The Study of Onshore Wind Farm Suitability Analysis Process (육상풍력 적지분석 프로세스에 대한 연구)

  • Ko, Jung-Woo;Lee, Byung-Gul
    • Journal of Environmental Science International
    • /
    • v.25 no.3
    • /
    • pp.457-464
    • /
    • 2016
  • The most wind farm development process in Korea still have not been defined since the history of the wind farm development experiences are very short compared to EU and other developed countries. Therefore, most wind farm development company and researchers have a lot of trouble to implement the wind farm development and need a guideline for the process. Establishing the wind farm needs a complex processes such as transportation system, construction conditions, natural environment and wind conditions etc. Specially, for the restricted development area, the social negotiation and legal minds are necessary. In the case, the decision making process of suitable wind farm area using GIS tool is very useful. However, before using GIS technique, we should understand the development processes and the items for surveying tools. Recently, suitability analysis of selecting Onshore Wind Farm has been studied to consider exclusion analysis to solve the limited develop condition problem. This paper proposed the onshore wind farm development process which can suitable to Korea wind farm environment based on European guideline with GIS tool. To estimate the processes, the processes are divided into two parts, the basic design and wind farm planning. Next, the planning stages are classified into five stages in which the factors for each step were considered.

A Study on the Optimal Site Selection by Constraint Mapping and Park Optimization for Offshore Wind Farm in the Southwest Coastal Area (서남해 연안 해상풍력 발전단지 지리적 적합지 선정 및 최적배치에 관한 연구)

  • Jung-Ho, Kim;Geon-Hwa, Ryu;Hong-Chul, Son;Young-Gon, Kim;Chae-Joo, Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.6
    • /
    • pp.1145-1156
    • /
    • 2022
  • In order to effectively secure site suitability for the development of large-scale offshore wind farms, it is essential to minimize the environmental impact of development and analyze the conflicts of benefit between social, ecological, and economic core values. In addition, a preliminary review of site adequacy must be preceded in order not to collide with other used areas in the marine spatial plan. In addition, it is necessary to conduct local meteorological characteristics analysis including wind resources near Jeollanam-do area before project feasibility study. Therefore, wind resource analysis was performed using the observation data of the meteorological mast installed in Wangdeungnyeo near Anmado, Yeonggwang, and the optimal site was selected after excluding geographical constraints related to the location of the offshore wind farm. In addition, the annual energy production was calculated by deriving the optimal wind farm arrangement results suitable for the local wind resources characteristics based on WindSim SW, and it is intended to be used as basic research data for site discovery and selection of suitable sites for future offshore wind farm projects.

Comparison of LCOE of the Southwest Offshore Wind Farm According to Types and Construction Methods of Supporting Structures (해상풍력 지지구조물 형식 및 시공 방법에 따른 서남해 해상풍력실증단지의 균등화발전비용 비교)

  • SeoHo Yoon;Sun Bin Kim;Gil Lim Yoon;Jin-Hak Yi
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.35 no.3
    • /
    • pp.57-66
    • /
    • 2023
  • In order to understand the economic feasibility of an offshore wind farm, this paper analyzed the differences in LCOE (levelized cost of energy) according to the support type and construction method of the substructure in terms of LCOE and sensitivity analysis was conducted according to the main components of LCOE. As for the site to be studied, the Southwest Offshore Wind Farm was selected, and the capital expenditures were calculated according to the size of the offshore wind farm and the installation unit. As a result of the sensitivity analysis, major components showed high sensitivity to availability, turbine related cost, weighted average cost of capital and balance of system related cost. Moreover, the post-piling jacket method, which was representatively applied to the substructure of the offshore wind farm in Korea, was selected as a basic plan to calculate the capital expenditures, and then the capital expenditures of the pre-piling jacket method and the tripod method were calculated and compared. As a result of analyzing the LCOE, it was confirmed that the pre-piling jacket method of the supporting structure lowers the LCOE and improves economic feasibility as the installation number of turbines increases.

A study on Design of Generation Capacity for Offshore Wind Power Plant : The Case of Chonnam Province in Korea (해상풍력 발전용량 설계에 관한 연구 : 전남사례를 중심으로)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Chang, Young-Hak;Lee, Soo-Hyoung;Lee, Sook-Hee
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.3
    • /
    • pp.547-554
    • /
    • 2018
  • Wind energy is widely recognized as one of the cheapest forms of clean and renewable energy. In fact, in several countries, wind energy has achieved cost parity with fossil fuel-based sources of electricity generation for new electricity generation plants. Offshore wind energy development promises to be a significant domestic renewable energy source for the target of korea government 3020 plan. A pivotal activity during the development phase of a wind project is wind resource assessment. Several approaches can be categorized as three basic scales or stages of wind resource assessment: preliminary area identification, area wind resource evaluation, and micrositing. This study is to estimate the wind power capacity of chonnam province offshore area using three basic stages based on the six meteorological mast data. WindPRO was used, one of a well-known wind energy prediction programs and based on more than 25 years of experiences in development of software tools for wind energy project development. The design results of offshore wind power generation capacity is calculated as total 2.52GW with six wind farms in chonnam offshore area.

A Proposal on Livestock Farmstead Planning Design by the Field Survey Results (현장 조사를 통한 신농촌의 축산농장 모형의 개발 연구)

  • 오무영;이신호
    • Journal of Korean Society of Rural Planning
    • /
    • v.1 no.2
    • /
    • pp.67-76
    • /
    • 1995
  • The actual condition of farmstead, mainly livestock facility, was surveyed in ChungChongBukDo in order to find out factors and problems of farmstead planning design. From the data collected, a type, plot, size and scope of farmstead, relationship of house and farmstead, topography, climate, proprietor's opinion on them were analyzed or obtained as the basic design criteria for planning: designs. The best type of farmsteads was individual farm having livestock facilities. They were mostly breeding a kind of livestock without their plan and Bone planning at residing area. The south aspect of the facility was extremely much and slope of the land was mostly 15。 below. Wind blows from East-South in summer and winter wind are West-North extremely much. Sun heat was mostly above 6 hours. In the case of collective and composite farmstead, proprietors wanted that a head of cow has 1,000-3,000 pyeong, the area of facility has 1,500-2,000 pyeong, total area of farmstead has 45,000-400,000 pyeong and an estimated expense is 0.2 - 1.5 billion won. Farmstead planning design was proposed through field survey results and contents of'references. Examples of farmstead planning design were composite and concentrated type and existed according to the situation of road(North, South, East, and West).