• 제목/요약/키워드: Work Delay Factor

검색결과 35건 처리시간 0.019초

원료채집기의 제어: 모델링, 계수추정, 견실한 스미스 예측기의 설계 (Reclaimer Control: Modeling , Parameter Estimation, and a Robust Smith Predictor Design)

  • 김성훈;홍금식;강동헌
    • 제어로봇시스템학회논문지
    • /
    • 제5권8호
    • /
    • pp.923-931
    • /
    • 1999
  • In this paper, a modeling and a robust time-delay control for the reclaimer are investigated. Supplying the same amount of a raw material throughout the reclamation process from the raw yard to a sinter plant is important to keep the quality of the molten steel uniform in blast furnaces. As the actual parameter values of the reclaimer are not available, the boom rotational dynamics are modeled as a second order differential equation with unknown coefficients. The unknown parameters in the nominal model are estimated using a recursive estimation method. Another important factor in the control design of the reclaimer is the large time-delay in output measurement. Assuming a multiplicative uncertainty, that accounts for both the unstructured uncertainty neglected in the modeling and the structured uncertainty contained in the parameter estimation, a robust Smith predictor is designed. A robust stability criterion for the multiplicative uncertainty is also derived. Following the work of Goodwin et al. [4], a quantifying procedure of the multiplicative uncertainty bound, through experiments , is described. Experimental and simulation results are provided.

  • PDF

DTN에서 예측 기반한 적응적 노드 속성 분석 (Adaptive analysis of characteristic nodes using prediction method in DTN)

  • 도윤형;전일규;오영준;이강환
    • 한국정보통신학회논문지
    • /
    • 제18권11호
    • /
    • pp.2771-2778
    • /
    • 2014
  • 본 논문은 Delay Tolerant Network(DTN)에서 예측기반 라우팅을 사용할 때 효율적인 중계 노드를 선택할 수 있도록 노드 속성을 분석하는 알고리즘을 제안한다. 기존 예측기반 DTN 라우팅 알고리즘은 노드의 정보를 분석하여 목적 노드로 접근하는 노드를 예측하여 중계 노드로 선택하는데, DTN의 특성상 전체적인 네트워크의 상황을 파악하기 힘들어 불규칙하게 변화하는 네트워크에서는 지연시간이 증가하고 전송률이 감소하는 단점이 있었다. 이를 해결하기 위해 제안하는 알고리즘은 노드의 속도, 방향, 위치 등의 속성 정보와 네트워크의 환경에 적응적으로 변화하는 가중치를 사용해 불분명한 네트워크 환경에서 더 효율적인 노드를 선택할 수 있도록 한다. 본 논문은 모의실험을 통해 제안하는 알고리즘을 사용한 라우팅 프로토콜이 기존 라우팅 프로토콜에 비해 전송률, 지연시간, 오버헤드 측면에서 향상됨을 검증한다.

부하변동에 의한 지중유효열전도도와 보어홀 전열저항 해석 (Analysis of Effective Soil Thermal Conductivities and Borehole Thermal Resistances with a Power Supply Regulation)

  • 노정근;연광석;송헌
    • 한국태양에너지학회 논문집
    • /
    • 제31권4호
    • /
    • pp.80-86
    • /
    • 2011
  • Investigation of the effective soil thermal conductivity(k) is the first step in designing the ground loop heat exchanger(borehole) of a geothermal heat pump system. Another important factor is the borehole thermal resistance($R_b$). Thermal response tests offer a good method to determine the ground thermal properties for the total heat transport in the ground. This is done by supplying a constant heat power into a borehole heat exchanger. There are two methods to supply a constant heat power. One is to employ the electricity provided by Korea Electric Power Corporation(KEPCO). The other is to use electricity generated by a generator. In this study, the power supply regulation was found to reduce when the electricity generated by the generator was used. This is because the generator evaluated with the power supply characteristically reduces the power supply regulation between an overload and a complex using. But it sometimes occurs a power supply regulation in In-situ thermal response test. In this case getting of k,$R_b$ requires delay times and restored normal state. However, the effect of the delay times and restored normal state on the soil thermal conductivity and borehole thermal resistance is very small. Therefore it is possible to use a generally accepted delay times and restored normal state in the analysis. In this work, it is also shown that an acceptable range of ${\Delta}k$, ${\Delta}R_b$ for normal state and regulation state might be approximately 0.01-0.16W/m k, and -0.004-0.007m K/W, respectively. Thus, restored normal state of power supply regulation is valuable to recommend.

중단의 현상학: 반복과 인지적 노력의 효과 (The Phenomenology of Quitting: Effects from Repetition and Cognitive Effort)

  • Lynn, Margaret T.;Riddle, Travis A.;Morsella, Ezequiel
    • 인지과학
    • /
    • 제23권1호
    • /
    • pp.25-46
    • /
    • 2012
  • 우리는 단조로운 과제를 할 때 종종 그만두고 싶은 충동을 느낀다. 이러한 중단 충동은 그 일을 얼마나 오래동안 해 왔는지(시간적 요인) 또는 수행하는 과제의 특정요소(사건 기반 요인)에 따라 달라진다. 이 연구에서는 스트룹 과제와 작업기억과제를 사용하여 시간적 요인(반복)과 사건 기반 요인(인지적 충돌)의 함수로서의 중단 충동의 변화를 살펴보았다. 최소작업의 법칙을 비롯한 최신 이론과 마찬가지로 기억 과제에서 중단 충동은 어려운 시행 다음에 더욱 큰 것으로 나타난 반면, 스트룹 과제에서는 반응이 비효율적인 시기인 수행의 초기(초심자) 단계에서만 일치 시행보다 불일치 시행 다음에 중단 충동이 더 큰 것으로 나타났다. 이는 인지적 갈등에 대한 회피반응임을 입증하는 결과이다. 시간적 측면에서 보면 중단 충동은 초기 단계보다 후기 단계에서 더 컸다. 이러한 연구 결과는 만족 지연에 관여하는 비교적 강렬한 동기적 노력의 본질을 명확하게 설명하고 있다.

  • PDF

Application of Adaptive Neuro-Fuzzy Inference System for Interference Management in Heterogeneous Network

  • Palanisamy, Padmaloshani;Sivaraj, Nirmala
    • ETRI Journal
    • /
    • 제40권3호
    • /
    • pp.318-329
    • /
    • 2018
  • Femtocell (FC) technology envisaged as a cost-effective approach to attain better indoor coverage of mobile voice and data service. Deployment of FCs over macrocell forms a heterogeneous network. In urban areas, the key factor limits the successful deployment of FCs is inter-cell interference (ICI), which severely affects the performance of victim users. Autonomous FC transmission power setting is one straightforward way for coordinating ICI in the downlink. Application of intelligent control using soft computing techniques has not yet explored well for wireless networks. In this work, autonomous FC transmission power setting strategy using Adaptive Neuro Fuzzy Inference System is proposed. The main advantage of the proposed method is zero signaling overhead, reduced computational complexity and bare minimum delay in performing power setting of FC base station because only the periodic channel measurement reports fed back by the user equipment are needed. System level simulation results validate the effectiveness of the proposed method by providing much better throughput, even under high interference activation scenario and cell edge users can be prevented from going outage.

Write Request Handling for Static Wear Leveling in Flash Memory (SSD) Controller

  • Choo, Chang;Gajipara, Pooja;Moon, Il-Young
    • Journal of information and communication convergence engineering
    • /
    • 제12권3호
    • /
    • pp.181-185
    • /
    • 2014
  • The lifetime of a solid-state drive (SSD) is limited because of the number of program and erase cycles allowed on its NAND flash blocks. Data cannot be overwritten in an SSD, leading to an out-of-place update every time the data are modified. This result in two copies of the data: the original copy and a modified copy. This phenomenon is known as write amplification and adversely affects the endurance of the memory. In this study, we address the issue of reducing wear leveling through efficient handling of write requests. This results in even wearing of all the blocks, thereby increasing the endurance period. The focus of our work is to logically divert the write requests, which are concentrated to limited blocks, to the less-worn blocks and then measure the maximum number of write requests that the memory can handle. A memory without the proposed algorithm wears out prematurely as compared to that with the algorithm. The main feature of the proposed algorithm is to delay out-of-place updates till the threshold is reached, which results in a low overhead. Further, the algorithm increases endurance by a factor of the threshold level multiplied by the number of blocks in the memory.

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

SINR based Maximum Link Scheduling with Uniform Power in Wireless Sensor Networks

  • Huang, Baogui;Yu, Jiguo;Yu, Dongxiao;Ma, Chunmei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제8권11호
    • /
    • pp.4050-4067
    • /
    • 2014
  • In wireless sensor networks, link scheduling is a fundamental problem related to throughput capacity and delay. For a given set of communication requests $L=\{l_1,l_2,{\cdots},l_n\}$, the MLS (maximum link scheduling) problem aims to find the largest possible subset S of Lsuch that the links in S can be scheduled simultaneously. Most of the existing results did not consider bidirectional transmission setting, which is more realistic in wireless sensor networks. In this paper, under physical interference model SINR (signal-to-noise-plus-interference-ratio) and bidirectional transmission model, we propose a constant factor approximation algorithm MLSA (Maximum Link Scheduling Algorithm) for MLS. It is proved that in the same topology setting the capacity under unidirectional transmission model is lager than that under bidirectional transmission model. However, compared with some work under unidirectional transmission model, the capacity of MLSA is improved about 28% to 45%.

RFID와 무선네트워크 기술을 이용한 자재위치파악 방안 (An Application for Tracking the Location of Material using RFID and Wireless Network Technology)

  • 이남수;송제홍;윤수원;진상윤;권순욱;김예상
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.523-528
    • /
    • 2006
  • 건설자재관리는 건설프로젝트를 수행하는데 있어 중요한 관리 요인 중 하나이며, 공정을 수행하는데 필요한 자재의 공급이 원활하지 못하면 공기지연, 공사비 증대, 작업 효율 저하 등의 문제점을 발생시킬 수 있다. 적시 적소에 자재를 투입하기 위하여 자재의 정확한 위치 파악이 필요하다. 위치 파악 기술로는 GPS, 적외선 통신 시스템(Active Badge), 영상 인식 시스템(EasyLiving} 등이 있으나 건설현장에 적용하기에는 기술적 한계가 있다. 따라서 자재의 정보 및 위치를 파악하기 위해서 현재 사회전반에 걸쳐 대두되고 있는 RFID기술과 무선 네트워크 기술을 이용한 자재 위치 파악의 기술적 가능성을 검토하고, 이 두 기술을 활용한 자재 위치 파악 방안을 제안한다.

  • PDF

Social App Manufacturing 환경의 앱 개발 프로젝트에서 위험영향도 측정 모델 (A Measuring Model of Risk Impact on The App Development Project in The Social App Manufacturing Environment)

  • 백정희;임영환
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제3권9호
    • /
    • pp.335-340
    • /
    • 2014
  • Crowd Sourcing 기반의 Social App Manufacturing 환경에서는 소규모 앱 개발 프로젝트를 익명의 가상팀에 의해 시공간의 제약이 없이 수행하며 이를 위해 앱 개발 관리를 위한 자동화된 방법을 필요로 한다. Social App Manufacturing의 특징인 익명성을 갖는 가상팀은 프로젝트 진행 상황에 대한 가시성의 저하와 프로젝트 완료 여부의 불확실성을 증가시키는 핵심 요인이다. 본 연구에서는 Social App Manufacturing 환경하의 프로젝트 관리 방법의 하나로 개발 지연이 프로젝트에 주는 위험 영향을 정량적으로 측정할 수 있는 위험영향도 측정 모델을 제안한다. 제시한 측정 모델은 작업일정 지연에 따른 위험 영향 유형과 위험영향도 특성함수를 정의하고 진행 성과에 따른 프로젝트 위험영향도 측정식을 제안한다. Social App Manufacturing 환경에서 수행하는 프로젝트 관리에 이 모델을 활용하여 진행 상황에 대한 가시성을 확보하고 일정 지연으로 실패 위험이 발생하는 프로젝트를 식별하고 미리 대처할 수 있도록 한다.