• 제목/요약/키워드: Wind Power System

검색결과 1,640건 처리시간 0.03초

MW 풍력터빈의 피드포워드 제어 (Feed Forward Control of the MW Wind Turbine)

  • 임창희;남윤수;김정기;최한순
    • 풍력에너지저널
    • /
    • 제2권1호
    • /
    • pp.82-89
    • /
    • 2011
  • his dissertation is on power control system for MW-class wind turbine. Especially, the control purpose is reduction in electrical power and rotor speed. The base control structure is power curve tracking control using variable speed variable pitch operational type. For the reduction of fluctuations, more control algorithm is needed in above rated wind conditions. Because general pitch control system is low dynamic response as compared with the wind speed change. So, this paper introduces about the pitch feed forward control to minimize fluctuations of the electrical power and rotor speed. To maintain rated electrical power, the algorithm of feed forward control adds feed forward pitch amount to the pitch command of power curve tracking control. The effectiveness of the feed forward control is verified through the simulation.

동특성해석을 위한 계통연계 풍력발전 시스템의 모델링 (Modeling of a Grid-Connected Wind Energy Conversion System for Dynamic Performance Analysis)

  • 추연식;노경수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1358-1360
    • /
    • 2002
  • This paper presents a modeling and simulation of a utility-connected wind energy conversion system with a link of a rectifier and an inverter. It discusses the maximum power control algorithm for the wind turbine and presents the relationship of wind turbine output, rotor speed, power coefficient, tip-speed ratio and wind speed when the wind turbine is operated under the maximum power control algorithm. The control objective is to extract maximum power from wind and transfer the power to the utility. This is achieved by controlling the pitch angle of the wind turbine blades. Pitch control method is mechanically complicated, but the control performance is better than that of the stall regulation method. The simulation results performed on MATLAB will show the variation of generator's rotor speed, pitch angle, and generator output.

  • PDF

High Performance MPPT Based on Variable Speed Generator Driven by Wind Power Generation in Battery Applications

  • Padmanabhan, Sutha;Kaliyappan, Kannan
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권1호
    • /
    • pp.205-213
    • /
    • 2014
  • A wind generator (WG) maximum power point tracking (MPPT) system is presented here. It comprises of a variable-speed wind generator, a high-efficiency boost-type dc/dc converter and a control unit. The advantages of the aimed system are that it does not call for the knowledge of the wind speed or the optimal power characteristics and that it operates at a variable speed, thus providing high efficiency. The WG operates at variable speed and thus suffers lower stress on the shafts and gears compared to constant-speed systems. It results in a better exploitation of the available wind energy, especially in the low wind-speed range of 2.5-4.5 m/s. It does not depend on the WG wind and rotor-speed ratings or the dc/dc converter power rating. Higher reliability, lower complexity and cost, and less mechanical stress of the WG. It can be applied to battery-charging applications.

Inner Evaporative Cooling Wind Power Generator with Non-overlapping Concentrated Windings

  • Li, Wang;Wang, Haifeng
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • 제3권1호
    • /
    • pp.15-19
    • /
    • 2014
  • As the space of the wind power generator stator end is limited, it is difficult for us to place the inner evaporative cooling system in it. We use the non-overlapping concentrated windings scheme to solve the placing and cooling problem. The characteristic of a 5MW direct-driven permanent magnet generator with non-overlapping concentrated windings were analyzed under no-load, rating-load and short-circuit by (Finite Element Method) FEM for verification of design. We studied the connection methods of the stator windings and designed the end connection member. The heat dissipation of the stator end was simulated by FEM, the result showed that the end cooling could satisfy the wind generator operation needs. These results show that the direct-driven permanent magnet wind power generators with non-overlapping concentrated windings and inner evaporative cooling system can solve the cooling problem of wind power generator, and obtain good performance at the same time.

풍력발전단지 탈락 시를 고려한 단지 출력 변동 저감을 위한 HESS의 용량 산정 (Determination of the HESS Capacity for Mitigation of Fluctuation of Wind Farm Output under Consideration of Disconnecting Wind Farm)

  • 김승현;고지한;김일환
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2013년도 전력전자학술대회 논문집
    • /
    • pp.388-389
    • /
    • 2013
  • This paper presents the method for the fluctuation smoothing control by using relaxation time variable control of battery. When the output power of wind farm is changed suddenly, it is necessary to control the output power of wind farm. The smoothing relaxation time is changed within limits of battery output power. Using the hybrid energy storage system (HESS) combined with battery energy storage system and electric double layer capacitor, it is possible to control the output power of wind farm. The capacity of battery is determined by considering the case of the disconnecting wind farm from the grid. To verify the proposed method, simulations are carried out by using PSCAD/EMTDC with actual data of wind farm in the Jeju Island.

  • PDF

해상풍력 연계용 전압형 HVDC가 AC 전력계통의 전압 분포에 미치는 영향 (The Impact of VSC-HVDC Connected an Offshore Wind Power in Voltage Distribution of the AC Power System)

  • 반승길;허재선;강병욱;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.237-238
    • /
    • 2015
  • This paper analyzed the impact of Voltage Sourced Converter High Voltage Direct Current(VSC HVDC) connected an offshore wind power on the Jeju Island electrical power system. Wind power output fluctuates with the changing of wind speed. By changing wind power output occupancy into 100%, 60%, 10% respectively, we can understand the bus voltage distribution controlled by VSC HVDC. PSS/E is used to analyze steady-state simulation results which show effectiveness of the VSC HVDC for Jeju Island power system.

  • PDF

A Study on the Application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm

  • Hur, Jin
    • 조명전기설비학회논문지
    • /
    • 제29권2호
    • /
    • pp.97-103
    • /
    • 2015
  • This paper introduces two on-going projects for DC high temperature superconducting (HTS) cable systems in South Korea. This study proposes the application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm. In order to develop the superconducting DC transmission system model based on HTS power cables, the maximum transfer limits from offshore wind farm are estimated and the system marginal price (SMP) calculated through a Two-Step Power Transfer (TSPT) model based on PV analysis and DC-optimal power flow. The proposed TSPT model will be applied to 2022 KEPCO systems with offshore wind farms.

풍력 발전시스템의 효율적인 연계운전을 위한 0.5MW급 PCS 개발 (Development of a 0.5MW PCS for efficient connection operation of wind power system)

  • 이윤재;최은식;이충우;류강열;조장호;이진
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2012년도 전력전자학술대회 논문집
    • /
    • pp.498-500
    • /
    • 2012
  • According to the climatic characteristics of the wind power output is difficult to predict and a severe strain due to a change in output has been very influential in the grid. Jeju Hangwon wind farm, many of the wind generator is installed in a wide area because it is not have this device that artificially Smoothing is needed. In addition, By the requirements of the power company active power supply / control and improve power system reliability and energy storage during the peak demand for electricity using the energy stored in the power supply is needed. In this paper, Unit 12 in Jeju Hangwon demonstrated 0.5MW PCS and energy storage system associated with the wind through the stabilization of output and the leveling of output and test results will be introduced.

  • PDF

Economic analysis of a 22.9 kV HTS power cable and conventional AC power cable for an offshore wind farm connections

  • Jung, Ga-Eun;Dinh, Minh-Chau;Sung, Hae-Jin;Park, Minwon;Yu, In-Keun
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제20권4호
    • /
    • pp.60-64
    • /
    • 2018
  • As the offshore wind farms increase, interest in the efficient power system configuration of submarine cables is increasing. Currently, transmission system of the offshore wind farm uses almost AC system. High temperature superconducting (HTS) power cable of the high capacity has long been considered as an enabling technology for power transmission. The HTS cable is a feasible way to increase the transmission capacity of electric power and to provide a substantial reduction in transmission losses and a resultant effect of low CO2 emission. The HTS cable reduces its size and laying sectional area in comparison with a conventional XLPE or OF cable. This is an advantage to reduce its construction cost. In this paper, we discuss the economic feasibility of the 22.9 kV HTS power cable and the conventional AC power cables for an offshore wind farm connections. The 22.9 kV HTS power cable cost for the offshore wind farm connections was calculated based on the capital expenditure and operating expense. The economic feasibility of the HTS power cable and the AC power cables were compared for the offshore wind farm connections. In the case of the offshore wind farm with a capacity of 100 MW and a distance of 3 km to the coast, cost of the 22.9 kV HTS power cable for the offshore wind farm connections was higher than 22.9 kV AC power cable and lower than 70 kV AC power transmission cable.

HVDC Overhaul 및 풍력발전을 고려한 제주계통 전력품질 분석 (Power Quality Analysis of Jeju System Considering HVDC Overhaul and Wind Turbines)

  • 채우규;윤기갑;김재언;한지헌
    • 조명전기설비학회논문지
    • /
    • 제22권1호
    • /
    • pp.132-140
    • /
    • 2008
  • 제주의 전력계통은 HVDC로 육지계통과 연계되어 있으며, 2곳의 풍력발전단지가 연계되어 있다. 향후 대용량의 풍력발전이 연계된 상황에서 HVDC Overhaul을 시행하거나 어떤 사고로 HVDC가 끊어진다면 제주계통을 정상적으로 유지하는 것이 어려울 수도 있다. 이에 본 논문은 Overhaul 및 풍력발전이 제주계통에 어떤 영향을 미치는지를 분석하기 위하여 지난 5월에 이루어진 Overhaul 기간에 변전소 2곳 및 풍력발전단지 2곳을 선정하여 전력품질을 측정하고 분석하였다. 또한 풍력발전량에 따른 인근 D/L의 전력품질을 측정함으로써 풍력발전이 전력계통에 미치는 영향을 분석하였고 그 영향정도가 명확하지 않은 부분에 대해서는 통계 데이터를 이용하여 분석하였다. Overhaul 기간에는 주파수가 매우 불안정하였으며, 전압왜형률이 규정치를 초과하기도 하였다. 풍력발전량에 비례한 고조파 전류가 계통으로 유입되었으며, 발전량이 3,000[kW] 이상일 때 인근 D/L의 전압파형이 발전량에 비례하여 왜곡되는 것을 확인할 수 있었다.