TSB concentrations ($GM{\pm}GSD$) were $452({\pm}1.3)cfu/m^3$ in open-plan offices, $366({\pm}1.3)cfu/m^3$ in cellular offices and $287({\pm}1.5)cfu/m^3$ in mixed offices, and there were significant differences between the three groups (p<0.05). The highest concentrations ($GM{\pm}GSD$) of fungi were found in the indoor air of cellular offices $128({\pm}1.0)cfu/m^3$, which was at least three times higher than the concentrations in mixed offices $43({\pm}1.0)cfu/m^3$ (p<0.05). Conclusions: Microbiological contamination in the indoor air of office buildings by work space structure was the highest with the open-plan office layout which includes no high walls or doors separating the occupants.
Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.
작업성취율(Percent of Plan Completed: PPC) 도입을 통한 효과는 선진 건설 사례들을 통해 검증되고 있으나, 우리 건설현업에서는 이에 대한 적용사례가 없다 본 연구는 외국에서 작업성취율을 적용한 사례를 분석하고 이를 우리 건설현업에서의 공정관리체계와 비교함으로써 작업성취율 활용을 위한 공정관리체계를 제시하는 것을 목표로 하였다. 외국 사례와 국내 공정관리체계를 비교함에 있어 3주 미래 작업계획단계의 예비작업목록 작성과 제반요건분석, 1주 작업 단계의 실패원인 분석과 작업성취율 측정 등의 관리 도구를 선정하였고 이틀을 대상으로 LPS(Last Planner System)와 국내의 공정관리현황을 비교 분석함으로써 차이점을 분석하고 작업성취율 활용을 위한 추가 공정관리절차출 제시하였다. 또한, 국내 건설 전문가들에게 설문 및 면담을 통해 본 연구에서 제시한 공정관리체계의 현장 적용성 검토를 실시하였다.
This study describes the consideration of environmental impact in the preliminary environment investigation and EIA of railroad work. In the stage of preliminary environment investigation, it is important to choose the railroad line and location which minimizes the environmental impact due to the operation of railroad work, and EIA includes the prediction and reduction plan of environmental impact according to the construction and management of railroad.
건설공사의 시공공정을 관리자의 경험적 판단에 의하여 작업팀을 구성하여 운영하면, 시공공정의 진행이 비효율적으로 될 가능성이 많다. 그러나 시공계획단계에서 모의조작을 통하여 자원할당, 공사비, 공사기간의 최적 안을 산출하면 시공공정을 정량화하여 효율적인 운영을 할 수 있다. 본 연구에서는 시공공정을 계획할 때 작업팀 운영의 변화에 따른 자원할당 변동치, 자원 손실비, 총공사비, 공사기간의 최적 안을 모의조작 할 수 있는 수식모형의 시안 식을 제안하였다. 제안된 수식모형을 검증하기 위하여 시공공정의 수평작업역과 수직작업 역이 각각 상이하게 구성된 공동주택 골조공사에 적용하여 시현하였다. 본 연구에서 제시된 수식모형을 적용하여 모의 조작을 실시한 결과가 실제 사례공사에서 적용된 작업팀의 운영실적보다 효율화를 달성하였다.
현대의 건축공사는 고층화 추세에 따라 반복공정의 수가 증가하여 작업 연속성에 대한 계획 및 공사관리가 중요하게 인식되고 있다. 특히, 많은 반복공정이 동시에 수행되는 마감공사는 작업흐름의 관리에 따라 전체공사에 큰 영향을 미치므로 작업 연속성에 대한 계획이 필요하다. 마감공사의 합리적 운영을 위해 작업연속성을 확보하여 목표공기를 달성하는 기법인 택트 공정관리에서는 택트타임을 설정하여 반복작업의 작업편차를 일정하게 하여 공사계획을 수립한다. 그러나, 기존 택트공정 관리와 관련된 연구는 작업구역분할, 작업일보, 택트 공정관리 프로세스 등을 수행하였지만 작업 연속성 확보를 위한 택트타임에 대한 연구는 충분히 수행되어 있지 않은 실정이다. 따라서 본 연구에서는 3점추정견적 방법에 의한 택트타임의 설정방법과 작업기간 조정절차를 제시하여 택트타임 기반의 공정계획수립 방법을 제시하였으며, 이와 같은 방법에 의한 택트공정 계획 수립을 통해 목표공기가 지연되지 않음을 입증하였다.
Introduction: The legal duties of Korean dental hygienists are different from the actual tasks. These factors cause dental hygienists to experience work stress. Therefore, it is necessary to investigate what tasks the dental hygienist expects to perform. Methods: This study examined the perception of dental hygienists' work on 158 prospective graduates of the 3rd-year and 4th-year course of dental hygiene. The questionnaire about the dental hygienist's duties was prepared based on the job description of dental hygienists by the Korea Health Personnel Licensing Examination Institute. Results: More than 84% said that all of the work in the second job description was possible as dental hygienists. subjects responded that the following items were not dental hygienists' duties: treatment plan based on medical history and dental history, treatment plan based on an intraoral and extraoral examination, treatment plan based on the results of teeth and periodontal examination, analysis of oral health data in community, planning of oral health promotion in community, planing of water fluoridation, reading of radiography, root planing, physical treatment on head and neck, using an ultrasonic device on head and neck, dealing with laser devices, making a temporary crown, suture and stitch-out, and intramuscular injection. Conclusions: Most graduates of dental hygiene departments have recognized that the tasks described in the second job description are dental hygienists' work; therefore, it is necessary to improve the gap between expected work and legal work.
Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.
Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.
Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.