Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

Intelligent Allocation of Transporting Resources in Logistics using Genetic Algorithm (유전자 알고리즘을 이용한 물류에서의 지능적 운송 자원 할당)

  • Kim, Ju-Won;Cha, Yeong-Pil;Jeong, Mu-Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.23-26
    • /
    • 2004
  • Recently, most of countries in the world are investing huge amount of capital for the infrastructure of logistics and trying to gain dominating position in logistics. To play the role of important hub in logistics, an efficient, flexible, and fault-tolerant transportation process should be developed. Minimization of transportation cost and timely deliveries in the unpredictable environment are a few of the important issues in logistics. This study suggests a way of transporting goods to destinations at the minimal cost and with the minimal delay by optimally allocating transporting resources. Various attributes in transportation such as due date, priority etc. are also considered. Appropriate transporting resources for each work item is selected by calculating the weighted sum of the cost factor and the delay factor assuming that initial sequences of work items are given. A policy to reallocate transporting resources is also suggested when work items or transporting resources are added or deleted because of accidents or disturbances. This policy provides adaptability to the allocation methodology which enables the system to cope with changing environment by controlling various attributes in transportation. Genetic algorithm is used for this approach.

  • PDF

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

Design of a Concrete Mix Considering Curing Temperature and Delay Time in Concrete Placement (현장 콘크리트 타설시 양생온도와 대기시간을 고려한 배합설계 결정)

  • Moon, Sungwoo;Lee, Seong-Haeng;Choi, Hyun-Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.133-140
    • /
    • 2019
  • The concrete mix should be designed and produced to reflect the specific site conditions during concrete placement. That is, the concrete mix design should be planned considering temperatures, work environments, pouring methods, etc. The objective of this research is to understand the external factors of curing temperature and delay time that influence concrete strengths during pouring work, and provide concrete mix design that can be most robust to the effects of external factors. The Taguchi's robust method is used in preparing the concrete mix design to achieve the research objective. In a case study, an indoor concrete test was performed to find the optimal combination of concrete mixes with external factors of curing temperature and delay time. Concrete test cylinders were made to test concrete strengths given different external factors. The study results showed that the optimal performance of concrete strength can be achieved by applying the robust method when preparing a concrete mix design.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

A Study on PWM Pattern for Driving Induction Motor using ${\mu}$-Processor and One Chip (범용 ${\mu}$-Processor와 One Chip으로 구현되는 유도전동기 구동 PWM Pattern에 관한 연구)

  • Hwang, Y.M.;Hoe, T.W.;Park, J.H.;Shin, D.R.;Cho, Y.G.;Woo, J.I.
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.179-181
    • /
    • 1998
  • In this paper, one chip PWM pattern generator which eliminates time delay of computations and improves utilization factor of voltage is proposed. Both amplitude of sinusoidal signal and triangular signal are directly controlled. Thus, time delay of computations can be eliminated, and it is possible to track accurately instantaneous current for a sudden change of load with microprocessor 80C196KC. In addition, setting dead-time is also possible for wide range. From experimental work with inverter system for driving induction motor, the validity of proposed one chip PWM pattern generator is verified.

  • PDF

MAC protocol for Energy-Efficiency and Delay in Ubiquitous Sensor Networks (USN에서 에너지 효율성과 지연을 위한 MAC 프로토콜)

  • Oh, Won-Geun;Lee, Sung-Keun
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.4 no.1
    • /
    • pp.20-24
    • /
    • 2009
  • sensor node work limited energy. It is undesirable or impossible to replace the batteries that are depleted of energy because of characteristics of the sensor network. Due to the specific energy constrained environment, MAC design for sensor networks generally has to take energy consumption as one of its primary concerns. But in sensor networks, latency has been a key factor affecting the applicability of sensor networks to some delay-sensitive applications. Therefore, we propose MAC protocols based DSMAC in this paper. Which is able to dynamically change the sleeping and duty cycle of sensors is adjusted to adapt to packet amounts in buffer. Proposed MAC has energy efficiency and low latency, compared DSMAC.

  • PDF

A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases (국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로)

  • Hwang, Jeong-Oh;Oh, Hyun-Seung;Choi, Bong-Wan;Yim, Dong-Soon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

A Study on the Effects of the Occupational Therapist's Professional Ethics on Job Stress and Burn Out (작업치료사의 직업윤리가 직무스트레스와 소진에 미치는 영향)

  • Kim, Ji-Hoon
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.10 no.4
    • /
    • pp.11-21
    • /
    • 2022
  • Purpose : The purpose of this study is to identify the degree of occupational therapist's professional ethics and to examine the correlation between professional ethics, job stress, and burnout. It also investigates the effects of the occupational therapist's professional ethics on job stress, and burn out, so that we can find a way to reduce them in occupational therapists. Methods : We conducted surveys from June 1 to July 5, 2022. The general characteristics were examined using a frequency analysis. Professional ethics, job stress, and burn out were examined using descriptive statistics. The correlation among them was analyzed with the Pearson correlation coefficient. To find out what factors affect job stress and burn out, we also conducted a multiple regression analysis. Results : First, professional ethics was averaged at 3.57±.34. Second, a significant negative correlation in professional ethics was found between job stress and burn out (p<.01). As a result of the correlation between occupational ethics sub-factors and job stress and burnout, factors excluding nonleisure and self-reliance showed a statistically significant correlation (p<.01, p<.05). Third, professional ethics sub-factor was affected job stress and burn out (p<.01, p<.05). The sub-factors affecting job stress were hard work (𝛽=.-461, p<.01), delay of gratification (𝛽=.-267, p<.01), and relation with coworker (𝛽=.-245, p<.01) and morality (𝛽=.-165, p<.05); and those influencing burnout were delay of gratification (𝛽=-.240, p<.01), relation with coworker (𝛽=-.223, p<.01), centrality of work (𝛽=-.189, p<.01) and hard work (𝛽=-.184, p<.05). Conclusion : The results of this study confirmed the importance of professional ethics affecting job stress and burn out. Through follow-up research, it will be necessary to develop and apply programs to improve professional ethic of occupational therapists in the future.